X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0635103615000

Well Details

Well ID: 0635103615000
Loading map...
Location: 00/15-36-063-10W5/0
Location Alias: 00/15-36-63-10 W5M
Location Alias 2: 00/15-36-063-10 W5/00
Country: Canada
Province: Alberta
Township: 063
Meridian: 5
Range: 10
Section: 36
County/Municipality: Woodlands County
Well Name: CPEC JUDYCK 15-36-63-10
Operator Name: Crescent Point Energy Corp.
License Number: 0431767
License Date: 2011-02-22
License Status: Amended
Spud Date: 2011-03-03
Final Drill Date: 2011-03-28
Well Total Depth: 4005.00 m
Surface Hole Latitude: 54.489418
Surface Hole Longitude: -115.357882

For data sources see[1][2]

Well History

Date Event
2011-02-22 Obtained License
2011-03-03 Well Log Performed
2011-03-05 Surface Casing Operation Performed
2011-03-05 Well Log Performed
2011-03-10 Direction Drilling Operation Performed - Deviate
2011-03-17 Well Log Performed
2011-03-18 Direction Drilling Operation Performed - Horizontal
2011-03-19 Well Log Performed
2011-03-20 Intermediate Casing Operation Performed
2011-03-28 Finished Drilling
2011-03-28 Well Mode changed to Drilled and Cased
2011-03-31 Liner Casing Operation Performed
2011-03-31 Rig Released
2011-04-02 Perforation Treatment Performed - Multi-Stage Fracture
2011-04-02 Perforation Treatment Performed - Open-Hole Completion
2011-04-03 Well Began Production
2011-04-03 Well Fluid changed to Crude Oil
2011-04-03 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-03-10 2101.10 Deviate (5 - 79 degrees)
2011-03-18 2850.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-04-02 Multi-Stage Fracture 2982.60 2982.70 0
2011-04-02 Multi-Stage Fracture 3811.60 3811.70 0
2011-04-02 Multi-Stage Fracture 3897.30 3897.40 0
2011-04-02 Multi-Stage Fracture 3995.00 3995.10 0
2011-04-02 Open Hole/Barefoot Completion 4000.00 4005.00 0
2011-04-02 Multi-Stage Fracture 3068.30 3068.40 0
2011-04-02 Multi-Stage Fracture 3165.60 3165.70 0
2011-04-02 Multi-Stage Fracture 3262.90 3263.00 0
2011-04-02 Multi-Stage Fracture 3348.50 3348.60 0
2011-04-02 Multi-Stage Fracture 3445.70 3445.80 0
2011-04-02 Multi-Stage Fracture 3531.50 3531.60 0
2011-04-02 Multi-Stage Fracture 3628.80 3628.90 0
2011-04-02 Multi-Stage Fracture 3714.50 3714.60 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 5849 0.0 0.0 0.0
2012 8459 0.0 0.0 0.0
2013 7550 0.0 0.0 0.0
2014 7882 0.0 0.0 0.0
2015 5938 0.0 0.0 0.0
2016 8418 0.0 0.0 0.0
2017 8024 0.0 0.0 0.0
2018 8335 0.0 0.0 0.0
2019 7404 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[6]

References