X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0635192212022

Well Details

Well ID: 0635192212022
Loading map...
Location: 02/12-22-063-19W5/2
Location Alias: 02/12-22-63-19 W5M
Location Alias 2: 02/12-22-063-19 W5/02
Country: Canada
Province: Alberta
Township: 063
Meridian: 5
Range: 19
Section: 22
County/Municipality: Municipal District of Greenview No. 16
Well Name: TRILOGY ET AL KAYBOB 12-22-63-19
Operator Name: Paramount Resources Ltd.
License Number: 0021070
License Date: 1961-07-13
License Status: Suspension
Spud Date: 1961-07-21
Final Drill Date: 1961-08-01
Well Total Depth: 1832.80 m
Surface Hole Latitude: 54.467027
Surface Hole Longitude: -116.795860

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1961-07-13 Obtained License
1961-08-01 Finished Drilling
1961-08-01 Well Mode changed to Drilled and Cased
1961-08-02 Production Casing Operation Performed
1961-08-03 Perforation Treatment Performed - Jet Perforation
1961-08-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1961-08-07 Perforation Treatment Performed - Fractured
1988-01-14 Well Log Performed
2000-11-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-11-07 Plug Back Performed
2000-11-07 Well Log Performed
2000-11-10 Well Log Performed
2000-11-11 Well Log Performed
2000-11-12 Perforation Treatment Performed - Jet Perforation
2000-11-13 Perforation Treatment Performed - Fractured
2012-09-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-09-29 Plug Back Performed
2012-09-29 Well Log Performed
2012-09-29 Well Mode changed to Abandoned Zone

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1961-08-03 Perforation 1805.60 1808.70 13
1961-08-03 Perforation 1809.00 1809.60 13
1961-08-07 Acid Treatment 1805.60 1809.60 0
1961-08-07 Fracture 1805.60 1809.60 0
2000-11-07 Packing Device Capped w/Cement 1789.00 1797.00 0
2000-11-12 Perforation 1517.00 1519.00 17
2000-11-13 Fracture 1517.00 1519.00 0
2012-09-29 Packing Device Capped w/Cement 1504.80 1512.80 0

For data sources see[4]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-09-29 No Incident Encountered 0.00 0.00

For data sources see[5]

References