X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0634081306AB0

Well Details

Well ID: 0634081306AB0
Loading map...
Location: AB/06-13-063-08W4/0
Location Alias: AB/06-13-63-08 W4M
Location Alias 2: AB/06-13-063-08 W4/00
Country: Canada
Province: Alberta
Township: 063
Meridian: 4
Range: 08
Section: 13
County/Municipality: Municipal District of Bonnyville No. 87
Well Name: CS WESTCOAST A3 SUGDEN EX 6-13-63-8
Operator Name: CNOOC Petroleum North America ULC
License Number: 0096707
License Date: 1982-07-19
License Status: RecExempt
Spud Date: 1982-07-29
Final Drill Date: 1982-08-03
Well Total Depth: 379.30 m
Surface Hole Latitude: 54.446832
Surface Hole Longitude: -111.079797

For data sources see[1][2]

Well History

Date Event
1982-07-19 Obtained License
1982-08-01 Production Casing Operation Performed
1982-08-03 Finished Drilling
1982-08-03 Perforation Treatment Performed - Open-Hole Completion
1982-08-03 Well Mode changed to Drilled and Cased
1982-12-04 Well Began Production
1982-12-04 Well Fluid changed to Crude Bitumen
1982-12-04 Well Type changed to Cyclical
1985-01-07 Well Log Performed
1985-09-01 Well Fluid changed to Crude Bitumen
1985-09-01 Well Mode changed to Suspended
1985-09-01 Well Type changed to Cyclical
1991-09-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1991-09-16 Plug Back Performed
1991-09-16 Well Fluid changed to Crude Bitumen
1991-09-16 Well Mode changed to Abandoned Zone
1991-09-16 Well Type changed to Cyclical
1992-07-22 Perforation Treatment Performed - Jet Perforation
1992-07-22 Well Log Performed
1992-07-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-07-30 Perforation Treatment Performed - Remedial Casing
1994-07-30 Well Fluid changed to Crude Bitumen
1994-07-30 Well Mode changed to Abandoned
1994-07-30 Well Type changed to Cyclical
1994-08-04 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1982-08-03 Open Hole/Barefoot Completion 366.50 379.30 0
1991-09-16 Packing Device Capped w/Cement 324.00 361.00 0
1992-07-22 Perforation 100.00 100.30 26
1992-07-23 Acid Treatment 100.00 100.30 0
1994-07-30 Remedial Casing Cementing 100.00 100.30 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1982 0 0.0 0.0 0.0
1983 7387 0.0 0.0 0.0
1984 7010 0.0 0.0 0.0
1985 4809 0.0 0.0 0.0

For data sources see[5]

References