X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0625270113000

Well Details

Well ID: 0625270113000
Loading map...
Location: 00/13-01-062-27W5/0
Location Alias: 00/13-01-62-27 W5M
Location Alias 2: 00/13-01-062-27 W5/00
Country: Canada
Province: Alberta
Township: 062
Meridian: 5
Range: 27
Section: 01
County/Municipality: Municipal District of Greenview No. 16
Well Name: TEMPLE ENERGY SIMON 13-1-62-27
Operator Name: Cequence Energy Ltd.
License Number: 0417556
License Date: 2010-01-19
License Status: Amended
Spud Date: 2010-02-14
Final Drill Date: 2010-02-28
Well Total Depth: 2950.00 m
Surface Hole Latitude: 54.342266
Surface Hole Longitude: -117.927949

For data sources see[1][2]

Well History

Date Event
2010-01-19 Obtained License
2010-02-16 Surface Casing Operation Performed
2010-02-17 Direction Drilling Operation Performed - Deviate
2010-02-28 Finished Drilling
2010-02-28 Well Log Performed
2010-02-28 Well Mode changed to Drilled and Cased
2010-03-01 Production Casing Operation Performed
2010-03-03 Rig Released
2010-03-05 Perforation Treatment Performed - Jet Perforation
2010-03-08 Perforation Treatment Performed - Fractured
2010-03-09 Perforation Treatment Performed - Jet Perforation
2010-03-10 Perforation Treatment Performed - Fractured
2010-03-26 Well Began Production
2010-03-26 Well Fluid changed to Gas
2010-03-26 Well Mode changed to Flowing
2011-10-01 Well Fluid changed to Gas
2011-10-01 Well Mode changed to Suspended

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2010-02-17 654.70 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-03-05 Perforation 2884.50 2885.50 7
2010-03-05 Perforation 2889.00 2891.00 7
2010-03-05 Perforation 2902.00 2903.00 7
2010-03-08 Fracture 2884.50 2903.00 0
2010-03-09 Perforation 2740.00 2741.00 7
2010-03-09 Perforation 2714.50 2715.50 7
2010-03-09 Perforation 2673.00 2674.00 7
2010-03-10 Fracture 2673.00 2741.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 339 0.0 0.0 0.0

For data sources see[6]

References