X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0635192208000

Well Details

Well ID: 0635192208000
Loading map...
Location: 00/08-22-063-19W5/0
Location Alias: 00/08-22-63-19 W5M
Location Alias 2: 00/08-22-063-19 W5/00
Country: Canada
Province: Alberta
Township: 063
Meridian: 5
Range: 19
Section: 22
County/Municipality: Municipal District of Greenview No. 16
Well Name: TRILOGY BHLU 1 KAYBOB 8-22-63-19
Operator Name: Paramount Resources Ltd.
License Number: 0148160
License Date: 1991-02-27
License Status: Suspension
Spud Date: 1991-03-20
Final Drill Date: 1991-04-25
Well Total Depth: 3215.00 m
Surface Hole Latitude: 54.466543
Surface Hole Longitude: -116.781523

For data sources see[1][2]

Well History

Date Event
1991-02-27 Obtained License
1991-03-22 Surface Casing Operation Performed
1991-04-01 Direction Drilling Operation Performed - Deviate
1991-04-25 Finished Drilling
1991-04-25 Well Mode changed to Drilled and Cased
1991-04-26 Well Log Performed
1991-04-29 Well Log Performed
1991-05-01 Production Casing Operation Performed
1991-05-01 Well Log Performed
1991-05-02 Rig Released
1991-06-15 Well Began Production
1991-06-15 Well Fluid changed to Crude Oil
1991-06-15 Well Log Performed
1991-06-15 Well Mode changed to Flowing
1991-06-16 Perforation Treatment Performed - Jet Perforation
1994-02-02 Well Fluid changed to Crude Oil
1994-02-02 Well Mode changed to Pumping
1995-06-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-05-07 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-03-19 Perforation Treatment Performed - Fractured
2001-05-02 Perforation Treatment Performed - Acid Squeeze - Press Used
2003-03-06 Perforation Treatment Performed - Acid Squeeze - Press Used
2013-07-31 Well Fluid changed to Crude Oil
2013-07-31 Well Mode changed to Suspended

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1991-04-01 2301.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1991-06-16 Perforation 3135.00 3136.00 13
2003-03-06 Acid Treatment 3135.00 3136.00 0
2003-03-06 Acid Treatment 3139.00 3140.50 0
2003-03-06 Acid Treatment 3150.50 3163.00 0
1991-06-16 Perforation 3139.00 3140.50 13
1991-06-16 Perforation 3150.50 3163.00 13
1991-06-16 Perforation 3169.50 3177.50 13
1991-06-16 Perforation 3179.50 3188.80 13
1995-06-09 Acid Treatment 3135.00 3188.80 0
1999-05-07 Acid Treatment 3139.00 3188.80 0
2000-03-19 Fracture 3135.00 3188.80 0
2001-05-02 Acid Treatment 3135.00 3188.80 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1991 4181 0.0 0.0 0.0
1992 7579 0.0 0.0 0.0
1993 6430 0.0 0.0 0.0
1994 7674 0.0 0.0 0.0
1995 8124 0.0 0.0 0.0
1996 6196 0.0 0.0 0.0
1997 8687 0.0 0.0 0.0
1998 8188 0.0 0.0 0.0
1999 7312 0.0 0.0 0.0
2000 7147 0.0 0.0 0.0
2001 7131 0.0 0.0 0.0
2002 7710 0.0 0.0 0.0
2003 802 0.0 0.0 0.0
2004 4151 0.0 0.0 0.0
2005 8093 0.0 0.0 0.0
2006 7532 0.0 0.0 0.0
2007 5845 0.0 0.0 0.0
2008 7790 0.0 0.0 0.0
2009 8325 0.0 0.0 0.0
2010 7764 0.0 0.0 0.0
2011 7410 0.0 0.0 0.0
2012 8048 0.0 0.0 0.0
2013 2158 0.0 0.0 0.0

For data sources see[6]

References