If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0635192702000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.474444,"lon":-116.783194,"icon":""}]} |
Location: 00/02-27-063-19W5/0 | |
Location Alias: 00/02-27-63-19 W5M | |
Location Alias 2: 00/02-27-063-19 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 063 | |
Meridian: 5 | |
Range: 19 | |
Section: 27 | |
County/Municipality: Municipal District of Greenview No. 16 | |
Well Name: TRILOGY KAYBOB 2-27-63-19 | |
Operator Name: Paramount Resources Ltd. | |
License Number: 0016966 | |
License Date: 1959-04-23 | |
License Status: Abandoned | |
Spud Date: 1959-05-20 | |
Final Drill Date: 1959-07-05 | |
Well Total Depth: 3081.80 m | |
Surface Hole Latitude: 54.474444 | |
Surface Hole Longitude: -116.783194 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1959-04-23 | Obtained License |
1959-06-01 | Drill Stem Test Performed |
1959-06-02 | Drill Stem Test Performed |
1959-07-05 | Finished Drilling |
1959-07-05 | Well Mode changed to Drilled and Cased |
1959-07-06 | Liner Casing Operation Performed |
1959-07-06 | Perforation Treatment Performed - Open-Hole Completion |
1959-07-24 | Well Began Production |
1959-07-24 | Well Fluid changed to Crude Oil |
1959-07-24 | Well Mode changed to Flowing |
1966-08-25 | Well Fluid changed to Crude Oil |
1966-08-25 | Well Mode changed to Pumping |
1970-07-28 | Well Fluid changed to Crude Oil |
1970-07-28 | Well Mode changed to Suspended |
1976-04-24 | Well Fluid changed to Crude Oil |
1976-04-24 | Well Mode changed to Pumping |
1980-02-26 | Perforation Treatment Performed - Cement Squeeze |
1980-03-02 | Perforation Treatment Performed - Jet Perforation |
1980-03-04 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1980-03-06 | Perforation Treatment Performed - Jet Perforation |
1980-03-08 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1982-01-10 | Well Fluid changed to Crude Oil |
1982-01-10 | Well Mode changed to Suspended |
1988-08-29 | Perforation Treatment Performed - Jet Perforation |
1988-08-29 | Well Log Performed |
1988-08-31 | Well Fluid changed to Crude Oil |
1988-08-31 | Well Mode changed to Flowing |
1992-10-08 | Well Log Performed |
1992-10-09 | Well Log Performed |
1992-10-11 | Well Log Performed |
1992-11-07 | Well Began Injection |
1992-11-07 | Well Fluid changed to Solvent |
1992-11-07 | Well Type changed to Injection |
1992-12-07 | Well Log Performed |
2007-06-01 | Well Fluid changed to Water |
2007-06-01 | Well Type changed to Injection |
2008-06-23 | Well Fluid changed to Water |
2008-06-23 | Well Mode changed to Suspended |
2008-06-23 | Well Type changed to Injection |
2019-11-07 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2019-11-07 | Plug Back Performed |
2019-11-07 | Well Fluid changed to Water |
2019-11-07 | Well Log Performed |
2019-11-07 | Well Mode changed to Abandoned Zone |
2019-11-07 | Well Type changed to Injection |
2019-11-09 | Well Log Performed |
2019-11-10 | Well Log Performed |
2019-11-11 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2019-11-11 | Plug Back Performed |
2019-11-11 | Well Log Performed |
2019-11-12 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2019-11-12 | Perforation Treatment Performed - Jet Perforation |
2019-11-12 | Plug Back Performed |
2019-11-12 | Well Log Performed |
2019-11-13 | Perforation Treatment Performed - Cement Plug |
2019-11-13 | Perforation Treatment Performed - Cement Squeeze |
2019-11-13 | Plug Back Performed |
2019-11-14 | Perforation Treatment Performed - Jet Perforation |
2019-11-14 | Well Log Performed |
2019-11-19 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2019-11-19 | Plug Back Performed |
2019-11-19 | Well Log Performed |
2019-11-20 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2019-11-20 | Perforation Treatment Performed - Jet Perforation |
2019-11-20 | Plug Back Performed |
2019-11-20 | Well Log Performed |
2020-01-21 | Well Abandoned |
2020-01-21 | Well Fluid changed to Water |
2020-01-21 | Well Mode changed to Abandoned |
2020-01-21 | Well Type changed to Injection |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1959-07-06 | Open Hole/Barefoot Completion | 3003.50 | 3081.80 | 0 |
1988-08-29 | Perforation | 3027.50 | 3028.50 | 20 |
1988-08-29 | Perforation | 3032.00 | 3035.00 | 20 |
2019-11-07 | Packing Device Capped w/Cement | 2987.20 | 2995.20 | 0 |
2019-11-11 | Packing Device Capped w/Cement | 2932.00 | 2940.00 | 0 |
2019-11-12 | Packing Device Capped w/Cement | 2899.00 | 2907.00 | 0 |
2019-11-12 | Perforation | 2531.00 | 2532.00 | 20 |
2019-11-12 | Perforation | 2503.00 | 2504.00 | 20 |
2019-11-13 | Cement Squeeze | 2531.00 | 2532.00 | 0 |
2019-11-13 | Cement Squeeze | 2503.00 | 2504.00 | 0 |
2019-11-13 | Cement Plug | 2379.00 | 2503.00 | 0 |
1980-02-26 | Cement Squeeze | 3003.50 | 3081.80 | 0 |
2019-11-14 | Perforation | 2139.00 | 2140.00 | 20 |
2019-11-14 | Perforation | 2070.00 | 2071.00 | 20 |
2019-11-14 | Perforation | 2025.00 | 2026.00 | 20 |
2019-11-14 | Perforation | 1950.00 | 1951.00 | 20 |
2019-11-19 | Packing Device Capped w/Cement | 1140.00 | 1148.00 | 0 |
2019-11-20 | Perforation | 602.00 | 603.00 | 20 |
2019-11-20 | Packing Device Capped w/Cement | 584.00 | 592.00 | 0 |
1980-03-02 | Perforation | 3046.20 | 3048.00 | 13 |
1980-03-02 | Perforation | 3049.20 | 3057.80 | 13 |
1980-03-04 | Acid Treatment | 3046.20 | 3057.80 | 0 |
1980-03-06 | Perforation | 3038.70 | 3043.00 | 13 |
1980-03-08 | Acid Treatment | 3038.70 | 3043.00 | 0 |
1988-08-29 | Perforation | 3009.00 | 3021.00 | 20 |
1988-08-29 | Perforation | 3024.00 | 3026.00 | 20 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1961 | 0 | 0.0 | 0.0 | 0.0 |
1962 | 0 | 0.0 | 0.0 | 0.0 |
1963 | 0 | 0.0 | 0.0 | 0.0 |
1964 | 0 | 0.0 | 0.0 | 0.0 |
1965 | 0 | 0.0 | 0.0 | 0.0 |
1966 | 0 | 0.0 | 0.0 | 0.0 |
1968 | 127 | 0.0 | 0.0 | 0.0 |
1976 | 4322 | 0.0 | 0.0 | 0.0 |
1977 | 3680 | 0.0 | 0.0 | 0.0 |
1979 | 3253 | 0.0 | 0.0 | 0.0 |
1980 | 1159 | 0.0 | 0.0 | 0.0 |
1981 | 2234 | 0.0 | 0.0 | 0.0 |
1988 | 2832 | 0.0 | 0.0 | 0.0 |
1989 | 8530 | 0.0 | 0.0 | 0.0 |
1990 | 8188 | 0.0 | 0.0 | 0.0 |
1991 | 8544 | 0.0 | 0.0 | 0.0 |
1992 | 4292 | 0.0 | 0.0 | 0.0 |
1993 | 0 | 0.0 | 0.0 | 0.0 |
1994 | 0 | 0.0 | 0.0 | 0.0 |
1995 | 0 | 0.0 | 0.0 | 0.0 |
1996 | 0 | 0.0 | 0.0 | 0.0 |
1997 | 0 | 0.0 | 0.0 | 0.0 |
1998 | 0 | 0.0 | 0.0 | 0.0 |
1999 | 0 | 0.0 | 0.0 | 0.0 |
2000 | 0 | 0.0 | 0.0 | 0.0 |
2001 | 0 | 0.0 | 0.0 | 0.0 |
2002 | 0 | 0.0 | 0.0 | 0.0 |
2003 | 0 | 0.0 | 0.0 | 0.0 |
2004 | 0 | 0.0 | 0.0 | 0.0 |
2005 | 0 | 0.0 | 0.0 | 0.0 |
2006 | 0 | 0.0 | 0.0 | 0.0 |
2007 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2019-11-21 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[6]