X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0635092916000

Well Details

Well ID: 0635092916000
Loading map...
Location: 00/16-29-063-09W5/0
Location Alias: 00/16-29-63-09 W5M
Location Alias 2: 00/16-29-063-09 W5/00
Country: Canada
Province: Alberta
Township: 063
Meridian: 5
Range: 09
Section: 29
County/Municipality: Woodlands County
Well Name: CPEC JUDYCK 16-29-63-9
Operator Name: Crescent Point Energy Corp.
License Number: 0440232
License Date: 2011-12-02
License Status: Issued
Spud Date: 2012-01-09
Final Drill Date: 2012-01-29
Well Total Depth: 4042.00 m
Surface Hole Latitude: 54.487299
Surface Hole Longitude: -115.341418

For data sources see[1][2]

Well History

Date Event
2011-12-02 Obtained License
2012-01-11 Well Log Performed
2012-01-12 Surface Casing Operation Performed
2012-01-12 Well Log Performed
2012-01-14 Direction Drilling Operation Performed - Deviate
2012-01-16 Direction Drilling Operation Performed - Horizontal
2012-01-20 Intermediate Casing Operation Performed
2012-01-29 Finished Drilling
2012-01-29 Well Mode changed to Drilled and Cased
2012-01-30 Liner Casing Operation Performed
2012-02-01 Rig Released
2012-02-01 Well Began Production
2012-02-01 Well Fluid changed to Crude Oil
2012-02-01 Well Mode changed to Pumping
2012-02-22 Perforation Treatment Performed - Multi-Stage Fracture
2012-02-22 Perforation Treatment Performed - Open-Hole Completion

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-01-09 Ironhand Drilling Inc. 2 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-01-14 2177.50 Deviate (5 - 79 degrees)
2012-01-16 2657.60 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-02-22 Multi-Stage Fracture 2862.10 2862.20 0
2012-02-22 Multi-Stage Fracture 3587.20 3587.30 0
2012-02-22 Multi-Stage Fracture 3673.40 3673.50 0
2012-02-22 Multi-Stage Fracture 3759.70 3759.80 0
2012-02-22 Multi-Stage Fracture 3845.90 3846.00 0
2012-02-22 Multi-Stage Fracture 3931.50 3931.60 0
2012-02-22 Multi-Stage Fracture 4017.00 4017.10 0
2012-02-22 Open Hole/Barefoot Completion 4022.00 4042.00 0
2012-02-22 Multi-Stage Fracture 2912.60 2912.70 0
2012-02-22 Multi-Stage Fracture 2986.70 2986.80 0
2012-02-22 Multi-Stage Fracture 3073.20 3073.30 0
2012-02-22 Multi-Stage Fracture 3158.80 3158.90 0
2012-02-22 Multi-Stage Fracture 3244.10 3244.20 0
2012-02-22 Multi-Stage Fracture 3330.10 3330.20 0
2012-02-22 Multi-Stage Fracture 3416.10 3416.20 0
2012-02-22 Multi-Stage Fracture 3501.70 3501.80 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 6756 0.0 0.0 0.0
2013 8180 0.0 0.0 0.0
2014 8537 0.0 0.0 0.0
2015 8571 0.0 0.0 0.0
2016 8730 0.0 0.0 0.0
2017 8651 0.0 0.0 0.0
2018 8729 0.0 0.0 0.0
2019 8697 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[7]

References