X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0635182510003

Well Details

Well ID: 0635182510003
Loading map...
Location: 00/10-25-063-18W5/3
Location Alias: 00/10-25-63-18 W5M
Location Alias 2: 00/10-25-063-18 W5/03
Country: Canada
Province: Alberta
Township: 063
Meridian: 5
Range: 18
Section: 25
County/Municipality: Municipal District of Greenview No. 16
Well Name: TRILOGY KAYBOB 10-25-63-18
Operator Name: Paramount Resources Ltd.
License Number: 0023694
License Date: 1963-01-23
License Status: Suspension
Spud Date: 1963-02-01
Final Drill Date: 1963-03-14
Well Total Depth: 3023.60 m
Surface Hole Latitude: 54.481625
Surface Hole Longitude: -116.581470

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1963-01-23 Obtained License
1963-02-10 Drill Stem Test Performed
1963-02-11 Drill Stem Test Performed
1963-02-12 Drill Stem Test Performed
1963-02-13 Drill Stem Test Performed
1963-02-16 Drill Stem Test Performed
1963-03-11 Drill Stem Test Performed
1963-03-12 Drill Stem Test Performed
1963-03-14 Finished Drilling
1963-03-14 Well Mode changed to Drilled and Cased
1963-03-18 Production Casing Operation Performed
1963-03-25 Perforation Treatment Performed - Bullet Perforation
1980-02-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-02-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1980-02-22 Perforation Treatment Performed - Jet Perforation
1980-02-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-02-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1980-02-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-02-28 Perforation Treatment Performed - Jet Perforation
1980-03-06 Perforation Treatment Performed - Fractured
1988-06-01 Well Log Performed
1988-06-08 Perforation Treatment Performed - Jet Perforation
1988-06-09 Perforation Treatment Performed - Cement Squeeze
1988-06-23 Perforation Treatment Performed - Cement Squeeze
1988-06-26 Perforation Treatment Performed - Bullet Perforation
1988-06-28 Perforation Treatment Performed - Jet Perforation
1988-06-28 Well Log Performed
1988-07-05 Perforation Treatment Performed - Fractured
1988-07-19 Well Log Performed
1988-07-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1988-07-27 Plug Back Performed
1988-07-28 Well Log Performed
1988-07-29 Perforation Treatment Performed - Jet Perforation
1988-07-29 Well Log Performed
1988-08-04 Perforation Treatment Performed - Fractured
1988-08-10 Perforation Treatment Performed - Jet Perforation
1988-08-29 Well Log Performed
1988-08-31 Perforation Treatment Performed - Fractured
1989-01-01 Well Began Production
1989-01-01 Well Fluid changed to Gas
1989-01-01 Well Mode changed to Flowing
2008-09-01 Well Fluid changed to Gas
2008-09-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1963-03-25 Bullet Perforation 1756.90 1763.60 7
1988-06-08 Perforation 1539.80 1543.50 7
1988-06-09 Cement Squeeze 1477.40 1480.70 0
1988-06-23 Cement Squeeze 1539.80 1543.50 0
1988-06-26 Bullet Perforation 1756.90 1763.60 7
1988-06-28 Perforation 1757.00 1761.00 13
1988-07-05 Fracture 1756.90 1761.00 0
1988-07-27 Packing Device Capped w/Cement 1715.00 1723.00 0
1988-07-29 Perforation 1499.00 1504.00 13
1988-08-04 Fracture 1499.00 1504.00 0
1988-08-10 Perforation 1477.40 1480.70 13
1980-02-16 Acid Treatment 1756.90 1763.60 0
1988-08-31 Fracture 1477.40 1480.70 0
1980-02-21 Packing Device Capped w/Cement 1729.70 1743.40 0
1980-02-22 Perforation 1539.80 1543.50 7
1980-02-23 Acid Treatment 1539.80 1543.50 0
1980-02-27 Packing Device Capped w/Cement 1530.10 1530.10 0
1980-02-28 Perforation 1477.40 1480.70 7
1980-02-28 Acid Treatment 1477.40 1480.70 0
1980-03-06 Fracture 1477.40 1480.70 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1989 3 0.0 0.0 0.0
1990 74 0.0 0.0 0.0
1991 35 0.0 0.0 0.0
1992 1377 0.0 0.0 0.0

For data sources see[5]

References