X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0625270101002

Well Details

Well ID: 0625270101002
Loading map...
Location: 00/01-01-062-27W5/2
Location Alias: 00/01-01-62-27 W5M
Location Alias 2: 00/01-01-062-27 W5/02
Country: Canada
Province: Alberta
Township: 062
Meridian: 5
Range: 27
Section: 01
County/Municipality: Municipal District of Greenview No. 16
Well Name: CAL HZ SIMON 1-1-62-27
Operator Name: Cequence Energy Ltd.
License Number: 0425941
License Date: 2010-11-17
License Status: Amended
Spud Date: 2010-11-29
Final Drill Date: 2010-12-20
Well Total Depth: 4446.00 m
Surface Hole Latitude: 54.341906
Surface Hole Longitude: -117.927944

For data sources see[1][2]

Well History

Date Event
2010-11-17 Obtained License
2010-12-01 Surface Casing Operation Performed
2010-12-04 Direction Drilling Operation Performed - Horizontal
2010-12-13 Direction Drilling Operation Performed - Sidetrack Fish
2010-12-16 Intermediate Casing Operation Performed
2010-12-16 Well Log Performed
2010-12-20 Finished Drilling
2010-12-20 Well Log Performed
2010-12-20 Well Mode changed to Drilled and Cased
2010-12-22 Liner Casing Operation Performed
2010-12-23 Rig Released
2011-01-08 Perforation Treatment Performed - Multi-Stage Fracture
2011-01-09 Perforation Treatment Performed - Multi-Stage Fracture
2011-01-10 Perforation Treatment Performed - Multi-Stage Fracture
2011-01-11 Perforation Treatment Performed - Open-Hole Completion
2011-01-19 Well Began Production
2011-01-19 Well Fluid changed to Gas
2011-01-19 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2010-12-04 2267.00 Horizontal
2010-12-13 2393.00 Sidetrack fish

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-01-08 Multi-Stage Fracture 4386.80 4390.10 0
2011-01-09 Multi-Stage Fracture 3396.30 3396.40 0
2011-01-09 Multi-Stage Fracture 3269.90 3270.00 0
2011-01-09 Multi-Stage Fracture 3170.20 3170.30 0
2011-01-09 Multi-Stage Fracture 3083.90 3084.00 0
2011-01-10 Multi-Stage Fracture 2984.00 2984.10 0
2011-01-10 Multi-Stage Fracture 2884.20 2884.30 0
2011-01-10 Multi-Stage Fracture 2706.10 2706.20 0
2011-01-11 Open Hole/Barefoot Completion 4438.70 4446.00 0
2011-01-08 Multi-Stage Fracture 4300.40 4300.50 0
2011-01-08 Multi-Stage Fracture 4200.70 4200.80 0
2011-01-08 Multi-Stage Fracture 4101.10 4101.20 0
2011-01-08 Multi-Stage Fracture 4001.60 4001.70 0
2011-01-08 Multi-Stage Fracture 3901.80 3901.90 0
2011-01-09 Multi-Stage Fracture 3802.10 3802.20 0
2011-01-09 Multi-Stage Fracture 3689.60 3689.70 0
2011-01-09 Multi-Stage Fracture 3536.00 3536.10 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 8088 0.0 0.0 0.0
2012 8303 0.0 0.0 0.0
2013 8664 0.0 0.0 0.0
2014 8735 0.0 0.0 0.0
2015 3336 0.0 0.0 0.0
2016 5064 0.0 0.0 0.0
2017 8327 0.0 0.0 0.0
2018 7727 0.0 0.0 0.0
2019 7703 0.0 0.0 0.0
2020 2159 0.0 0.0 0.0

For data sources see[6]

References