X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0635101309000

Well Details

Well ID: 0635101309000
Loading map...
Location: 00/09-13-063-10W5/0
Location Alias: 00/09-13-63-10 W5M
Location Alias 2: 00/09-13-063-10 W5/00
Country: Canada
Province: Alberta
Township: 063
Meridian: 5
Range: 10
Section: 13
County/Municipality: Woodlands County
Well Name: CPEC JUDYCK 9-13-63-10
Operator Name: Crescent Point Energy Corp.
License Number: 0421234
License Date: 2010-06-17
License Status: Suspension
Spud Date: 2010-10-21
Final Drill Date: 2010-11-03
Well Total Depth: 2785.00 m
Surface Hole Latitude: 54.454898
Surface Hole Longitude: -115.385297

For data sources see[1][2]

Well History

Date Event
2010-06-17 Obtained License
2010-10-22 Surface Casing Operation Performed
2010-10-23 Well Log Performed
2010-10-24 Direction Drilling Operation Performed - Horizontal
2010-10-29 Intermediate Casing Operation Performed
2010-11-03 Finished Drilling
2010-11-03 Well Mode changed to Drilled and Cased
2010-11-05 Liner Casing Operation Performed
2010-11-05 Rig Released
2010-11-25 Perforation Treatment Performed - Multi-Stage Fracture
2010-11-25 Perforation Treatment Performed - Open-Hole Completion
2011-02-26 Well Began Production
2011-02-26 Well Fluid changed to Crude Oil
2011-02-26 Well Mode changed to Pumping
2019-03-01 Well Fluid changed to Crude Oil
2019-03-01 Well Mode changed to Suspended

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2010-10-24 1200.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-11-25 Multi-Stage Fracture 1839.00 1839.10 0
2010-11-25 Multi-Stage Fracture 2740.00 2740.10 0
2010-11-25 Open Hole/Barefoot Completion 2745.00 2785.00 0
2010-11-25 Multi-Stage Fracture 1935.00 1935.10 0
2010-11-25 Multi-Stage Fracture 2031.20 2031.30 0
2010-11-25 Multi-Stage Fracture 2138.00 2138.10 0
2010-11-25 Multi-Stage Fracture 2233.20 2233.30 0
2010-11-25 Multi-Stage Fracture 2340.40 2340.50 0
2010-11-25 Multi-Stage Fracture 2435.60 2435.70 0
2010-11-25 Multi-Stage Fracture 2538.40 2538.50 0
2010-11-25 Multi-Stage Fracture 2643.20 2643.30 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 6249 0.0 0.0 0.0
2012 7914 0.0 0.0 0.0
2013 7789 0.0 0.0 0.0
2014 7307 0.0 0.0 0.0
2015 7363 0.0 0.0 0.0
2016 2873 0.0 0.0 0.0

For data sources see[6]

References