X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0635182101000

Well Details

Well ID: 0635182101000
Loading map...
Location: 00/01-21-063-18W5/0
Location Alias: 00/01-21-63-18 W5M
Location Alias 2: 00/01-21-063-18 W5/00
Country: Canada
Province: Alberta
Township: 063
Meridian: 5
Range: 18
Section: 21
County/Municipality: Municipal District of Greenview No. 16
Well Name: SCL HZ KAYBOB 1-21-63-18
Operator Name: Shell Canada Limited
License Number: 0453662
License Date: 2013-01-16
License Status: Issued
Spud Date: 2013-03-06
Final Drill Date: 2013-06-25
Well Total Depth: 5228.00 m
Surface Hole Latitude: 54.482392
Surface Hole Longitude: -116.657309

For data sources see[1][2]

Well History

Date Event
2013-01-16 Obtained License
2013-03-07 Surface Casing Operation Performed
2013-03-15 Direction Drilling Operation Performed - Deviate
2013-03-18 Well Log Performed
2013-03-19 Intermediate Casing Operation Performed
2013-06-15 Direction Drilling Operation Performed - Horizontal
2013-06-25 Finished Drilling
2013-06-25 Well Log Performed
2013-06-25 Well Mode changed to Drilled and Cased
2013-06-26 Well Log Performed
2013-06-29 Production Casing Operation Performed
2013-06-29 Rig Released
2013-08-28 Perforation Treatment Performed - Jet Perforation
2013-08-30 Perforation Treatment Performed - Fractured
2013-08-30 Perforation Treatment Performed - Jet Perforation
2013-08-31 Perforation Treatment Performed - Fractured
2013-08-31 Perforation Treatment Performed - Jet Perforation
2013-09-01 Perforation Treatment Performed - Fractured
2013-09-01 Perforation Treatment Performed - Jet Perforation
2013-09-02 Perforation Treatment Performed - Fractured
2013-09-02 Perforation Treatment Performed - Jet Perforation
2013-09-03 Perforation Treatment Performed - Fractured
2013-09-03 Perforation Treatment Performed - Jet Perforation
2013-09-03 Well Log Performed
2013-09-10 Well Log Performed
2013-11-26 Well Began Production
2013-11-26 Well Fluid changed to Shale Gas Only
2013-11-26 Well Mode changed to Flowing
2014-08-19 Well Fluid changed to Shale Gas Only
2014-08-19 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2013-03-06 Akita Drilling Ltd. 45 N/A Set Surface

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2013-03-15 2408.40 Deviate (5 - 79 degrees)
2013-06-15 3077.60 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2013-08-28 Perforation 5012.00 5012.50 22
2013-08-30 Perforation 4740.00 4740.30 24
2013-08-30 Perforation 4705.00 4705.20 27
2013-08-30 Perforation 4672.00 4672.10 23
2013-08-30 Fracture 4672.00 4842.60 0
2013-08-31 Perforation 4638.00 4638.60 22
2013-08-31 Perforation 4604.00 4604.50 22
2013-08-31 Perforation 4570.00 4570.40 23
2013-08-31 Perforation 4536.00 4536.30 24
2013-08-31 Perforation 4502.00 4502.20 27
2013-08-31 Perforation 4468.00 4468.10 23
2013-08-28 Perforation 4979.00 4979.40 23
2013-08-31 Fracture 4468.00 4638.60 0
2013-08-31 Perforation 4433.00 4433.60 22
2013-08-31 Perforation 4400.00 4400.50 22
2013-08-31 Perforation 4364.00 4364.40 23
2013-08-31 Perforation 4332.00 4332.30 24
2013-08-31 Perforation 4296.00 4296.20 27
2013-08-31 Perforation 4264.00 4264.10 23
2013-08-31 Fracture 4264.00 4433.60 0
2013-08-31 Perforation 4231.00 4231.60 22
2013-08-31 Perforation 4196.00 4196.50 22
2013-08-28 Perforation 4944.00 4944.30 24
2013-08-31 Perforation 4164.00 4164.40 23
2013-08-31 Perforation 4128.00 4128.30 24
2013-08-31 Perforation 4093.00 4093.20 27
2013-08-31 Perforation 4060.00 4060.10 23
2013-09-01 Fracture 4060.00 4231.60 0
2013-09-01 Perforation 4026.00 4026.60 22
2013-09-01 Perforation 3992.00 3992.50 22
2013-09-01 Perforation 3958.00 3958.40 23
2013-09-01 Perforation 3924.00 3924.30 24
2013-09-01 Perforation 3890.00 3890.20 27
2013-08-28 Perforation 4909.00 4909.20 27
2013-09-01 Perforation 3856.00 3856.10 23
2013-09-01 Fracture 3856.00 4026.60 0
2013-09-02 Perforation 3822.00 3822.60 22
2013-09-02 Perforation 3788.00 3788.50 22
2013-09-02 Perforation 3754.00 3754.40 23
2013-09-02 Perforation 3720.00 3720.30 24
2013-09-02 Perforation 3686.00 3686.20 27
2013-09-02 Perforation 3652.00 3652.10 23
2013-09-02 Fracture 3652.00 3822.60 0
2013-09-02 Perforation 3618.00 3618.60 22
2013-08-28 Perforation 4876.00 4876.10 23
2013-09-02 Perforation 3584.00 3584.50 22
2013-09-02 Perforation 3548.00 3548.40 23
2013-09-02 Perforation 3516.00 3516.30 24
2013-09-02 Perforation 3483.00 3483.20 27
2013-09-02 Perforation 3448.00 3448.10 23
2013-09-02 Fracture 3448.00 3618.60 0
2013-09-02 Perforation 3414.00 3414.60 22
2013-09-02 Perforation 3380.00 3380.50 22
2013-09-02 Perforation 3346.00 3346.40 23
2013-09-02 Perforation 3312.00 3312.30 24
2013-08-30 Fracture 4876.00 5012.50 0
2013-09-02 Perforation 3278.00 3278.20 27
2013-09-02 Perforation 3244.00 3244.10 23
2013-09-03 Fracture 3244.00 3414.60 0
2013-09-03 Perforation 3208.00 3208.60 22
2013-09-03 Perforation 3174.00 3174.50 22
2013-09-03 Perforation 3139.00 3139.40 23
2013-09-03 Perforation 3104.00 3104.30 24
2013-09-03 Perforation 3069.00 3069.20 27
2013-09-03 Perforation 3033.00 3033.10 23
2013-09-03 Fracture 3033.00 3208.60 0
2013-08-30 Perforation 4842.00 4842.60 22
2013-08-30 Perforation 4808.00 4808.50 22
2013-08-30 Perforation 4775.00 4775.40 23

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2013-08-30 2013-09-03 2,865 14,817 N/A
2 2013-09-01 2013-09-03 2,865 0 N/A
3 2013-08-30 2013-08-31 2,865 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 hydrochloric acid 7647-01-0 100 0.2682 N/A
water 7732-18-5 100 48.0959 N/A
Sand (40/70) Trican silica crystalline 14808-60-7 100 8.5 N/A
Sand (50/140) Trican silica crystalline 14808-60-7 100 1.3594 N/A
Busan 94 Trican Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.0115 N/A
dibromoacetonitrile 3252-43-5 100 0.0115 N/A
non-hazardous ingredients Not Available 100 0.0115 N/A
polyethylene glycol 25322-68-3 100 0.0115 N/A
sodium bromide 7647-15-6 100 0.0115 N/A
Breaker SR Trican Breaker potassium persulfate 7727-21-1 100 0.001 N/A
silica crystalline 14808-60-7 100 0.001 N/A
CC-55 Trican Clay Control 1.3-propanediaminium-2-substitued. -hexaalkyl-. di halide 7744 100 0.0053 N/A
formic acid 64-18-6 100 0.0053 N/A
non-hazardous ingredients Not Available 100 0.0053 N/A
AI-7NR Trican Corrosion Inhibitor modified propargyl alcohol Trade Secret 100 0.0009 N/A
propargyl alcohol 107-19-7 100 0.001 N/A
WXB-10 Trican Crosslinker borate salts 1319-33-1 100 0.023 N/A
distillates (petroleum). hydrotreated light 64742-47-8 100 0.023 N/A
DF-1 Trican Defoamer non-hazardous ingredients Not Available 100 0 N/A
GNE-1 Trican Demulsifier non-hazardous ingredients Not Available 100 0.0487 N/A
propylene glycol 57-55-6 100 0.0487 N/A
FR-8 Trican Friction Reducer ammonium chloride 12125-02-9 100 0.0863 N/A
distillates (petroleum). hydrotreated light 64742-47-8 100 0.0863 N/A
non-hazardous ingredients Not Available 100 0.0863 N/A
WG-111L Rapid Gellant Trican Gelling Agent distillates (petroleum). hydrotreated middle 64742-46-7 100 0.0196 N/A
polysaccharide blend Not Available 100 0.0196 N/A
IC-2 Trican Iron Control sodium erythorbate 6381-77-7 100 0.0014 N/A
10355GSI-1 Trican Scale Inhibitor non-hazardous ingredients Not Available 100 0.0471 N/A
ASA-60 Trican Surfactant alkylbenzenesulfonic acid 68584-22-5 100 0.0027 N/A
dipropylene glycol 25265-71-8 100 0.0027 N/A
sodium hexyldiphenyl ether sulfonate 147732-60-3 100 0.0027 N/A
sulfuric acid 7664-93-9 100 0.0027 N/A
2 Prime Plus (30/50) Trican hexamethylenetetramine 100-97-0 100 0.9166 N/A
silica crystalline 14808-60-7 100 0.9166 N/A
3 Prime Plus (40/70) Trican hexamethylenetetramine 100-97-0 100 0.8116 N/A
silica crystalline 14808-60-7 100 0.8116 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2013-08-11 2013-09-01 Surface Water - River 4050
2013-09-01 2013-09-09 Surface Water - River 2428
2013-08-31 2013-09-09 Surface Water - Runoff 8032
2013-09-06 2013-09-06 Surface Water - River 617

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2013 864 0.0 0.0 0.0
2014 4290 0.0 0.0 0.0
2015 7489 0.0 0.0 0.0
2016 7562 0.0 0.0 0.0
2017 7444 0.0 0.0 0.0
2018 8467 0.0 0.0 0.0
2019 7581 0.0 0.0 0.0
2020 1966 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2013-06-29 No Incident Encountered 0.00 0.00
2013-10-02 No Incident Encountered 0.00 0.00

For data sources see[10]

References