X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0635101306020

Well Details

Well ID: 0635101306020
Loading map...
Location: 02/06-13-063-10W5/0
Location Alias: 02/06-13-63-10 W5M
Location Alias 2: 02/06-13-063-10 W5/00
Country: Canada
Province: Alberta
Township: 063
Meridian: 5
Range: 10
Section: 13
County/Municipality: Woodlands County
Well Name: CPEC HZ JUDYCK 6-13-63-10
Operator Name: Crescent Point Energy Corp.
License Number: 0442891
License Date: 2012-01-16
License Status: Amended
Spud Date: 2012-03-26
Final Drill Date: 2012-04-10
Well Total Depth: 3834.00 m
Surface Hole Latitude: 54.448609
Surface Hole Longitude: -115.354296

For data sources see[1][2]

Well History

Date Event
2012-01-16 Obtained License
2012-03-28 Surface Casing Operation Performed
2012-04-01 Direction Drilling Operation Performed - Horizontal
2012-04-04 Intermediate Casing Operation Performed
2012-04-10 Finished Drilling
2012-04-10 Well Log Performed
2012-04-10 Well Mode changed to Drilled and Cased
2012-04-11 Liner Casing Operation Performed
2012-04-14 Rig Released
2012-04-26 Well Log Performed
2012-05-01 Perforation Treatment Performed - Multi-Stage Fracture
2012-05-01 Well Began Production
2012-05-01 Well Fluid changed to Crude Oil
2012-05-01 Well Mode changed to Pumping
2012-06-06 Well Log Performed

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2012-04-01 2219.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-05-01 Multi-Stage Fracture 3804.40 3805.30 0
2012-05-01 Multi-Stage Fracture 3154.10 3154.60 0
2012-05-01 Multi-Stage Fracture 3081.40 3081.90 0
2012-05-01 Multi-Stage Fracture 3008.60 3009.10 0
2012-05-01 Multi-Stage Fracture 2936.30 2936.80 0
2012-05-01 Multi-Stage Fracture 2866.30 2866.80 0
2012-05-01 Multi-Stage Fracture 2789.10 2789.60 0
2012-05-01 Multi-Stage Fracture 3731.60 3732.10 0
2012-05-01 Multi-Stage Fracture 3659.80 3660.30 0
2012-05-01 Multi-Stage Fracture 3588.40 3588.90 0
2012-05-01 Multi-Stage Fracture 3516.20 3516.70 0
2012-05-01 Multi-Stage Fracture 3444.20 3444.70 0
2012-05-01 Multi-Stage Fracture 3372.40 3372.90 0
2012-05-01 Multi-Stage Fracture 3299.80 3300.30 0
2012-05-01 Multi-Stage Fracture 3227.20 3227.70 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 3890 0.0 0.0 0.0
2013 6304 0.0 0.0 0.0
2014 8037 0.0 0.0 0.0
2015 7857 0.0 0.0 0.0
2016 6252 0.0 0.0 0.0
2017 6866 0.0 0.0 0.0
2018 6282 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-03-26 No Incident Encountered 0.00 0.00
2012-05-07 No Incident Encountered 0.00 0.00

For data sources see[7]

References