X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0635192710002

Well Details

Well ID: 0635192710002
Loading map...
Location: 00/10-27-063-19W5/2
Location Alias: 00/10-27-63-19 W5M
Location Alias 2: 00/10-27-063-19 W5/02
Country: Canada
Province: Alberta
Township: 063
Meridian: 5
Range: 19
Section: 27
County/Municipality: Municipal District of Greenview No. 16
Well Name: TRILOGY KAYBOB 10-27-63-19
Operator Name: Paramount Resources Ltd.
License Number: 0016444
License Date: 1958-12-18
License Status: Suspension
Spud Date: 1958-12-23
Final Drill Date: 1959-02-24
Well Total Depth: 3082.10 m
Surface Hole Latitude: 54.481666
Surface Hole Longitude: -116.782678

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1958-12-18 Obtained License
1959-02-24 Drill Stem Test Performed
1959-02-24 Finished Drilling
1959-02-24 Well Mode changed to Drilled and Cased
1959-02-27 Drill Stem Test Performed
1959-02-28 Liner Casing Operation Performed
1959-03-02 Perforation Treatment Performed - Open-Hole Completion
1963-12-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-11-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-06-19 Perforation Treatment Performed - Cement Squeeze
1979-06-25 Perforation Treatment Performed - Open-Hole Completion
1979-06-26 Perforation Treatment Performed - Abrasa-Jet Perforation
1979-06-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-01-06 Perforation Treatment Performed - Jet Perforation
1988-01-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-02-11 Well Log Performed
1989-04-15 Well Log Performed
1991-07-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-07-30 Perforation Treatment Performed - Chemical Squeeze
1994-02-24 Well Mode changed to Drilled and Cased

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1959-03-02 Open Hole/Barefoot Completion 3006.20 3082.10 0
1988-01-06 Perforation 3004.30 3013.10 13
1988-01-06 Perforation 3015.90 3024.70 13
1988-01-07 Acid Treatment 3004.30 3024.70 0
1991-07-30 Chemical Squeeze 2958.90 3082.10 0
1991-07-30 Acid Treatment 2958.90 3082.10 0
1963-12-09 Acid Treatment 3006.90 3082.10 0
1964-11-28 Acid Treatment 3006.90 3082.10 0
1979-06-19 Cement Squeeze 3006.20 3024.50 0
1979-06-25 Open Hole/Barefoot Completion 3024.50 3082.10 0
1979-06-26 Hydra Jet Perforation 2958.90 2960.20 0
1979-06-26 Hydra Jet Perforation 2961.70 2966.30 0
1979-06-26 Hydra Jet Perforation 2967.80 2969.10 0
1979-06-27 Acid Treatment 2958.90 3082.10 0

For data sources see[4]



References