X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0635182608002

Well Details

Well ID: 0635182608002
Loading map...
Location: 00/08-26-063-18W5/2
Location Alias: 00/08-26-63-18 W5M
Location Alias 2: 00/08-26-063-18 W5/02
Country: Canada
Province: Alberta
Township: 063
Meridian: 5
Range: 18
Section: 26
County/Municipality: Municipal District of Greenview No. 16
Well Name: TRILOGY WASCANA KAYBOB 8-26-63-18
Operator Name: Paramount Resources Ltd.
License Number: 0191711
License Date: 1996-09-25
License Status: Issued
Spud Date: 1996-10-17
Final Drill Date: 1996-11-10
Well Total Depth: 3010.00 m
Surface Hole Latitude: 54.477099
Surface Hole Longitude: -116.599808

For data sources see[1][2]

Well History

Date Event
1996-09-25 Obtained License
1996-10-17 Well Log Performed
1996-10-18 Surface Casing Operation Performed
1996-11-10 Finished Drilling
1996-11-10 Well Mode changed to Drilled and Cased
1996-11-13 Well Log Performed
1996-11-16 Production Casing Operation Performed
1996-11-16 Rig Released
1996-11-27 Well Log Performed
1996-11-29 Perforation Treatment Performed - Jet Perforation
1996-12-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-03-19 Well Log Performed
2001-07-01 Perforation Treatment Performed - Fractured
2003-07-01 Well Log Performed
2003-07-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-07-02 Perforation Treatment Performed - Jet Perforation
2003-07-02 Plug Back Performed
2003-07-02 Well Log Performed
2003-07-03 Perforation Treatment Performed - Remedial Casing
2003-07-06 Perforation Treatment Performed - Remedial Casing
2003-07-07 Perforation Treatment Performed - Jet Perforation
2003-07-07 Well Log Performed
2003-07-09 Perforation Treatment Performed - Fractured
2003-09-11 Well Began Production
2003-09-11 Well Fluid changed to Gas
2003-09-11 Well Mode changed to Flowing
2011-03-01 Well Fluid changed to Gas
2011-03-01 Well Mode changed to Pumping

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1996-11-29 Perforation 2931.00 2957.00 18
2003-07-07 Perforation 1466.50 1469.50 17
2003-07-09 Fracture 1466.50 1469.50 0
1996-12-01 Acid Treatment 2931.00 2957.00 0
2001-07-01 Fracture 2931.00 2957.00 0
2003-07-02 Packing Device Capped w/Cement 2915.00 2923.00 0
2003-07-02 Packing Device Capped w/Cement 1567.00 1575.00 0
2003-07-02 Perforation 1490.00 1491.00 24
2003-07-02 Perforation 1450.00 1451.00 24
2003-07-03 Remedial Casing Cementing 1450.00 1451.00 0
2003-07-06 Remedial Casing Cementing 1490.00 1491.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2003 2688 0.0 0.0 0.0
2004 8783 0.0 0.0 0.0
2005 8717 0.0 0.0 0.0
2006 8499 0.0 0.0 0.0
2007 8583 0.0 0.0 0.0
2008 8548 0.0 0.0 0.0
2009 8589 0.0 0.0 0.0
2010 8759 0.0 0.0 0.0
2011 8651 0.0 0.0 0.0
2012 8463 0.0 0.0 0.0
2013 8661 0.0 0.0 0.0
2014 7264 0.0 0.0 0.0
2015 1564 0.0 0.0 0.0
2016 6931 0.0 0.0 0.0
2017 6807 0.0 0.0 0.0
2018 7979 0.0 0.0 0.0
2019 2001 0.0 0.0 0.0
2020 1679 0.0 0.0 0.0

For data sources see[5]

References