X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0635102215000

Well Details

Well ID: 0635102215000
Loading map...
Location: 00/15-22-063-10W5/0
Location Alias: 00/15-22-63-10 W5M
Location Alias 2: 00/15-22-063-10 W5/00
Country: Canada
Province: Alberta
Township: 063
Meridian: 5
Range: 10
Section: 22
County/Municipality: Woodlands County
Well Name: CPEC JUDYCK 15-22-63-10
Operator Name: Crescent Point Energy Corp.
License Number: 0436552
License Date: 2011-09-02
License Status: Amended
Spud Date: 2011-11-26
Final Drill Date: 2011-12-20
Well Total Depth: 4510.00 m
Surface Hole Latitude: 54.473472
Surface Hole Longitude: -115.391086

For data sources see[1][2]

Well History

Date Event
2011-09-02 Obtained License
2011-11-27 Surface Casing Operation Performed
2011-12-05 Well Log Performed
2011-12-11 Well Log Performed
2011-12-12 Direction Drilling Operation Performed - Deviate
2011-12-12 Direction Drilling Operation Performed - Horizontal
2011-12-12 Intermediate Casing Operation Performed
2011-12-20 Finished Drilling
2011-12-20 Well Mode changed to Drilled and Cased
2011-12-23 Liner Casing Operation Performed
2011-12-25 Rig Released
2012-01-01 Well Began Production
2012-01-01 Well Fluid changed to Crude Oil
2012-01-01 Well Mode changed to Pumping
2012-01-06 Perforation Treatment Performed - Multi-Stage Fracture
2012-01-06 Perforation Treatment Performed - Open-Hole Completion
2012-01-30 Well Log Performed

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-12-12 2114.40 Deviate (5 - 79 degrees)
2011-12-12 2828.80 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-01-06 Multi-Stage Fracture 2927.70 2927.80 0
2012-01-06 Multi-Stage Fracture 3918.60 3918.70 0
2012-01-06 Multi-Stage Fracture 4026.40 4026.50 0
2012-01-06 Multi-Stage Fracture 4135.60 4135.70 0
2012-01-06 Multi-Stage Fracture 4232.00 4232.10 0
2012-01-06 Multi-Stage Fracture 4304.20 4304.30 0
2012-01-06 Multi-Stage Fracture 4441.60 4441.70 0
2012-01-06 Open Hole/Barefoot Completion 4508.00 4510.00 0
2012-01-06 Multi-Stage Fracture 3037.10 3037.20 0
2012-01-06 Multi-Stage Fracture 3145.20 3145.30 0
2012-01-06 Multi-Stage Fracture 3252.90 3253.00 0
2012-01-06 Multi-Stage Fracture 3362.10 3362.20 0
2012-01-06 Multi-Stage Fracture 3471.30 3471.40 0
2012-01-06 Multi-Stage Fracture 3580.60 3580.70 0
2012-01-06 Multi-Stage Fracture 3700.50 3700.60 0
2012-01-06 Multi-Stage Fracture 3809.30 3809.40 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 7294 0.0 0.0 0.0
2013 7155 0.0 0.0 0.0
2014 7634 0.0 0.0 0.0
2015 8230 0.0 0.0 0.0
2016 7567 0.0 0.0 0.0
2017 7634 0.0 0.0 0.0
2018 7284 0.0 0.0 0.0
2019 8193 0.0 0.0 0.0
2020 2086 0.0 0.0 0.0

For data sources see[6]

References