X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0635090505002

Well Details

Well ID: 0635090505002
Loading map...
Location: 00/05-05-063-09W5/2
Location Alias: 00/05-05-63-09 W5M
Location Alias 2: 00/05-05-063-09 W5/02
Country: Canada
Province: Alberta
Township: 063
Meridian: 5
Range: 09
Section: 05
County/Municipality: Woodlands County
Well Name: CPEC JUDYCK 5-5-63-9
Operator Name: Crescent Point Energy Corp.
License Number: 0444732
License Date: 2012-03-07
License Status: Suspension
Spud Date: 2012-05-03
Final Drill Date: 2012-05-30
Well Total Depth: 4115.00 m
Surface Hole Latitude: 54.420606
Surface Hole Longitude: -115.306053

For data sources see[1][2]

Well History

Date Event
2012-03-07 Obtained License
2012-05-04 Surface Casing Operation Performed
2012-05-08 Direction Drilling Operation Performed - Deviate
2012-05-20 Direction Drilling Operation Performed - Horizontal
2012-05-21 Intermediate Casing Operation Performed
2012-05-30 Finished Drilling
2012-05-30 Liner Casing Operation Performed
2012-05-30 Well Log Performed
2012-05-30 Well Mode changed to Drilled and Cased
2012-06-01 Rig Released
2012-07-01 Well Began Production
2012-07-01 Well Fluid changed to Crude Oil
2012-07-01 Well Mode changed to Pumping
2012-07-07 Well Log Performed
2012-07-15 Perforation Treatment Performed - Multi-Stage Fracture

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2012-05-08 2171.30 Deviate (5 - 79 degrees)
2012-05-20 2572.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-07-15 Multi-Stage Fracture 4066.60 4066.70 0
2012-07-15 Multi-Stage Fracture 3245.20 3245.30 0
2012-07-15 Multi-Stage Fracture 3148.40 3148.50 0
2012-07-15 Multi-Stage Fracture 3059.70 3059.80 0
2012-07-15 Multi-Stage Fracture 2968.90 2969.00 0
2012-07-15 Multi-Stage Fracture 2886.50 2886.60 0
2012-07-15 Multi-Stage Fracture 2791.00 2791.10 0
2012-07-15 Multi-Stage Fracture 2693.60 2693.70 0
2012-07-15 Multi-Stage Fracture 3964.90 3965.00 0
2012-07-15 Multi-Stage Fracture 3882.50 3882.60 0
2012-07-15 Multi-Stage Fracture 3799.70 3799.80 0
2012-07-15 Multi-Stage Fracture 3717.40 3717.50 0
2012-07-15 Multi-Stage Fracture 3634.10 3634.20 0
2012-07-15 Multi-Stage Fracture 3537.80 3537.90 0
2012-07-15 Multi-Stage Fracture 3439.70 3439.80 0
2012-07-15 Multi-Stage Fracture 3341.20 3341.30 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 3288 0.0 0.0 0.0
2013 8448 0.0 0.0 0.0
2014 8383 0.0 0.0 0.0
2015 8658 0.0 0.0 0.0
2016 8717 0.0 0.0 0.0
2017 3791 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-05-03 No Incident Encountered 0.00 0.00
2012-08-02 No Incident Encountered 0.00 0.00

For data sources see[7]

References