X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0635133008020

Well Details

Well ID: 0635133008020
Loading map...
Location: 02/08-30-063-13W5/0
Location Alias: 02/08-30-63-13 W5M
Location Alias 2: 02/08-30-063-13 W5/00
Country: Canada
Province: Alberta
Township: 063
Meridian: 5
Range: 13
Section: 30
County/Municipality: Woodlands County
Well Name: ACL VIRGHILLS 9-30-63-13
Operator Name: Paramount Resources Ltd.
License Number: 0113220
License Date: 1985-02-07
License Status: Suspension
Spud Date: 1985-02-28
Final Drill Date: 1985-03-14
Well Total Depth: 1920.00 m
Surface Hole Latitude: 54.479402
Surface Hole Longitude: -115.940594

For data sources see[1][2]

Well History

Date Event
1985-02-07 Obtained License
1985-03-02 Surface Casing Operation Performed
1985-03-08 Direction Drilling Operation Performed - Deviate
1985-03-14 Finished Drilling
1985-03-17 Production Casing Operation Performed
1985-03-18 Rig Released
1985-04-12 Perforation Treatment Performed - Jet Perforation
1985-09-23 Well Mode changed to Drilled and Cased
1985-10-16 Well Began Production
1985-10-16 Well Fluid changed to Crude Oil
1985-10-16 Well Mode changed to Pumping
1986-09-18 Well Log Performed
1986-10-03 Well Log Performed
2000-01-21 Perforation Treatment Performed - Cement Squeeze
2000-01-24 Perforation Treatment Performed - Jet Perforation
2000-02-03 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-02-05 Perforation Treatment Performed - Cement Plug
2000-02-22 Perforation Treatment Performed - Bridge Plug No Cement Required
2000-02-22 Plug Back Performed
2000-02-22 Well Fluid changed to Crude Oil
2000-02-22 Well Mode changed to Abandoned and Whipstocked

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1985-03-08 1340.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1985-04-12 Perforation 1847.00 1850.00 13
1985-04-12 Perforation 1851.50 1856.00 13
2000-01-21 Cement Squeeze 1847.00 1856.00 0
2000-01-24 Perforation 1847.00 1850.00 13
2000-02-03 Acid Treatment 1847.00 1850.00 0
2000-02-05 Cement Plug 1837.00 1840.00 0
2000-02-22 Bridge Plug, No Cement 1777.00 1777.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1985 1389 0.0 0.0 0.0
1986 6775 0.0 0.0 0.0
1987 7740 0.0 0.0 0.0
1988 7818 0.0 0.0 0.0
1989 8118 0.0 0.0 0.0
1990 8555 0.0 0.0 0.0
1991 8116 0.0 0.0 0.0
1992 7972 0.0 0.0 0.0
1993 7955 0.0 0.0 0.0
1994 7570 0.0 0.0 0.0
1995 8573 0.0 0.0 0.0
1996 8585 0.0 0.0 0.0
1997 7536 0.0 0.0 0.0
1998 5980 0.0 0.0 0.0
1999 5252 0.0 0.0 0.0

For data sources see[6]

References