If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0634071205000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.433276,"lon":-110.933582,"icon":""}]} |
Location: 00/05-12-063-07W4/0 | |
Location Alias: 00/05-12-63-07 W4M | |
Location Alias 2: 00/05-12-063-07 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 063 | |
Meridian: 4 | |
Range: 07 | |
Section: 12 | |
County/Municipality: Municipal District of Bonnyville No. 87 | |
Well Name: NUMAC WOLFLK 5-12-63-7 | |
Operator Name: Devon Canada Corporation | |
License Number: 0184141 | |
License Date: 1996-01-04 | |
License Status: RecCertified | |
Spud Date: 1996-02-10 | |
Final Drill Date: 1996-02-13 | |
Well Total Depth: 475.00 m | |
Surface Hole Latitude: 54.433276 | |
Surface Hole Longitude: -110.933582 |
Date | Event |
---|---|
1996-01-04 | Obtained License |
1996-02-11 | Surface Casing Operation Performed |
1996-02-13 | Finished Drilling |
1996-02-13 | Well Log Performed |
1996-02-13 | Well Mode changed to Drilled and Cased |
1996-02-14 | Production Casing Operation Performed |
1996-02-14 | Rig Released |
1996-03-20 | Well Log Performed |
1996-03-21 | Perforation Treatment Performed - Jet Perforation |
1996-03-21 | Well Log Performed |
1996-03-22 | Perforation Treatment Performed - Fractured |
1996-03-22 | Well Log Performed |
1996-07-02 | Well Began Production |
1996-07-02 | Well Fluid changed to Crude Bitumen |
1996-07-02 | Well Mode changed to Pumping |
2000-05-31 | Well Log Performed |
2000-06-01 | Perforation Treatment Performed - Jet Perforation |
2001-06-28 | Perforation Treatment Performed - Jet Perforation |
2001-06-28 | Well Log Performed |
2003-08-20 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2003-08-20 | Plug Back Performed |
2003-08-20 | Well Fluid changed to Crude Bitumen |
2003-08-20 | Well Log Performed |
2003-08-20 | Well Mode changed to Suspended |
2003-08-21 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2003-08-21 | Perforation Treatment Performed - Jet Perforation |
2003-08-21 | Plug Back Performed |
2003-08-21 | Well Fluid changed to Crude Bitumen |
2003-08-21 | Well Mode changed to Abandoned Zone |
2005-07-21 | Perforation Treatment Performed - Jet Perforation |
2005-07-28 | Perforation Treatment Performed - Jet Perforation |
2005-08-03 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2005-08-03 | Perforation Treatment Performed - Cement Plug |
2005-08-03 | Plug Back Performed |
2005-08-21 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1996-03-21 | Perforation | 350.00 | 356.00 | 26 |
2005-07-28 | Perforation | 350.00 | 356.00 | 26 |
2005-08-03 | Cement Plug | 356.00 | 475.00 | 0 |
2005-08-03 | Packing Device Capped w/Cement | 345.00 | 348.00 | 0 |
2005-08-03 | Packing Device Capped w/Cement | 250.00 | 335.00 | 0 |
2005-08-03 | Packing Device Capped w/Cement | 250.00 | 335.00 | 0 |
1996-03-22 | Fracture | 350.00 | 356.00 | 0 |
2000-06-01 | Perforation | 338.00 | 342.50 | 26 |
2001-06-28 | Perforation | 338.00 | 342.00 | 17 |
2003-08-20 | Packing Device Capped w/Cement | 340.00 | 348.00 | 0 |
2003-08-21 | Packing Device Capped w/Cement | 328.00 | 336.00 | 0 |
2003-08-21 | Perforation | 301.00 | 301.50 | 17 |
2003-08-21 | Perforation | 303.50 | 304.50 | 17 |
2005-07-21 | Perforation | 338.00 | 342.50 | 26 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1996 | 3548 | 0.0 | 0.0 | 0.0 |
1997 | 8473 | 0.0 | 0.0 | 0.0 |
1998 | 4215 | 0.0 | 0.0 | 0.0 |
2000 | 48 | 0.0 | 0.0 | 0.0 |
2001 | 2812 | 0.0 | 0.0 | 0.0 |
2002 | 24 | 0.0 | 0.0 | 0.0 |
For data sources see[5]