X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0625261115000

Well Details

Well ID: 0625261115000
Loading map...
Location: 00/15-11-062-26W5/0
Location Alias: 00/15-11-62-26 W5M
Location Alias 2: 00/15-11-062-26 W5/00
Country: Canada
Province: Alberta
Township: 062
Meridian: 5
Range: 26
Section: 11
County/Municipality: Municipal District of Greenview No. 16
Well Name: CEQUENCE ET AL SIMON 15-11-62-26
Operator Name: Cequence Energy Ltd.
License Number: 0480679
License Date: 2016-10-06
License Status: Issued
Spud Date: 2016-11-20
Final Drill Date: 2016-12-03
Well Total Depth: 4450.00 m
Surface Hole Latitude: 54.350913
Surface Hole Longitude: -117.746745

For data sources see[1][2]

Well History

Date Event
2016-10-06 Obtained License
2016-11-22 Surface Casing Operation Performed
2016-11-25 Direction Drilling Operation Performed - Deviate
2016-11-28 Direction Drilling Operation Performed - Horizontal
2016-12-03 Finished Drilling
2016-12-03 Well Log Performed
2016-12-03 Well Mode changed to Drilled and Cased
2016-12-05 Production Casing Operation Performed
2016-12-06 Rig Released
2016-12-06 Well Log Performed
2016-12-30 Perforation Treatment Performed - Multi-Stage Fracture
2016-12-31 Perforation Treatment Performed - Multi-Stage Fracture
2017-01-01 Perforation Treatment Performed - Multi-Stage Fracture
2017-01-03 Well Began Production
2017-01-03 Well Fluid changed to Crude Oil
2017-01-03 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2016-11-20 Chinook Drilling Inc. 5 N/A Set Surface

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2016-11-25 1730.00 Deviate (5 - 79 degrees)
2016-11-28 2057.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2016-12-30 Multi-Stage Fracture 4408.90 4409.00 0
2016-12-31 Multi-Stage Fracture 3900.50 3900.60 0
2016-12-31 Multi-Stage Fracture 3842.40 3842.50 0
2016-12-31 Multi-Stage Fracture 3784.20 3784.30 0
2016-12-31 Multi-Stage Fracture 3726.10 3726.20 0
2016-12-31 Multi-Stage Fracture 3668.00 3668.10 0
2016-12-31 Multi-Stage Fracture 3610.00 3610.10 0
2016-12-31 Multi-Stage Fracture 3351.70 3351.80 0
2016-12-31 Multi-Stage Fracture 3493.50 3493.60 0
2016-12-31 Multi-Stage Fracture 3435.10 3435.20 0
2016-12-31 Multi-Stage Fracture 3377.00 3377.10 0
2016-12-30 Multi-Stage Fracture 4366.00 4366.10 0
2016-12-31 Multi-Stage Fracture 3318.60 3318.70 0
2016-12-31 Multi-Stage Fracture 3260.50 3260.60 0
2016-12-31 Multi-Stage Fracture 3201.10 3201.20 0
2016-12-31 Multi-Stage Fracture 3144.10 3144.20 0
2016-12-31 Multi-Stage Fracture 3086.00 3086.10 0
2016-12-31 Multi-Stage Fracture 3027.90 3028.00 0
2016-12-31 Multi-Stage Fracture 2969.90 2970.00 0
2016-12-31 Multi-Stage Fracture 2911.50 2911.60 0
2017-01-01 Multi-Stage Fracture 2853.40 2853.50 0
2017-01-01 Multi-Stage Fracture 2795.20 2795.30 0
2016-12-30 Multi-Stage Fracture 4308.10 4308.20 0
2017-01-01 Multi-Stage Fracture 2736.80 2736.90 0
2017-01-01 Multi-Stage Fracture 2678.70 2678.80 0
2017-01-01 Multi-Stage Fracture 2620.60 2620.70 0
2017-01-01 Multi-Stage Fracture 2562.40 2562.50 0
2017-01-01 Multi-Stage Fracture 2504.00 2504.10 0
2017-01-01 Multi-Stage Fracture 2459.10 2459.20 0
2017-01-01 Multi-Stage Fracture 2414.40 2414.50 0
2016-12-30 Multi-Stage Fracture 4249.70 4249.80 0
2016-12-30 Multi-Stage Fracture 4191.60 4191.70 0
2016-12-31 Multi-Stage Fracture 4133.40 4133.50 0
2016-12-31 Multi-Stage Fracture 4075.20 4075.30 0
2016-12-31 Multi-Stage Fracture 4017.00 4017.10 0
2016-12-31 Multi-Stage Fracture 3958.80 3958.90 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2016-12-30 2017-01-01 1,986 4,345 N/A
2 2016-12-31 2017-01-01 1,986 0 N/A
3 2016-12-30 2016-12-31 1,986 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 76.7762 N/A
20/40 PR-6000 Calfrac Quartz 14808-60-7 100 3.2308 N/A
DWP-913 Calfrac Clay Control Non-Hazardous Ingredients Trade Secret 100 0.069 N/A
DWP-959 Calfrac Demulsifier Methanol 67-56-1 100 0.07 N/A
Non-Hazardous Ingredients Trade Secret 100 0.07 N/A
Nitrogen Calfrac Energizing Fluid Nitrogen 7727-37-9 100 3.4823 N/A
DWP-621 Calfrac Friction Reducer Non-Hazardous Ingredients Trade Secret 100 0.0775 N/A
2 20/40 Sand Calfrac Crystalline silica (Quartz) 14808-60-7 100 15.4459 N/A
3 30/50 Sand Calfrac Crystalline silica (Quartz) 14808-60-7 100 8.2131 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2016-12-12 2016-12-15 Groundwater - Non-saline less than or equal to 150m deep 1805
2016-12-11 2016-12-14 Groundwater - Non-saline less than or equal to 150m deep 1416
2016-12-20 2016-12-26 Groundwater - Non-saline less than or equal to 150m deep 1168
2016-12-16 2016-12-22 Groundwater - Non-saline less than or equal to 150m deep 858
2016-12-11 2016-12-19 Surface Water - Runoff 1135

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2017 6079 0.0 0.0 0.0
2018 5494 0.0 0.0 0.0
2019 7481 0.0 0.0 0.0
2020 2065 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2016-12-06 No Incident Encountered 0.00 0.00
2017-01-01 No Incident Encountered 0.00 0.00

For data sources see[10]

References