X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0635141813003

Well Details

Well ID: 0635141813003
Loading map...
Location: 00/13-18-063-14W5/3
Location Alias: 00/13-18-63-14 W5M
Location Alias 2: 00/13-18-063-14 W5/03
Country: Canada
Province: Alberta
Township: 063
Meridian: 5
Range: 14
Section: 18
County/Municipality: Municipal District of Greenview No. 16
Well Name: EEL SAKWA 13-18-63-14
Operator Name: Enercapita Energy Ltd.
License Number: 0266775
License Date: 2002-01-28
License Status: Suspension
Spud Date: 2002-02-06
Final Drill Date: 2002-02-17
Well Total Depth: 1870.00 m
Surface Hole Latitude: 54.452929
Surface Hole Longitude: -116.110676

For data sources see[1][2]

Well History

Date Event
2002-01-28 Obtained License
2002-02-08 Lost Circulation Occurred
2002-02-08 Surface Casing Operation Performed
2002-02-11 Direction Drilling Operation Performed - Deviate
2002-02-16 Well Log Performed
2002-02-17 Finished Drilling
2002-02-17 Well Mode changed to Drilled and Cased
2002-02-19 Production Casing Operation Performed
2002-02-20 Rig Released
2002-02-28 Perforation Treatment Performed - Jet Perforation
2004-02-03 Perforation Treatment Performed - Jet Perforation
2004-02-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-02-05 Plug Back Performed
2005-10-15 Perforation Treatment Performed - Jet Perforation
2005-12-10 Well Began Production
2005-12-10 Well Fluid changed to Gas
2005-12-10 Well Mode changed to Flowing
2006-03-07 Well Log Performed
2006-03-08 Perforation Treatment Performed - Cement Squeeze
2006-03-08 Perforation Treatment Performed - Jet Perforation
2006-03-08 Plug Back Performed
2006-03-08 Well Log Performed
2006-03-12 Perforation Treatment Performed - Cement Squeeze
2006-03-12 Plug Back Performed
2006-03-12 Well Fluid changed to Gas
2006-03-12 Well Mode changed to Abandoned Zone
2006-03-21 Perforation Treatment Performed - Jet Perforation
2006-03-25 Well Log Performed
2017-01-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2017-01-09 Plug Back Performed
2017-01-09 Well Log Performed

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2002-02-11 774.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2002-02-28 Perforation 1763.00 1765.00 17
2017-01-09 Packing Device Capped w/Cement 1482.00 1490.00 0
2004-02-03 Perforation 1500.00 1502.00 17
2004-02-05 Packing Device Capped w/Cement 1747.00 1755.00 0
2005-10-15 Perforation 1727.50 1729.50 20
2006-03-08 Cement Squeeze 1500.00 1502.00 0
2006-03-08 Perforation 1735.00 1736.00 13
2006-03-12 Cement Squeeze 1727.50 1736.00 0
2006-03-21 Perforation 1727.50 1729.50 20
2017-01-09 Packing Device Capped w/Cement 1709.00 1717.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2005 385 0.0 0.0 0.0
2006 105 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2002-02-08 Lost Circulation 50.00 50.00
2002-02-08 Lost Circulation 115.00 115.00
2017-01-10 No Incident Encountered 0.00 0.00

For data sources see[7]

References