If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0635151904000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.476416,"lon":-116.306704,"icon":""}]} |
Location: 00/04-19-063-15W5/0 | |
Location Alias: 00/04-19-63-15 W5M | |
Location Alias 2: 00/04-19-063-15 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 063 | |
Meridian: 5 | |
Range: 15 | |
Section: 19 | |
County/Municipality: Municipal District of Greenview No. 16 | |
Well Name: CHEVRON HZ TWOCK 4-19-63-15 | |
Operator Name: Chevron Canada Limited | |
License Number: 0490491 | |
License Date: 2018-08-16 | |
License Status: Issued | |
Spud Date: 2018-12-21 | |
Final Drill Date: 2019-01-06 | |
Well Total Depth: 6828.00 m | |
Surface Hole Latitude: 54.476416 | |
Surface Hole Longitude: -116.306704 |
Date | Event |
---|---|
2018-08-16 | Obtained License |
2018-12-21 | Surface Casing Operation Performed |
2018-12-28 | Direction Drilling Operation Performed - Deviate |
2019-01-01 | Intermediate Casing Operation Performed |
2019-01-03 | Direction Drilling Operation Performed - Horizontal |
2019-01-06 | Finished Drilling |
2019-01-06 | Well Log Performed |
2019-01-06 | Well Mode changed to Drilled and Cased |
2019-01-07 | Well Log Performed |
2019-01-09 | Production Casing Operation Performed |
2019-01-09 | Rig Released |
2019-02-13 | Perforation Treatment Performed - Jet Perforation |
2019-02-13 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-02-14 | Perforation Treatment Performed - Jet Perforation |
2019-02-14 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-02-15 | Perforation Treatment Performed - Jet Perforation |
2019-02-16 | Perforation Treatment Performed - Jet Perforation |
2019-02-16 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-02-17 | Perforation Treatment Performed - Jet Perforation |
2019-02-17 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-02-18 | Perforation Treatment Performed - Jet Perforation |
2019-02-18 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-02-19 | Perforation Treatment Performed - Jet Perforation |
2019-02-19 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-02-20 | Perforation Treatment Performed - Jet Perforation |
2019-02-20 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-02-21 | Perforation Treatment Performed - Jet Perforation |
2019-02-21 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-02-22 | Perforation Treatment Performed - Jet Perforation |
2019-02-22 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-02-23 | Perforation Treatment Performed - Jet Perforation |
2019-02-23 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-02-24 | Perforation Treatment Performed - Jet Perforation |
2019-02-24 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-02-25 | Perforation Treatment Performed - Jet Perforation |
2019-02-25 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-02-26 | Perforation Treatment Performed - Jet Perforation |
2019-02-26 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-02-27 | Perforation Treatment Performed - Jet Perforation |
2019-02-27 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-02-28 | Perforation Treatment Performed - Jet Perforation |
2019-02-28 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-03-07 | Well Log Performed |
2019-04-27 | Well Began Production |
2019-04-27 | Well Fluid changed to Shale Gas Only |
2019-04-27 | Well Mode changed to Flowing |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2018-12-21 | Ensign Drilling Inc. | 144 | N/A | Set Surface |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2018-12-28 | 522.70 | Deviate (5 - 79 degrees) |
2019-01-03 | 3137.90 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2019-02-13 | Perforation | 6744.10 | 6744.60 | 20 |
2019-02-14 | Perforation | 6624.00 | 6624.50 | 10 |
2019-02-20 | Perforation | 5469.00 | 5469.50 | 20 |
2019-02-20 | Perforation | 5454.00 | 5454.50 | 10 |
2019-02-20 | Perforation | 5439.00 | 5439.50 | 10 |
2019-02-20 | Perforation | 5424.00 | 5424.50 | 10 |
2019-02-20 | Multi-Stage Fracture | 5424.00 | 5499.00 | 0 |
2019-02-20 | Perforation | 5409.00 | 5409.50 | 20 |
2019-02-20 | Perforation | 5394.00 | 5394.50 | 20 |
2019-02-20 | Perforation | 5379.00 | 5379.50 | 20 |
2019-02-20 | Perforation | 5364.00 | 5364.50 | 10 |
2019-02-20 | Perforation | 5349.00 | 5349.50 | 10 |
2019-02-14 | Perforation | 6609.00 | 6609.50 | 10 |
2019-02-20 | Perforation | 5334.00 | 5334.50 | 10 |
2019-02-21 | Multi-Stage Fracture | 5333.50 | 5409.00 | 0 |
2019-02-21 | Perforation | 5319.00 | 5319.50 | 20 |
2019-02-21 | Perforation | 5304.00 | 5304.50 | 20 |
2019-02-21 | Perforation | 5289.00 | 5289.50 | 20 |
2019-02-21 | Perforation | 5274.00 | 5274.50 | 10 |
2019-02-21 | Perforation | 5259.00 | 5259.50 | 10 |
2019-02-21 | Perforation | 5244.00 | 5244.50 | 10 |
2019-02-21 | Multi-Stage Fracture | 5243.50 | 5319.00 | 0 |
2019-02-22 | Perforation | 5229.00 | 5229.50 | 20 |
2019-02-14 | Perforation | 6594.00 | 6594.50 | 10 |
2019-02-22 | Perforation | 5214.00 | 5214.50 | 20 |
2019-02-22 | Perforation | 5199.00 | 5199.50 | 20 |
2019-02-22 | Perforation | 5184.00 | 5184.50 | 10 |
2019-02-22 | Perforation | 5169.00 | 5169.50 | 10 |
2019-02-22 | Perforation | 5154.00 | 5154.50 | 10 |
2019-02-22 | Multi-Stage Fracture | 5153.50 | 5229.00 | 0 |
2019-02-22 | Perforation | 5139.00 | 5139.50 | 20 |
2019-02-22 | Perforation | 5124.00 | 5124.50 | 20 |
2019-02-22 | Perforation | 5109.00 | 5109.50 | 20 |
2019-02-22 | Perforation | 5094.00 | 5094.50 | 20 |
2019-02-14 | Multi-Stage Fracture | 6594.00 | 6670.50 | 0 |
2019-02-22 | Perforation | 5079.00 | 5079.50 | 20 |
2019-02-22 | Perforation | 5079.00 | 5079.50 | 10 |
2019-02-22 | Perforation | 5064.00 | 5064.50 | 10 |
2019-02-22 | Perforation | 5064.00 | 5064.50 | 20 |
2019-02-22 | Multi-Stage Fracture | 5063.50 | 5139.00 | 0 |
2019-02-22 | Perforation | 5049.00 | 5049.50 | 20 |
2019-02-22 | Perforation | 5034.00 | 5034.50 | 20 |
2019-02-22 | Perforation | 5019.00 | 5019.50 | 20 |
2019-02-22 | Perforation | 5004.00 | 5004.50 | 20 |
2019-02-22 | Perforation | 4989.00 | 4989.50 | 10 |
2019-02-14 | Perforation | 6579.00 | 6579.50 | 20 |
2019-02-22 | Perforation | 4974.00 | 4974.50 | 10 |
2019-02-22 | Multi-Stage Fracture | 4973.50 | 5049.00 | 0 |
2019-02-22 | Perforation | 4959.00 | 4959.50 | 20 |
2019-02-22 | Perforation | 4944.00 | 4944.50 | 20 |
2019-02-22 | Perforation | 4929.00 | 4929.50 | 20 |
2019-02-22 | Perforation | 4914.00 | 4914.50 | 20 |
2019-02-22 | Perforation | 4899.00 | 4899.50 | 10 |
2019-02-22 | Perforation | 4884.00 | 4884.50 | 10 |
2019-02-23 | Multi-Stage Fracture | 4883.50 | 4959.00 | 0 |
2019-02-23 | Perforation | 4869.00 | 4869.50 | 20 |
2019-02-14 | Perforation | 6564.00 | 6564.50 | 20 |
2019-02-23 | Perforation | 4854.00 | 4854.50 | 20 |
2019-02-23 | Perforation | 4839.00 | 4839.50 | 20 |
2019-02-23 | Perforation | 4824.00 | 4824.50 | 20 |
2019-02-23 | Perforation | 4809.00 | 4809.50 | 10 |
2019-02-23 | Perforation | 4794.00 | 4794.50 | 10 |
2019-02-23 | Multi-Stage Fracture | 4793.50 | 4869.00 | 0 |
2019-02-23 | Perforation | 4778.50 | 4779.00 | 20 |
2019-02-23 | Perforation | 4764.00 | 4764.50 | 20 |
2019-02-23 | Perforation | 4749.00 | 4749.50 | 20 |
2019-02-23 | Perforation | 4734.00 | 4734.50 | 20 |
2019-02-14 | Perforation | 6549.00 | 6549.50 | 20 |
2019-02-23 | Perforation | 4719.00 | 4719.50 | 10 |
2019-02-23 | Perforation | 4704.00 | 4704.50 | 10 |
2019-02-23 | Multi-Stage Fracture | 4703.50 | 4779.00 | 0 |
2019-02-23 | Perforation | 4689.00 | 4689.50 | 20 |
2019-02-23 | Perforation | 4674.00 | 4674.50 | 20 |
2019-02-23 | Perforation | 4659.00 | 4659.50 | 20 |
2019-02-23 | Perforation | 4644.00 | 4644.50 | 20 |
2019-02-23 | Perforation | 4629.00 | 4629.50 | 10 |
2019-02-23 | Perforation | 4614.00 | 4614.50 | 10 |
2019-02-24 | Multi-Stage Fracture | 4613.50 | 4689.00 | 0 |
2019-02-14 | Perforation | 6534.00 | 6534.50 | 10 |
2019-02-24 | Perforation | 4599.00 | 4599.50 | 20 |
2019-02-24 | Perforation | 4584.00 | 4584.50 | 20 |
2019-02-24 | Perforation | 4569.00 | 4569.50 | 20 |
2019-02-24 | Perforation | 4554.00 | 4554.50 | 20 |
2019-02-24 | Perforation | 4539.00 | 4539.50 | 10 |
2019-02-24 | Perforation | 4524.00 | 4524.50 | 10 |
2019-02-24 | Multi-Stage Fracture | 4523.50 | 4599.00 | 0 |
2019-02-24 | Perforation | 4509.00 | 4509.50 | 20 |
2019-02-24 | Perforation | 4494.00 | 4494.50 | 20 |
2019-02-24 | Perforation | 4479.00 | 4479.50 | 20 |
2019-02-14 | Perforation | 6519.00 | 6519.50 | 10 |
2019-02-24 | Perforation | 4464.00 | 4464.50 | 20 |
2019-02-24 | Perforation | 4449.00 | 4449.50 | 10 |
2019-02-24 | Perforation | 4434.00 | 4434.50 | 10 |
2019-02-24 | Multi-Stage Fracture | 4433.50 | 4509.00 | 0 |
2019-02-24 | Perforation | 4419.00 | 4419.50 | 20 |
2019-02-24 | Perforation | 4404.00 | 4404.50 | 20 |
2019-02-24 | Perforation | 4389.00 | 4389.50 | 20 |
2019-02-24 | Perforation | 4374.00 | 4374.50 | 20 |
2019-02-24 | Perforation | 4359.00 | 4359.50 | 10 |
2019-02-24 | Perforation | 4344.00 | 4344.50 | 10 |
2019-02-14 | Perforation | 6504.00 | 6504.50 | 10 |
2019-02-25 | Multi-Stage Fracture | 4343.50 | 4419.00 | 0 |
2019-02-25 | Perforation | 4329.00 | 4329.50 | 20 |
2019-02-25 | Perforation | 4314.00 | 4314.50 | 20 |
2019-02-25 | Perforation | 4299.00 | 4299.50 | 20 |
2019-02-25 | Perforation | 4284.00 | 4284.50 | 20 |
2019-02-25 | Perforation | 4269.00 | 4269.50 | 10 |
2019-02-25 | Perforation | 4254.00 | 4254.50 | 10 |
2019-02-25 | Multi-Stage Fracture | 4253.50 | 4329.00 | 0 |
2019-02-25 | Perforation | 4239.00 | 4239.50 | 20 |
2019-02-25 | Perforation | 4224.00 | 4224.50 | 20 |
2019-02-13 | Perforation | 6729.20 | 6729.70 | 20 |
2019-02-14 | Multi-Stage Fracture | 6503.50 | 6586.50 | 0 |
2019-02-25 | Perforation | 4209.00 | 4209.50 | 20 |
2019-02-25 | Perforation | 4194.00 | 4194.50 | 20 |
2019-02-25 | Perforation | 4179.00 | 4179.50 | 10 |
2019-02-25 | Perforation | 4164.00 | 4164.50 | 10 |
2019-02-25 | Multi-Stage Fracture | 4163.50 | 4239.00 | 0 |
2019-02-25 | Perforation | 4149.00 | 4149.50 | 20 |
2019-02-25 | Perforation | 4134.00 | 4134.50 | 20 |
2019-02-26 | Perforation | 4119.00 | 4119.50 | 20 |
2019-02-26 | Perforation | 4104.00 | 4104.50 | 20 |
2019-02-26 | Perforation | 4089.00 | 4089.50 | 10 |
2019-02-15 | Perforation | 6489.00 | 6489.50 | 20 |
2019-02-26 | Perforation | 4074.00 | 4074.50 | 10 |
2019-02-26 | Multi-Stage Fracture | 4074.00 | 4156.50 | 0 |
2019-02-26 | Perforation | 4059.00 | 4059.50 | 20 |
2019-02-26 | Perforation | 4044.00 | 4044.50 | 20 |
2019-02-26 | Perforation | 4029.00 | 4029.50 | 20 |
2019-02-26 | Perforation | 4014.00 | 4014.50 | 20 |
2019-02-26 | Perforation | 3999.00 | 3999.50 | 10 |
2019-02-26 | Perforation | 3984.00 | 3984.50 | 10 |
2019-02-26 | Multi-Stage Fracture | 3983.50 | 4059.00 | 0 |
2019-02-26 | Perforation | 3969.00 | 3969.50 | 20 |
2019-02-15 | Perforation | 6474.00 | 6474.50 | 20 |
2019-02-26 | Perforation | 3954.00 | 3954.50 | 20 |
2019-02-26 | Perforation | 3939.00 | 3939.50 | 20 |
2019-02-26 | Perforation | 3924.00 | 3924.50 | 20 |
2019-02-26 | Perforation | 3909.00 | 3909.50 | 10 |
2019-02-26 | Perforation | 3894.00 | 3894.50 | 10 |
2019-02-26 | Multi-Stage Fracture | 3893.50 | 3969.00 | 0 |
2019-02-27 | Perforation | 3879.00 | 3879.50 | 20 |
2019-02-27 | Perforation | 3864.00 | 3864.50 | 20 |
2019-02-27 | Perforation | 3849.00 | 3849.50 | 20 |
2019-02-27 | Perforation | 3834.00 | 3834.50 | 20 |
2019-02-15 | Perforation | 6459.00 | 6459.50 | 20 |
2019-02-27 | Perforation | 3819.00 | 3819.50 | 10 |
2019-02-27 | Perforation | 3804.00 | 3804.50 | 10 |
2019-02-27 | Multi-Stage Fracture | 3803.50 | 3879.00 | 0 |
2019-02-27 | Perforation | 3789.00 | 3789.50 | 20 |
2019-02-27 | Perforation | 3774.00 | 3774.50 | 20 |
2019-02-27 | Perforation | 3759.00 | 3759.50 | 20 |
2019-02-27 | Perforation | 3744.00 | 3744.50 | 20 |
2019-02-27 | Perforation | 3729.00 | 3729.50 | 10 |
2019-02-27 | Perforation | 3714.00 | 3714.50 | 10 |
2019-02-27 | Multi-Stage Fracture | 3713.50 | 3789.00 | 0 |
2019-02-15 | Perforation | 6444.00 | 6444.50 | 10 |
2019-02-27 | Perforation | 3699.00 | 3699.50 | 20 |
2019-02-27 | Perforation | 3684.00 | 3684.50 | 20 |
2019-02-27 | Perforation | 3669.00 | 3669.50 | 20 |
2019-02-27 | Perforation | 3654.00 | 3654.50 | 20 |
2019-02-27 | Perforation | 3639.00 | 3639.50 | 10 |
2019-02-27 | Perforation | 3624.00 | 3624.50 | 10 |
2019-02-27 | Multi-Stage Fracture | 3623.50 | 3699.00 | 0 |
2019-02-27 | Perforation | 3609.00 | 3609.50 | 20 |
2019-02-27 | Perforation | 3594.00 | 3594.50 | 20 |
2019-02-27 | Perforation | 3579.00 | 3579.50 | 20 |
2019-02-15 | Perforation | 6429.00 | 6429.50 | 10 |
2019-02-27 | Perforation | 3564.00 | 3564.50 | 20 |
2019-02-27 | Perforation | 3549.00 | 3549.50 | 10 |
2019-02-27 | Perforation | 3534.00 | 3534.50 | 10 |
2019-02-27 | Multi-Stage Fracture | 3533.50 | 3609.00 | 0 |
2019-02-28 | Perforation | 3519.00 | 3519.50 | 20 |
2019-02-28 | Perforation | 3504.00 | 3504.50 | 20 |
2019-02-28 | Perforation | 3489.00 | 3489.50 | 20 |
2019-02-28 | Perforation | 3474.00 | 3474.50 | 20 |
2019-02-28 | Perforation | 3459.00 | 3459.50 | 10 |
2019-02-28 | Perforation | 3444.00 | 3444.50 | 10 |
2019-02-15 | Perforation | 6414.00 | 6414.50 | 10 |
2019-02-28 | Multi-Stage Fracture | 3443.50 | 3519.00 | 0 |
2019-02-28 | Perforation | 3429.00 | 3429.50 | 20 |
2019-02-28 | Perforation | 3414.00 | 3414.50 | 20 |
2019-02-28 | Perforation | 3399.00 | 3399.50 | 20 |
2019-02-28 | Perforation | 3384.00 | 3384.50 | 20 |
2019-02-28 | Perforation | 3369.00 | 3369.50 | 10 |
2019-02-28 | Perforation | 3354.00 | 3354.50 | 10 |
2019-02-28 | Multi-Stage Fracture | 3353.50 | 3429.00 | 0 |
2019-02-16 | Multi-Stage Fracture | 6413.50 | 6489.50 | 0 |
2019-02-16 | Perforation | 6399.00 | 6399.50 | 20 |
2019-02-16 | Perforation | 6384.00 | 6384.50 | 20 |
2019-02-13 | Perforation | 6714.30 | 6714.80 | 20 |
2019-02-16 | Perforation | 6369.00 | 6369.50 | 20 |
2019-02-16 | Perforation | 6354.00 | 6354.50 | 10 |
2019-02-16 | Perforation | 6339.00 | 6339.50 | 10 |
2019-02-16 | Perforation | 6324.00 | 6324.50 | 10 |
2019-02-16 | Multi-Stage Fracture | 6323.50 | 6399.50 | 0 |
2019-02-16 | Perforation | 6309.00 | 6309.50 | 20 |
2019-02-16 | Perforation | 6294.00 | 6294.50 | 20 |
2019-02-16 | Perforation | 6279.00 | 6279.50 | 20 |
2019-02-16 | Perforation | 6264.00 | 6264.50 | 10 |
2019-02-16 | Perforation | 6249.00 | 6249.50 | 10 |
2019-02-13 | Perforation | 6699.40 | 6699.90 | 20 |
2019-02-16 | Perforation | 6234.00 | 6234.50 | 10 |
2019-02-16 | Multi-Stage Fracture | 6233.50 | 6309.50 | 0 |
2019-02-17 | Perforation | 6219.00 | 6219.50 | 20 |
2019-02-17 | Perforation | 6204.00 | 6204.50 | 20 |
2019-02-17 | Perforation | 6189.00 | 6189.50 | 20 |
2019-02-17 | Perforation | 6174.00 | 6174.50 | 10 |
2019-02-17 | Perforation | 6159.00 | 6159.50 | 10 |
2019-02-17 | Perforation | 6144.00 | 6144.50 | 10 |
2019-02-17 | Multi-Stage Fracture | 6143.50 | 6219.50 | 0 |
2019-02-17 | Perforation | 6129.00 | 6129.50 | 20 |
2019-02-13 | Perforation | 6684.50 | 6685.00 | 20 |
2019-02-17 | Perforation | 6114.00 | 6114.50 | 20 |
2019-02-17 | Perforation | 6099.00 | 6099.50 | 20 |
2019-02-17 | Perforation | 6084.00 | 6084.50 | 10 |
2019-02-17 | Perforation | 6069.00 | 6069.50 | 10 |
2019-02-17 | Perforation | 6054.00 | 6054.50 | 10 |
2019-02-17 | Multi-Stage Fracture | 6054.00 | 6129.50 | 0 |
2019-02-18 | Perforation | 6039.00 | 6039.50 | 20 |
2019-02-18 | Perforation | 6024.00 | 6024.50 | 20 |
2019-02-18 | Perforation | 6009.00 | 6009.50 | 20 |
2019-02-18 | Perforation | 5994.00 | 5994.50 | 10 |
2019-02-13 | Multi-Stage Fracture | 6684.00 | 6745.00 | 0 |
2019-02-18 | Perforation | 5979.00 | 5979.50 | 10 |
2019-02-18 | Perforation | 5964.00 | 5964.50 | 10 |
2019-02-18 | Multi-Stage Fracture | 5963.50 | 6039.50 | 0 |
2019-02-18 | Perforation | 5949.00 | 5949.50 | 20 |
2019-02-18 | Perforation | 5934.00 | 5934.50 | 20 |
2019-02-18 | Perforation | 5919.00 | 5919.50 | 20 |
2019-02-18 | Perforation | 5904.00 | 5904.50 | 10 |
2019-02-18 | Perforation | 5889.00 | 5889.50 | 10 |
2019-02-18 | Perforation | 5874.00 | 5874.50 | 10 |
2019-02-19 | Multi-Stage Fracture | 5874.00 | 5949.50 | 0 |
2019-02-14 | Perforation | 6669.00 | 6669.50 | 20 |
2019-02-19 | Perforation | 5859.00 | 5859.50 | 20 |
2019-02-19 | Perforation | 5844.00 | 5844.50 | 20 |
2019-02-19 | Perforation | 5829.00 | 5829.50 | 20 |
2019-02-19 | Perforation | 5814.00 | 5814.50 | 10 |
2019-02-19 | Perforation | 5799.00 | 5799.50 | 10 |
2019-02-19 | Perforation | 5784.00 | 5784.50 | 10 |
2019-02-19 | Multi-Stage Fracture | 5783.50 | 5859.50 | 0 |
2019-02-19 | Perforation | 5769.00 | 5769.50 | 20 |
2019-02-19 | Perforation | 5754.00 | 5754.50 | 20 |
2019-02-19 | Perforation | 5739.00 | 5739.50 | 20 |
2019-02-14 | Perforation | 6654.00 | 6654.50 | 20 |
2019-02-19 | Perforation | 5724.00 | 5724.50 | 10 |
2019-02-19 | Perforation | 5709.00 | 5709.50 | 10 |
2019-02-19 | Perforation | 5694.00 | 5694.50 | 10 |
2019-02-19 | Multi-Stage Fracture | 5693.50 | 5769.00 | 0 |
2019-02-19 | Perforation | 5679.00 | 5679.50 | 20 |
2019-02-19 | Perforation | 5664.00 | 5664.50 | 20 |
2019-02-19 | Perforation | 5649.00 | 5649.50 | 20 |
2019-02-19 | Perforation | 5634.00 | 5634.50 | 10 |
2019-02-19 | Perforation | 5619.00 | 5619.50 | 10 |
2019-02-19 | Perforation | 5604.00 | 5604.50 | 10 |
2019-02-14 | Perforation | 6639.00 | 6639.50 | 20 |
2019-02-20 | Multi-Stage Fracture | 5604.00 | 5679.00 | 0 |
2019-02-20 | Perforation | 5589.00 | 5589.50 | 20 |
2019-02-20 | Perforation | 5574.00 | 5574.50 | 20 |
2019-02-20 | Perforation | 5559.00 | 5559.50 | 20 |
2019-02-20 | Perforation | 5544.00 | 5544.50 | 10 |
2019-02-20 | Perforation | 5529.00 | 5529.50 | 10 |
2019-02-20 | Perforation | 5514.00 | 5514.50 | 10 |
2019-02-20 | Multi-Stage Fracture | 5513.50 | 5589.00 | 0 |
2019-02-20 | Perforation | 5499.00 | 5499.50 | 20 |
2019-02-20 | Perforation | 5484.00 | 5484.50 | 20 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2019-02-13 | 2019-02-28 | 2,908 | 83,311 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | 7732-18-5 | 100 | 87.0192 | N/A | |||
FRAC SAND. 40/70 WHITE | BJ Services | Crystalline Silica (Quartz) | 14808-60-7 | 100 | 10.132 | N/A | ||
FRAC SAND. 50/140 CANADIAN | BJ Services | Crystalline Silica (Quartz) | 14808-60-7 | 100 | 2.4648 | N/A | ||
Hydrochloric Acid 28% | BJ Services | Acid | Hydrochloric acid | 7647-01-0 | 100 | 0.1385 | N/A | |
Water | 7732-18-5 | 100 | 0.1385 | N/A | ||||
AQUCAR DB 20 | BJ Services | Bactericide/Biocide | 2.2-Dibromo-3-nitrilopropionamide | 10222-01-2 | 100 | 0.0085 | N/A | |
Dibromoacetonitrile | 3252-43-5 | 100 | 0.0085 | N/A | ||||
Polyethylene Glycol | 25322-68-3 | 100 | 0.0085 | N/A | ||||
Sodium Bromide | 7647-15-6 | 100 | 0.0085 | N/A | ||||
Water | 7732-18-5 | 100 | 0.0085 | N/A | ||||
GBW-41LW | BJ Services | Breaker | Hydrogen Peroxide | 7722-84-1 | 100 | 0.0325 | N/A | |
Methanol | 67-56-1 | 100 | 0.0325 | N/A | ||||
Non-hazardous | Not Available | 100 | 0.0325 | N/A | ||||
FP-12L | BJ Services | Defoamer | Methylcellulose | 9004-67-5 | 100 | 0 | N/A | |
Non-hazardous | Not Available | 100 | 0 | N/A | ||||
Octamethylcyclotetrasiloxane | 556-67-2 | 100 | 0.0001 | N/A | ||||
Polydimethylsiloxane | 63148-62-9 | 100 | 0 | N/A | ||||
Water | 7732-18-5 | 100 | 0 | N/A | ||||
D-3 | BJ Services | Demulsifier | Ethoxylated alcohol. branched | 78330-19-5 | 100 | 0.0012 | N/A | |
Isopropanol | 67-63-0 | 100 | 0.0012 | N/A | ||||
Methanol | 67-56-1 | 100 | 0.0012 | N/A | ||||
ThinFrac HV FRHV-01 | BJ Services | Friction Reducer | 1.2 Propanediol carbonate | 108-32-7 | 100 | 0.1529 | N/A | |
Distillates (petroleum) hydrotreated light paraffinic | 64742-55-8 | 100 | 0.1529 | N/A | ||||
Lecitihins. soya | 8030-76-0 | 100 | 0.1529 | N/A | ||||
polymer | Trade Secret | 100 | 0.1529 | N/A | ||||
Water | 7732-18-5 | 100 | 0.1529 | N/A | ||||
ResCare IC 800 | BJ Services | Iron Control | Trisodium nitrilotriacetate monohydrate | 18662-53-8 | 100 | 0.0024 | N/A | |
FraCare SI 14 | BJ Services | Scale Inhibitor | Phosphinocarboxylic acid copolymer | 110224-99-2 | 100 | 0.0197 | N/A | |
Water | 7732-18-5 | 100 | 0.0197 | N/A | ||||
MatrixCare CI-01 | BJ Services | Scale Inhibitor | 1.2-ethanediol | 107-21-1 | 100 | 0.0015 | N/A | |
1-decanol | 112-30-1 | 100 | 0.0015 | N/A | ||||
1-octanol | 111-87-5 | 100 | 0.0015 | N/A | ||||
2-butoxy ethanol | 111-76-2 | 100 | 0.0015 | N/A | ||||
2-propanol | 67-63-0 | 100 | 0.0015 | N/A | ||||
2-propenal. 3-phenyl- | 104-55-2 | 100 | 0.0015 | N/A | ||||
alcohols. C14-15. ethoxylated | 68951-67-7 | 100 | 0.0015 | N/A | ||||
azabenzene derivatives. quaternized. chloride salt | 15619-48-4 | 100 | 0.0015 | N/A | ||||
formamide. N.N-dimethyl- | 68-12-2 | 100 | 0.0015 | N/A | ||||
phosphoric acid. triethyl ester | 78-40-0 | 100 | 0.0015 | N/A | ||||
Water | 7732-18-5 | 100 | 0.0015 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2019-01-28 | 2019-03-01 | Surface Water - River | 82796 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2019 | 5658 | 0.0 | 0.0 | 0.0 |
2020 | 2051 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2019-01-06 | No Incident Encountered | 0.00 | 0.00 |
2019-02-28 | No Incident Encountered | 0.00 | 0.00 |
2019-03-07 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]