X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0625271214002

Well Details

Well ID: 0625271214002
Loading map...
Location: 00/14-12-062-27W5/2
Location Alias: 00/14-12-62-27 W5M
Location Alias 2: 00/14-12-062-27 W5/02
Country: Canada
Province: Alberta
Township: 062
Meridian: 5
Range: 27
Section: 12
County/Municipality: Municipal District of Greenview No. 16
Well Name: CEQUENCE HZ SIMON 14-12-62-27
Operator Name: Cequence Energy Ltd.
License Number: 0434251
License Date: 2011-06-10
License Status: Amended
Spud Date: 2011-08-26
Final Drill Date: 2011-10-12
Well Total Depth: 4588.00 m
Surface Hole Latitude: 54.355770
Surface Hole Longitude: -117.950338

For data sources see[1][2]

Well History

Date Event
2011-06-10 Obtained License
2011-09-12 Direction Drilling Operation Performed - Horizontal
2011-10-01 Intermediate Casing Operation Performed
2011-10-12 Finished Drilling
2011-10-12 Well Log Performed
2011-10-12 Well Mode changed to Drilled and Cased
2011-10-15 Liner Casing Operation Performed
2011-10-17 Rig Released
2011-10-24 Perforation Treatment Performed - Open-Hole Completion
2011-10-25 Perforation Treatment Performed - Multi-Stage Fracture
2011-10-26 Perforation Treatment Performed - Multi-Stage Fracture
2011-10-27 Perforation Treatment Performed - Multi-Stage Fracture
2011-11-01 Well Began Production
2011-11-01 Well Fluid changed to Gas
2011-11-01 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-09-12 2093.70 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-10-24 Open Hole/Barefoot Completion 4579.50 4588.00 0
2011-10-26 Multi-Stage Fracture 3648.60 3648.70 0
2011-10-27 Multi-Stage Fracture 3536.40 3536.50 0
2011-10-27 Multi-Stage Fracture 3424.50 3424.60 0
2011-10-27 Multi-Stage Fracture 3312.20 3312.30 0
2011-10-27 Multi-Stage Fracture 3200.00 3200.10 0
2011-10-27 Multi-Stage Fracture 3074.50 3074.60 0
2011-10-25 Multi-Stage Fracture 4555.10 4557.70 0
2011-10-25 Multi-Stage Fracture 4416.00 4416.10 0
2011-10-25 Multi-Stage Fracture 4304.80 4304.90 0
2011-10-25 Multi-Stage Fracture 4194.00 4194.10 0
2011-10-25 Multi-Stage Fracture 4081.70 4081.80 0
2011-10-26 Multi-Stage Fracture 3971.20 3971.30 0
2011-10-26 Multi-Stage Fracture 3859.10 3859.20 0
2011-10-26 Multi-Stage Fracture 3760.30 3760.40 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 1368 0.0 0.0 0.0
2012 8471 0.0 0.0 0.0
2013 7536 0.0 0.0 0.0
2014 8735 0.0 0.0 0.0
2015 5232 0.0 0.0 0.0
2016 4680 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 6336 0.0 0.0 0.0
2019 2472 0.0 0.0 0.0

For data sources see[6]

References