X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0635193307000

Well Details

Well ID: 0635193307000
Loading map...
Location: 00/07-33-063-19W5/0
Location Alias: 00/07-33-63-19 W5M
Location Alias 2: 00/07-33-063-19 W5/00
Country: Canada
Province: Alberta
Township: 063
Meridian: 5
Range: 19
Section: 33
County/Municipality: Municipal District of Greenview No. 16
Well Name: TRILOGY KAYBOB 7-33-63-19
Operator Name: Paramount Resources Ltd.
License Number: 0013728
License Date: 1957-07-26
License Status: Suspension
Spud Date: 1957-07-31
Final Drill Date: 1957-10-06
Well Total Depth: 3107.10 m
Surface Hole Latitude: 54.492518
Surface Hole Longitude: -116.808359

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1957-07-26 Obtained License
1957-09-16 Drill Stem Test Performed
1957-09-17 Drill Stem Test Performed
1957-09-28 Drill Stem Test Performed
1957-10-05 Drill Stem Test Performed
1957-10-06 Drill Stem Test Performed
1957-10-06 Finished Drilling
1957-10-06 Well Mode changed to Drilled and Cased
1957-10-13 Production Casing Operation Performed
1957-10-17 Perforation Treatment Performed - Jet Perforation
1957-10-24 Well Began Production
1957-10-24 Well Fluid changed to Crude Oil
1957-10-24 Well Mode changed to Flowing
1966-07-28 Well Fluid changed to Crude Oil
1966-07-28 Well Mode changed to Pumping
1970-07-28 Well Fluid changed to Crude Oil
1970-07-28 Well Mode changed to Suspended
1977-11-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1977-11-16 Well Fluid changed to Crude Oil
1977-11-16 Well Mode changed to Flowing
1978-10-16 Well Fluid changed to Crude Oil
1978-10-16 Well Mode changed to Pumping
1982-01-10 Well Fluid changed to Crude Oil
1982-01-10 Well Mode changed to Suspended
1986-01-05 Well Fluid changed to Crude Oil
1986-01-05 Well Mode changed to Flowing
1986-09-22 Well Fluid changed to Crude Oil
1986-09-22 Well Mode changed to Suspended
1987-03-11 Well Fluid changed to Crude Oil
1987-03-11 Well Mode changed to Flowing
1996-05-04 Perforation Treatment Performed - Jet Perforation
1996-05-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-06-01 Well Fluid changed to Crude Oil
1999-06-01 Well Mode changed to Suspended
2003-02-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-02-15 Plug Back Performed
2003-02-15 Well Fluid changed to Crude Oil
2003-02-15 Well Mode changed to Abandoned Zone

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1957-10-17 Perforation 3004.70 3019.30 13
1957-10-17 Perforation 3025.40 3029.10 13
1977-11-16 Acid Treatment 3004.70 3029.10 0
1996-05-04 Perforation 3041.90 3046.50 14
1996-05-06 Acid Treatment 3004.70 3046.50 0
2003-02-15 Packing Device Capped w/Cement 2982.00 2990.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1977 144 0.0 0.0 0.0
1978 1335 0.0 0.0 0.0
1979 1320 0.0 0.0 0.0
1986 889 0.0 0.0 0.0
1987 5831 0.0 0.0 0.0
1988 6426 0.0 0.0 0.0
1989 7140 0.0 0.0 0.0
1990 7641 0.0 0.0 0.0
1991 8379 0.0 0.0 0.0
1992 7617 0.0 0.0 0.0
1993 8584 0.0 0.0 0.0
1994 2082 0.0 0.0 0.0
1995 1 0.0 0.0 0.0
1996 2911 0.0 0.0 0.0
1997 8686 0.0 0.0 0.0
1998 8526 0.0 0.0 0.0
1999 3432 0.0 0.0 0.0

For data sources see[5]

References