If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0635193410002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.495777,"lon":-116.783153,"icon":""}]} |
Location: 00/10-34-063-19W5/2 | |
Location Alias: 00/10-34-63-19 W5M | |
Location Alias 2: 00/10-34-063-19 W5/02 | |
Country: Canada | |
Province: Alberta | |
Township: 063 | |
Meridian: 5 | |
Range: 19 | |
Section: 34 | |
County/Municipality: Municipal District of Greenview No. 16 | |
Well Name: TRILOGY KAYBOB 10-34-63-19 | |
Operator Name: Paramount Resources Ltd. | |
License Number: 0015211 | |
License Date: 1958-05-15 | |
License Status: Suspension | |
Spud Date: 1958-05-28 | |
Final Drill Date: 1958-07-15 | |
Well Total Depth: 3044.00 m | |
Surface Hole Latitude: 54.495777 | |
Surface Hole Longitude: -116.783153 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1958-05-15 | Obtained License |
1958-07-15 | Finished Drilling |
1958-07-17 | Liner Casing Operation Performed |
1958-07-17 | Perforation Treatment Performed - Open-Hole Completion |
1967-09-10 | Perforation Treatment Performed - Jet Perforation |
1967-09-10 | Well Mode changed to Drilled and Cased |
1967-09-11 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1979-03-09 | Well Fluid changed to Gas |
1979-03-09 | Well Mode changed to Testing |
1979-03-10 | Perforation Treatment Performed - Cement Squeeze |
1979-03-10 | Well Fluid changed to Gas |
1979-03-10 | Well Mode changed to Abandoned Zone |
1979-03-17 | Perforation Treatment Performed - Cement Squeeze |
1979-03-17 | Perforation Treatment Performed - Open-Hole Completion |
1979-03-30 | Perforation Treatment Performed - Cement Squeeze |
1979-04-05 | Perforation Treatment Performed - Fractured |
1988-01-28 | Perforation Treatment Performed - Jet Perforation |
1988-01-29 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1989-04-16 | Well Log Performed |
1989-09-14 | Well Log Performed |
1990-07-18 | Well Log Performed |
1990-07-20 | Well Log Performed |
1990-09-01 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1991-11-15 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1991-12-21 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1993-02-14 | Well Log Performed |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1958-07-17 | Open Hole/Barefoot Completion | 2975.50 | 3044.00 | 0 |
1979-04-05 | Fracture | 2991.00 | 3019.00 | 0 |
1988-01-28 | Perforation | 2975.50 | 2977.90 | 13 |
1988-01-28 | Perforation | 2979.10 | 2982.50 | 13 |
1988-01-28 | Perforation | 2983.10 | 2985.50 | 13 |
1988-01-28 | Perforation | 2987.00 | 2989.50 | 13 |
1988-01-29 | Acid Treatment | 2975.50 | 2989.50 | 0 |
1990-09-01 | Acid Treatment | 2991.00 | 3030.00 | 0 |
1991-11-15 | Acid Treatment | 2975.50 | 3044.00 | 0 |
1991-12-21 | Acid Treatment | 2975.50 | 3044.00 | 0 |
1967-09-10 | Perforation | 1773.30 | 1775.20 | 7 |
1967-09-10 | Perforation | 1766.60 | 1769.10 | 7 |
1967-09-10 | Perforation | 1803.80 | 1805.60 | 7 |
1967-09-11 | Acid Treatment | 1766.60 | 1805.60 | 0 |
1979-03-10 | Cement Squeeze | 1766.60 | 1805.60 | 0 |
1979-03-17 | Cement Squeeze | 2975.40 | 2991.00 | 0 |
1979-03-17 | Open Hole/Barefoot Completion | 2991.00 | 3044.00 | 0 |
1979-03-30 | Cement Squeeze | 2975.40 | 2991.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1967 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[5]