X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0635183011002

Well Details

Well ID: 0635183011002
Loading map...
Location: 00/11-30-063-18W5/2
Location Alias: 00/11-30-63-18 W5M
Location Alias 2: 00/11-30-063-18 W5/02
Country: Canada
Province: Alberta
Township: 063
Meridian: 5
Range: 18
Section: 30
County/Municipality: Municipal District of Greenview No. 16
Well Name: TRILOGY KAYBOB 11-30-63-18
Operator Name: Paramount Resources Ltd.
License Number: 0093090
License Date: 1981-11-03
License Status: Suspension
Spud Date: 1981-11-09
Final Drill Date: 1981-11-22
Well Total Depth: 1800.00 m
Surface Hole Latitude: 54.482674
Surface Hole Longitude: -116.714551

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1981-11-03 Obtained License
1981-11-16 Drill Stem Test Performed
1981-11-20 Drill Stem Test Performed
1981-11-22 Finished Drilling
1981-11-22 Well Log Performed
1981-11-24 Drill Stem Test Performed
1981-11-25 Drill Stem Test Performed
1981-11-26 Drill Stem Test Performed
1981-11-27 Drill Stem Test Performed
1981-11-29 Production Casing Operation Performed
1981-12-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-12-04 Perforation Treatment Performed - Jet Perforation
1981-12-05 Perforation Treatment Performed - Fractured
1982-01-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1982-01-20 Perforation Treatment Performed - Jet Perforation
1982-01-21 Perforation Treatment Performed - Jet Perforation
1982-01-26 Perforation Treatment Performed - Cement Squeeze
1982-01-27 Perforation Treatment Performed - Cement Squeeze
1982-01-29 Perforation Treatment Performed - Cement Squeeze
1982-02-03 Perforation Treatment Performed - Jet Perforation
1982-02-10 Perforation Treatment Performed - Fractured
1982-03-10 Well Mode changed to Drilled and Cased

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1981-12-04 Perforation 1746.00 1748.00 13
1982-02-03 Perforation 1487.00 1489.00 7
1982-02-10 Fracture 1487.00 1489.00 0
1981-12-04 Acid Treatment 1746.00 1748.00 0
1981-12-05 Fracture 1746.00 1748.00 0
1982-01-20 Packing Device Capped w/Cement 1723.00 1732.00 0
1982-01-20 Perforation 1499.00 1500.00 7
1982-01-21 Perforation 1465.00 1466.00 7
1982-01-26 Cement Squeeze 1499.00 1500.00 0
1982-01-27 Cement Squeeze 1465.00 1466.00 0
1982-01-29 Cement Squeeze 1465.00 1466.00 0

For data sources see[4]



References