X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0635133202002

Well Details

Well ID: 0635133202002
Loading map...
Location: 00/02-32-063-13W5/2
Location Alias: 00/02-32-63-13 W5M
Location Alias 2: 00/02-32-063-13 W5/02
Country: Canada
Province: Alberta
Township: 063
Meridian: 5
Range: 13
Section: 32
County/Municipality: Woodlands County
Well Name: ACL HOPE CREEK 2-32-63-13
Operator Name: Paramount Resources Ltd.
License Number: 0021714
License Date: 1961-11-20
License Status: Suspension
Spud Date: 1961-11-24
Final Drill Date: 1961-12-30
Well Total Depth: 2993.10 m
Surface Hole Latitude: 54.488350
Surface Hole Longitude: -115.926200

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1961-11-20 Obtained License
1961-11-27 Lost Circulation Occurred
1961-12-30 Finished Drilling
1961-12-30 Well Log Performed
1961-12-31 Well Log Performed
1962-01-02 Drill Stem Test Performed
1962-01-03 Drill Stem Test Performed
1962-01-04 Drill Stem Test Performed
1962-01-06 Drill Stem Test Performed
1962-01-07 Drill Stem Test Performed
1962-01-10 Production Casing Operation Performed
1962-01-11 Perforation Treatment Performed - Selective Jet Perforations
1962-01-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1962-01-14 Perforation Treatment Performed - Selective Jet Perforations
1962-01-15 Perforation Treatment Performed - Cement Squeeze
1962-01-17 Perforation Treatment Performed - Cement Squeeze
1962-01-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1962-01-20 Perforation Treatment Performed - Selective Jet Perforations
1962-01-26 Perforation Treatment Performed - Cement Squeeze
1962-01-27 Perforation Treatment Performed - Selective Jet Perforations
1962-01-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1962-01-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1962-01-30 Perforation Treatment Performed - Jet Perforation
1976-03-08 Perforation Treatment Performed - Jet Perforation
1976-03-11 Perforation Treatment Performed - Cement Plug
1976-03-13 Well Log Performed
1976-03-17 Perforation Treatment Performed - Jet Perforation
1976-03-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-03-25 Well Mode changed to Drilled and Cased
1976-08-22 Well Began Production
1976-08-22 Well Fluid changed to Crude Oil
1976-08-22 Well Mode changed to Flowing
1984-11-13 Well Log Performed
1990-06-18 Well Fluid changed to Crude Oil
1990-06-18 Well Mode changed to Suspended
1993-08-31 Well Fluid changed to Crude Oil
1993-08-31 Well Mode changed to Pumping
1994-10-14 Well Fluid changed to Crude Oil
1994-10-14 Well Mode changed to Suspended
1999-10-16 Well Log Performed
2003-11-17 Perforation Treatment Performed - Acid Squeeze - Press Used
2003-11-22 Well Fluid changed to Crude Oil
2003-11-22 Well Mode changed to Pumping
2015-03-25 Well Fluid changed to Crude Oil
2015-03-25 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1962-01-11 Selective Jet Perforations 2859.30 2859.30 0
1962-01-27 Selective Jet Perforations 2829.20 2835.60 0
1962-01-27 Selective Jet Perforations 2846.50 2846.50 0
1962-01-28 Acid Treatment 2829.20 2846.50 0
1962-01-30 Perforation 2840.10 2841.30 7
1962-01-30 Perforation 2845.00 2847.70 7
1962-01-30 Perforation 2828.20 2830.70 7
1962-01-30 Perforation 2834.60 2836.50 7
1962-01-30 Acid Treatment 2828.20 2847.70 0
1976-03-08 Perforation 2828.20 2847.70 0
1976-03-11 Cement Plug 2780.70 2896.20 0
1962-01-13 Acid Treatment 2859.30 2859.30 0
1976-03-17 Perforation 1884.30 1891.00 7
1976-03-19 Acid Treatment 1884.30 1891.00 0
2003-11-17 Acid Treatment 1884.30 1891.00 0
1962-01-14 Selective Jet Perforations 2859.60 2860.20 0
1962-01-15 Cement Squeeze 2859.30 2860.20 0
1962-01-17 Cement Squeeze 2859.30 2860.20 0
1962-01-20 Selective Jet Perforations 2859.30 2859.60 0
1962-01-20 Selective Jet Perforations 2859.90 2860.20 0
1962-01-20 Acid Treatment 2859.30 2860.20 0
1962-01-26 Cement Squeeze 2859.30 2860.20 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1976 2233 0.0 0.0 0.0
1977 5654 0.0 0.0 0.0
1978 5590 0.0 0.0 0.0
1979 2842 0.0 0.0 0.0
1980 3997 0.0 0.0 0.0
1981 3906 0.0 0.0 0.0
1982 6974 0.0 0.0 0.0
1983 6823 0.0 0.0 0.0
1984 8125 0.0 0.0 0.0
1985 4283 0.0 0.0 0.0
1986 761 0.0 0.0 0.0
1987 24 0.0 0.0 0.0
1990 744 0.0 0.0 0.0
1993 2184 0.0 0.0 0.0
2003 740 0.0 0.0 0.0
2004 6007 0.0 0.0 0.0
2005 3965 0.0 0.0 0.0
2006 3673 0.0 0.0 0.0
2007 6838 0.0 0.0 0.0
2008 8751 0.0 0.0 0.0
2009 8482 0.0 0.0 0.0
2010 8674 0.0 0.0 0.0
2011 7714 0.0 0.0 0.0
2012 5692 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1961-11-27 Lost Circulation 48.70 173.70
1961-11-27 Lost Circulation 314.50 314.50

For data sources see[6]

References