X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0635090705000

Well Details

Well ID: 0635090705000
Loading map...
Location: 00/05-07-063-09W5/0
Location Alias: 00/05-07-63-09 W5M
Location Alias 2: 00/05-07-063-09 W5/00
Country: Canada
Province: Alberta
Township: 063
Meridian: 5
Range: 09
Section: 07
County/Municipality: Woodlands County
Well Name: CPEC JUDYCK 5-7-63-9
Operator Name: Crescent Point Energy Corp.
License Number: 0439669
License Date: 2011-11-25
License Status: Issued
Spud Date: 2012-01-19
Final Drill Date: 2012-02-10
Well Total Depth: 4665.00 m
Surface Hole Latitude: 54.433574
Surface Hole Longitude: -115.319827

For data sources see[1][2]

Well History

Date Event
2011-11-25 Obtained License
2012-01-21 Surface Casing Operation Performed
2012-01-25 Direction Drilling Operation Performed - Deviate
2012-01-29 Direction Drilling Operation Performed - Horizontal
2012-01-30 Intermediate Casing Operation Performed
2012-02-10 Finished Drilling
2012-02-10 Well Log Performed
2012-02-10 Well Mode changed to Drilled and Cased
2012-02-12 Liner Casing Operation Performed
2012-02-13 Rig Released
2012-03-01 Well Began Production
2012-03-01 Well Fluid changed to Crude Oil
2012-03-01 Well Mode changed to Pumping
2012-03-02 Perforation Treatment Performed - Multi-Stage Fracture
2012-03-02 Perforation Treatment Performed - Open-Hole Completion
2012-03-24 Well Log Performed

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-01-19 Ensign Drilling Inc. 113 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-01-25 2136.00 Deviate (5 - 79 degrees)
2012-01-29 2666.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-03-02 Multi-Stage Fracture 2732.50 2732.60 0
2012-03-02 Multi-Stage Fracture 3936.00 3936.10 0
2012-03-02 Multi-Stage Fracture 4065.60 4065.70 0
2012-03-02 Multi-Stage Fracture 4196.80 4196.90 0
2012-03-02 Multi-Stage Fracture 4326.80 4326.90 0
2012-03-02 Multi-Stage Fracture 4467.10 4467.20 0
2012-03-02 Multi-Stage Fracture 4598.30 4598.40 0
2012-03-02 Open Hole/Barefoot Completion 4603.30 4665.00 0
2012-03-02 Multi-Stage Fracture 2866.80 2866.90 0
2012-03-02 Multi-Stage Fracture 3001.30 3001.40 0
2012-03-02 Multi-Stage Fracture 3134.00 3134.10 0
2012-03-02 Multi-Stage Fracture 3265.60 3265.70 0
2012-03-02 Multi-Stage Fracture 3395.90 3396.00 0
2012-03-02 Multi-Stage Fracture 3526.60 3527.70 0
2012-03-02 Multi-Stage Fracture 3668.00 3668.10 0
2012-03-02 Multi-Stage Fracture 3798.50 3798.60 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 5238 0.0 0.0 0.0
2013 8340 0.0 0.0 0.0
2014 8562 0.0 0.0 0.0
2015 8717 0.0 0.0 0.0
2016 8737 0.0 0.0 0.0
2017 8732 0.0 0.0 0.0
2018 8757 0.0 0.0 0.0
2019 6533 0.0 0.0 0.0
2020 2141 0.0 0.0 0.0

For data sources see[7]

References