X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0634211015000

Well Details

Well ID: 0634211015000
Loading map...
Location: 00/15-10-063-21W4/0
Location Alias: 00/15-10-63-21 W4M
Location Alias 2: 00/15-10-063-21 W4/00
Country: Canada
Province: Alberta
Township: 063
Meridian: 4
Range: 21
Section: 10
County/Municipality: Thorhild County
Well Name: DAYLIGHT JILES 15-10-63-21
Operator Name: Sinopec Daylight Energy Ltd.
License Number: 0256376
License Date: 2001-06-15
License Status: Abandoned
Spud Date: 2001-07-13
Final Drill Date: 2001-07-17
Well Total Depth: 788.00 m
Surface Hole Latitude: 54.440969
Surface Hole Longitude: -113.088482

For data sources see[1][2]

Well History

Date Event
2001-06-15 Obtained License
2001-07-13 Well Log Performed
2001-07-14 Surface Casing Operation Performed
2001-07-17 Finished Drilling
2001-07-17 Well Log Performed
2001-07-18 Production Casing Operation Performed
2001-07-18 Rig Released
2001-07-18 Well Mode changed to Drilled and Cased
2001-08-02 Perforation Treatment Performed - Jet Perforation
2001-08-02 Well Log Performed
2001-09-01 Well Began Production
2001-09-01 Well Fluid changed to Gas
2001-09-01 Well Mode changed to Flowing
2006-03-03 Well Fluid changed to Gas
2006-03-03 Well Mode changed to Suspended
2006-03-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-03-04 Plug Back Performed
2006-03-04 Well Fluid changed to Gas
2006-03-04 Well Log Performed
2006-03-04 Well Mode changed to Abandoned Zone
2006-03-05 Perforation Treatment Performed - Jet Perforation
2006-03-05 Well Log Performed
2011-09-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-09-07 Plug Back Performed
2011-09-07 Well Log Performed
2020-01-05 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2001-08-02 Perforation 733.00 735.00 17
2006-03-04 Packing Device Capped w/Cement 715.00 723.00 0
2006-03-05 Perforation 635.00 636.00 20
2011-09-07 Packing Device Capped w/Cement 617.00 625.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2001 2928 0.0 0.0 0.0
2002 8752 0.0 0.0 0.0
2003 7761 0.0 0.0 0.0
2004 113 0.0 0.0 0.0

For data sources see[5]

References