X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0634182607000

Well Details

Well ID: 0634182607000
Loading map...
Location: 00/07-26-063-18W4/0
Location Alias: 00/07-26-63-18 W4M
Location Alias 2: 00/07-26-063-18 W4/00
Country: Canada
Province: Alberta
Township: 063
Meridian: 4
Range: 18
Section: 26
County/Municipality: Thorhild County
Well Name: ACL FIGURE LAKE 7-26-63-18
Operator Name: Paramount Resources Ltd.
License Number: 0054136
License Date: 1975-07-04
License Status: Abandoned
Spud Date: 1975-07-12
Final Drill Date: 1975-07-22
Well Total Depth: 725.40 m
Surface Hole Latitude: 54.475294
Surface Hole Longitude: -112.608166

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1975-07-04 Obtained License
1975-07-17 Drill Stem Test Performed
1975-07-18 Drill Stem Test Performed
1975-07-19 Liner Casing Operation Performed
1975-07-21 Drill Stem Test Performed
1975-07-22 Finished Drilling
1975-07-23 Drill Stem Test Performed
1975-09-14 Perforation Treatment Performed - Open-Hole Completion
1975-10-06 Perforation Treatment Performed - Cement Plug
1975-10-07 Perforation Treatment Performed - Jet Perforation
1975-10-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1975-10-31 Well Mode changed to Drilled and Cased
1979-02-05 Well Fluid changed to Gas
1979-02-05 Well Mode changed to Testing
1979-02-06 Perforation Treatment Performed - Cement Squeeze
1979-02-06 Well Fluid changed to Gas
1979-02-06 Well Mode changed to Abandoned Zone
1979-02-16 Perforation Treatment Performed - Open-Hole Completion
1979-02-20 Perforation Treatment Performed - Cement Squeeze
1979-02-22 Perforation Treatment Performed - Jet Perforation
2020-03-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2020-03-05 Plug Back Performed
2020-03-15 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1975-09-14 Open Hole/Barefoot Completion 666.00 725.40 0
1979-02-22 Perforation 682.10 688.50 6
2020-03-05 Packing Device Capped w/Cement 465.10 473.10 0
2020-03-05 Packing Device Capped w/Cement 637.90 645.90 0
1975-10-06 Cement Plug 602.30 678.20 0
1975-10-07 Perforation 484.00 485.20 7
1975-10-08 Acid Treatment 484.00 485.20 0
1979-02-06 Cement Squeeze 484.00 485.20 0
1979-02-16 Open Hole/Barefoot Completion 678.20 692.00 0
1979-02-20 Cement Squeeze 678.20 692.00 0
1979-02-22 Perforation 672.30 674.20 6
1979-02-22 Perforation 676.60 680.30 6

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1975 149 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1979-02-22 No Incident Encountered 0.00 0.00
2020-03-06 No Incident Encountered 0.00 0.00

For data sources see[6]

References