X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0635181011000

Well Details

Well ID: 0635181011000
Loading map...
Location: 00/11-10-063-18W5/0
Location Alias: 00/11-10-63-18 W5M
Location Alias 2: 00/11-10-063-18 W5/00
Country: Canada
Province: Alberta
Township: 063
Meridian: 5
Range: 18
Section: 10
County/Municipality: Municipal District of Greenview No. 16
Well Name: TRILOGY KAYBOB 11-10-63-18
Operator Name: Paramount Resources Ltd.
License Number: 0087323
License Date: 1980-11-28
License Status: Abandoned
Spud Date: 1981-01-31
Final Drill Date: 1981-02-09
Well Total Depth: 1825.00 m
Surface Hole Latitude: 54.439161
Surface Hole Longitude: -116.640773

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1980-11-28 Obtained License
1981-01-31 Lost Circulation Occurred
1981-02-09 Finished Drilling
1981-02-12 Drill Stem Test Performed
1981-02-14 Drill Stem Test Performed
1981-02-16 Drill Stem Test Performed
1981-02-18 Production Casing Operation Performed
1981-03-07 Perforation Treatment Performed - Jet Perforation
1981-03-15 Perforation Treatment Performed - Jet Perforation
1981-03-18 Perforation Treatment Performed - Jet Perforation
1981-03-20 Perforation Treatment Performed - Fractured
1981-03-24 Perforation Treatment Performed - Cement Squeeze
1981-03-27 Perforation Treatment Performed - Cement Squeeze
1981-12-18 Perforation Treatment Performed - Fractured
1982-01-15 Well Mode changed to Drilled and Cased
1988-03-05 Perforation Treatment Performed - Jet Perforation
1988-03-05 Well Mode changed to Drilled and Cased
1988-03-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-03-09 Perforation Treatment Performed - Fractured
1988-05-21 Well Log Performed
1988-12-15 Well Began Production
1988-12-15 Well Fluid changed to Gas
1988-12-15 Well Mode changed to Flowing
1993-06-29 Perforation Treatment Performed - Jet Perforation
1993-07-13 Perforation Treatment Performed - Fractured
2019-02-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-02-13 Perforation Treatment Performed - Packing Dev CPD W/Res-GYP Cem
2019-02-13 Plug Back Performed
2019-02-13 Well Fluid changed to Gas
2019-02-13 Well Log Performed
2019-02-13 Well Mode changed to Abandoned Zone
2019-02-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-02-14 Perforation Treatment Performed - Jet Perforation
2019-02-14 Plug Back Performed
2019-02-14 Well Log Performed
2019-02-15 Perforation Treatment Performed - Cement Plug
2019-02-15 Perforation Treatment Performed - Cement Squeeze
2019-02-15 Plug Back Performed
2019-02-16 Perforation Treatment Performed - Cement Plug
2019-02-16 Perforation Treatment Performed - Cement Squeeze
2019-02-16 Perforation Treatment Performed - Jet Perforation
2019-02-16 Plug Back Performed
2019-02-16 Well Log Performed
2019-03-21 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1981-03-07 Perforation 1795.00 1800.00 13
1988-03-09 Fracture 1529.00 1531.00 0
1993-06-29 Perforation 1545.00 1548.50 14
1993-07-13 Fracture 1545.00 1548.50 0
2019-02-13 Packing Device Capped w/Cement 1774.00 1782.00 0
2019-02-13 Packing Dev Cpd w/Res-Gyp Cem 1537.00 1540.00 0
2019-02-14 Packing Device Capped w/Cement 1510.00 1518.00 0
2019-02-14 Perforation 603.00 604.00 20
2019-02-15 Cement Squeeze 603.00 604.00 0
2019-02-15 Cement Plug 585.00 593.00 0
2019-02-16 Perforation 248.00 249.00 20
1981-03-15 Perforation 1545.00 1548.50 6
2019-02-16 Cement Squeeze 248.00 249.00 0
2019-02-16 Cement Plug 233.00 241.00 0
1981-03-18 Perforation 1529.00 1530.50 13
1981-03-20 Fracture 1529.00 1530.50 0
1981-03-24 Cement Squeeze 1529.00 1530.50 0
1981-03-27 Cement Squeeze 1545.00 1548.50 0
1981-12-18 Fracture 1795.00 1800.00 0
1988-03-05 Perforation 1529.00 1531.00 13
1988-03-06 Acid Treatment 1529.00 1531.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1981 72 0.0 0.0 0.0
1982 168 0.0 0.0 0.0
1988 126 0.0 0.0 0.0
1989 3231 0.0 0.0 0.0
1990 4379 0.0 0.0 0.0
1991 5587 0.0 0.0 0.0
1992 8074 0.0 0.0 0.0
1993 7317 0.0 0.0 0.0
1994 8664 0.0 0.0 0.0
1995 8544 0.0 0.0 0.0
1996 8496 0.0 0.0 0.0
1997 8212 0.0 0.0 0.0
1998 8648 0.0 0.0 0.0
1999 8616 0.0 0.0 0.0
2000 8552 0.0 0.0 0.0
2001 8692 0.0 0.0 0.0
2002 4689 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1981-01-31 Lost Circulation 213.00 220.00
2019-02-17 No Incident Encountered 0.00 0.00

For data sources see[6]

References