X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0635181011002

Well Details

Well ID: 0635181011002
Loading map...
Location: 00/11-10-063-18W5/2
Location Alias: 00/11-10-63-18 W5M
Location Alias 2: 00/11-10-063-18 W5/02
Country: Canada
Province: Alberta
Township: 063
Meridian: 5
Range: 18
Section: 10
County/Municipality: Municipal District of Greenview No. 16
Well Name: TRILOGY KAYBOB 11-10-63-18
Operator Name: Paramount Resources Ltd.
License Number: 0087323
License Date: 1980-11-28
License Status: Abandoned
Spud Date: 1981-01-31
Final Drill Date: 1981-02-09
Well Total Depth: 1825.00 m
Surface Hole Latitude: 54.439161
Surface Hole Longitude: -116.640773

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1980-11-28 Obtained License
1981-01-31 Lost Circulation Occurred
1981-02-09 Finished Drilling
1981-02-12 Drill Stem Test Performed
1981-02-14 Drill Stem Test Performed
1981-02-16 Drill Stem Test Performed
1981-02-18 Production Casing Operation Performed
1981-03-07 Perforation Treatment Performed - Jet Perforation
1981-03-15 Perforation Treatment Performed - Jet Perforation
1981-03-18 Perforation Treatment Performed - Jet Perforation
1981-03-20 Perforation Treatment Performed - Fractured
1981-03-24 Perforation Treatment Performed - Cement Squeeze
1981-03-27 Perforation Treatment Performed - Cement Squeeze
1981-12-18 Perforation Treatment Performed - Fractured
1988-03-05 Perforation Treatment Performed - Jet Perforation
1988-03-05 Well Mode changed to Drilled and Cased
1988-03-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-03-09 Perforation Treatment Performed - Fractured
1988-05-21 Well Log Performed
1988-12-15 Well Began Production
1988-12-15 Well Fluid changed to Gas
1988-12-15 Well Mode changed to Flowing
1993-06-29 Perforation Treatment Performed - Jet Perforation
1993-07-13 Perforation Treatment Performed - Fractured
2019-02-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-02-13 Perforation Treatment Performed - Packing Dev CPD W/Res-GYP Cem
2019-02-13 Plug Back Performed
2019-02-13 Well Log Performed
2019-02-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-02-14 Perforation Treatment Performed - Jet Perforation
2019-02-14 Plug Back Performed
2019-02-14 Well Fluid changed to Gas
2019-02-14 Well Log Performed
2019-02-14 Well Mode changed to Abandoned Zone
2019-02-15 Perforation Treatment Performed - Cement Plug
2019-02-15 Perforation Treatment Performed - Cement Squeeze
2019-02-15 Plug Back Performed
2019-02-16 Perforation Treatment Performed - Cement Plug
2019-02-16 Perforation Treatment Performed - Cement Squeeze
2019-02-16 Perforation Treatment Performed - Jet Perforation
2019-02-16 Plug Back Performed
2019-02-16 Well Log Performed
2019-03-21 Well Abandoned
2019-03-21 Well Fluid changed to Gas
2019-03-21 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1981-03-07 Perforation 1795.00 1800.00 13
1988-03-09 Fracture 1529.00 1531.00 0
1993-06-29 Perforation 1545.00 1548.50 14
1993-07-13 Fracture 1545.00 1548.50 0
2019-02-13 Packing Device Capped w/Cement 1774.00 1782.00 0
2019-02-13 Packing Dev Cpd w/Res-Gyp Cem 1537.00 1540.00 0
2019-02-14 Packing Device Capped w/Cement 1510.00 1518.00 0
2019-02-14 Perforation 603.00 604.00 20
2019-02-15 Cement Squeeze 603.00 604.00 0
2019-02-15 Cement Plug 585.00 593.00 0
2019-02-16 Perforation 248.00 249.00 20
1981-03-15 Perforation 1545.00 1548.50 6
2019-02-16 Cement Squeeze 248.00 249.00 0
2019-02-16 Cement Plug 233.00 241.00 0
1981-03-18 Perforation 1529.00 1530.50 13
1981-03-20 Fracture 1529.00 1530.50 0
1981-03-24 Cement Squeeze 1529.00 1530.50 0
1981-03-27 Cement Squeeze 1545.00 1548.50 0
1981-12-18 Fracture 1795.00 1800.00 0
1988-03-05 Perforation 1529.00 1531.00 13
1988-03-06 Acid Treatment 1529.00 1531.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1988 141 0.0 0.0 0.0
1989 4855 0.0 0.0 0.0
1990 3966 0.0 0.0 0.0
1991 6120 0.0 0.0 0.0
1992 7871 0.0 0.0 0.0
1993 7356 0.0 0.0 0.0
1994 8656 0.0 0.0 0.0
1995 8627 0.0 0.0 0.0
1996 8490 0.0 0.0 0.0
1997 8540 0.0 0.0 0.0
1998 8656 0.0 0.0 0.0
1999 8682 0.0 0.0 0.0
2000 8582 0.0 0.0 0.0
2001 8660 0.0 0.0 0.0
2002 8640 0.0 0.0 0.0
2003 8124 0.0 0.0 0.0
2004 8349 0.0 0.0 0.0
2005 8091 0.0 0.0 0.0
2006 8353 0.0 0.0 0.0
2007 8625 0.0 0.0 0.0
2008 8205 0.0 0.0 0.0
2009 8032 0.0 0.0 0.0
2010 8512 0.0 0.0 0.0
2011 8530 0.0 0.0 0.0
2012 8373 0.0 0.0 0.0
2013 8063 0.0 0.0 0.0
2014 6723 0.0 0.0 0.0
2015 5577 0.0 0.0 0.0
2016 5785 0.0 0.0 0.0
2017 6168 0.0 0.0 0.0
2018 7851 0.0 0.0 0.0
2019 936 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1981-01-31 Lost Circulation 213.00 220.00
2019-02-17 No Incident Encountered 0.00 0.00

For data sources see[6]

References