X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0635180215002

Well Details

Well ID: 0635180215002
Loading map...
Location: 00/15-02-063-18W5/2
Location Alias: 00/15-02-63-18 W5M
Location Alias 2: 00/15-02-063-18 W5/02
Country: Canada
Province: Alberta
Township: 063
Meridian: 5
Range: 18
Section: 02
County/Municipality: Municipal District of Greenview No. 16
Well Name: TRILOGY KAYBOB 15-2-63-18
Operator Name: Paramount Resources Ltd.
License Number: 0230361
License Date: 1999-12-13
License Status: Issued
Spud Date: 1999-12-29
Final Drill Date: 2000-01-08
Well Total Depth: 1886.70 m
Surface Hole Latitude: 54.426843
Surface Hole Longitude: -116.614190

For data sources see[1][2]

Well History

Date Event
1999-12-13 Obtained License
1999-12-31 Surface Casing Operation Performed
2000-01-01 Direction Drilling Operation Performed - Deviate
2000-01-05 Well Log Performed
2000-01-08 Finished Drilling
2000-01-08 Well Log Performed
2000-01-08 Well Mode changed to Drilled and Cased
2000-01-09 Well Log Performed
2000-01-10 Production Casing Operation Performed
2000-01-11 Rig Released
2000-01-20 Perforation Treatment Performed - Jet Perforation
2000-01-20 Well Log Performed
2000-01-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-01-22 Perforation Treatment Performed - Jet Perforation
2000-01-22 Well Log Performed
2000-01-23 Perforation Treatment Performed - Fractured
2000-03-24 Well Began Production
2000-03-24 Well Fluid changed to Gas
2000-03-24 Well Mode changed to Flowing
2002-09-01 Well Fluid changed to Gas
2002-09-01 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2000-01-01 360.20 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2000-01-20 Perforation 1863.00 1864.00 17
2000-01-21 Packing Device Capped w/Cement 1847.00 1855.00 0
2000-01-22 Perforation 1594.50 1596.50 17
2000-01-23 Fracture 1594.50 1596.50 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2000 5997 0.0 0.0 0.0
2001 8114 0.0 0.0 0.0
2002 5397 0.0 0.0 0.0
2003 8394 0.0 0.0 0.0
2004 8783 0.0 0.0 0.0
2005 8759 0.0 0.0 0.0
2006 8231 0.0 0.0 0.0
2007 8723 0.0 0.0 0.0
2008 8763 0.0 0.0 0.0
2009 8686 0.0 0.0 0.0
2010 8759 0.0 0.0 0.0
2011 8659 0.0 0.0 0.0
2012 8468 0.0 0.0 0.0
2013 8533 0.0 0.0 0.0
2014 7535 0.0 0.0 0.0
2015 7728 0.0 0.0 0.0
2016 8327 0.0 0.0 0.0
2017 7550 0.0 0.0 0.0
2018 8279 0.0 0.0 0.0
2019 8112 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[6]

References