X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0625271007000

Well Details

Well ID: 0625271007000
Loading map...
Location: 00/07-10-062-27W5/0
Location Alias: 00/07-10-62-27 W5M
Location Alias 2: 00/07-10-062-27 W5/00
Country: Canada
Province: Alberta
Township: 062
Meridian: 5
Range: 27
Section: 10
County/Municipality: Municipal District of Greenview No. 16
Well Name: CEQUENCE HZ SIMON 7-10-62-27
Operator Name: Cequence Energy Ltd.
License Number: 0434202
License Date: 2011-06-09
License Status: Amended
Spud Date: 2011-07-24
Final Drill Date: 2011-08-17
Well Total Depth: 4098.00 m
Surface Hole Latitude: 54.356748
Surface Hole Longitude: -117.976570

For data sources see[1][2]

Well History

Date Event
2011-06-09 Obtained License
2011-07-24 Well Log Performed
2011-07-26 Surface Casing Operation Performed
2011-08-02 Direction Drilling Operation Performed - Horizontal
2011-08-10 Intermediate Casing Operation Performed
2011-08-17 Finished Drilling
2011-08-17 Lost Circulation Occurred
2011-08-17 Well Log Performed
2011-08-17 Well Mode changed to Drilled and Cased
2011-08-21 Liner Casing Operation Performed
2011-08-23 Rig Released
2011-08-26 Perforation Treatment Performed - Open-Hole Completion
2011-08-31 Well Log Performed
2011-09-02 Perforation Treatment Performed - Multi-Stage Fracture
2011-09-03 Well Began Production
2011-09-03 Well Fluid changed to Gas
2011-09-03 Well Mode changed to Flowing
2011-09-04 Perforation Treatment Performed - Multi-Stage Fracture

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-08-02 2415.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-08-26 Open Hole/Barefoot Completion 4092.50 4098.00 0
2011-09-04 Multi-Stage Fracture 3337.60 3337.70 0
2011-09-04 Multi-Stage Fracture 3246.10 3246.20 0
2011-09-04 Multi-Stage Fracture 3160.50 3160.60 0
2011-09-04 Multi-Stage Fracture 3074.00 3074.10 0
2011-09-04 Multi-Stage Fracture 2989.10 2989.20 0
2011-09-02 Multi-Stage Fracture 4083.10 4084.10 0
2011-09-02 Multi-Stage Fracture 4019.60 4019.70 0
2011-09-02 Multi-Stage Fracture 3920.50 3920.60 0
2011-09-02 Multi-Stage Fracture 3833.50 3833.60 0
2011-09-04 Multi-Stage Fracture 3755.80 3755.90 0
2011-09-04 Multi-Stage Fracture 3664.90 3665.00 0
2011-09-04 Multi-Stage Fracture 3562.10 3562.20 0
2011-09-04 Multi-Stage Fracture 3451.30 3451.40 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 2358 0.0 0.0 0.0
2012 8496 0.0 0.0 0.0
2013 8664 0.0 0.0 0.0
2014 8687 0.0 0.0 0.0
2015 3151 0.0 0.0 0.0
2016 6456 0.0 0.0 0.0
2017 8327 0.0 0.0 0.0
2018 7944 0.0 0.0 0.0
2019 8568 0.0 0.0 0.0
2020 2159 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2011-08-17 Lost Circulation 4098.00 4098.00

For data sources see[7]

References