X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0625261104000

Well Details

Well ID: 0625261104000
Loading map...
Location: 00/04-11-062-26W5/0
Location Alias: 00/04-11-62-26 W5M
Location Alias 2: 00/04-11-062-26 W5/00
Country: Canada
Province: Alberta
Township: 062
Meridian: 5
Range: 26
Section: 11
County/Municipality: Municipal District of Greenview No. 16
Well Name: CEQUENCE ET AL 5-7 SIMON 4-11-62-26
Operator Name: Cequence Energy Ltd.
License Number: 0476979
License Date: 2015-09-23
License Status: Issued
Spud Date: 2015-10-11
Final Drill Date: 2015-10-29
Well Total Depth: 5545.00 m
Surface Hole Latitude: 54.346044
Surface Hole Longitude: -117.745539

For data sources see[1][2]

Well History

Date Event
2015-09-23 Obtained License
2015-10-12 Surface Casing Operation Performed
2015-10-14 Direction Drilling Operation Performed - Deviate
2015-10-16 Direction Drilling Operation Performed - Horizontal
2015-10-29 Finished Drilling
2015-10-29 Well Log Performed
2015-10-29 Well Mode changed to Drilled and Cased
2015-10-30 Well Log Performed
2015-11-05 Liner Casing Operation Performed
2015-11-05 Production Casing Operation Performed
2015-11-06 Rig Released
2015-11-17 Well Log Performed
2015-11-18 Perforation Treatment Performed - Open-Hole Completion
2015-11-25 Perforation Treatment Performed - Multi-Stage Fracture
2015-11-26 Perforation Treatment Performed - Multi-Stage Fracture
2015-11-27 Perforation Treatment Performed - Multi-Stage Fracture
2015-11-28 Perforation Treatment Performed - Multi-Stage Fracture
2015-11-29 Perforation Treatment Performed - Multi-Stage Fracture
2016-01-15 Well Began Production
2016-01-15 Well Fluid changed to Crude Oil
2016-01-15 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2015-10-11 Precision Drilling Corporation 382 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2015-10-14 1731.80 Deviate (5 - 79 degrees)
2015-10-16 2069.40 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2015-11-18 Open Hole/Barefoot Completion 5541.00 5545.00 0
2015-11-26 Multi-Stage Fracture 5082.10 5083.70 0
2015-11-26 Multi-Stage Fracture 5024.70 5026.30 0
2015-11-26 Multi-Stage Fracture 4968.00 4969.60 0
2015-11-26 Multi-Stage Fracture 4911.60 4913.20 0
2015-11-27 Multi-Stage Fracture 4855.10 4856.70 0
2015-11-27 Multi-Stage Fracture 4798.50 4800.10 0
2015-11-27 Multi-Stage Fracture 4400.40 4401.90 0
2015-11-27 Multi-Stage Fracture 4356.70 4358.30 0
2015-11-27 Multi-Stage Fracture 4313.70 4315.30 0
2015-11-27 Multi-Stage Fracture 4281.70 4283.30 0
2015-11-25 Multi-Stage Fracture 5523.40 5525.30 0
2015-11-27 Multi-Stage Fracture 4250.40 4252.00 0
2015-11-27 Multi-Stage Fracture 4195.00 4196.60 0
2015-11-27 Multi-Stage Fracture 4137.90 4139.50 0
2015-11-27 Multi-Stage Fracture 4080.40 4082.00 0
2015-11-27 Multi-Stage Fracture 4023.30 4024.90 0
2015-11-27 Multi-Stage Fracture 3966.30 3967.90 0
2015-11-28 Multi-Stage Fracture 3909.20 3910.80 0
2015-11-29 Multi-Stage Fracture 3853.50 3855.10 0
2015-11-29 Multi-Stage Fracture 3795.40 3797.00 0
2015-11-29 Multi-Stage Fracture 3738.80 3740.40 0
2015-11-26 Multi-Stage Fracture 5481.50 5483.00 0
2015-11-29 Multi-Stage Fracture 3681.40 3683.00 0
2015-11-29 Multi-Stage Fracture 3623.80 3625.40 0
2015-11-29 Multi-Stage Fracture 3566.80 3568.40 0
2015-11-29 Multi-Stage Fracture 3508.90 3510.50 0
2015-11-29 Multi-Stage Fracture 3464.20 3465.80 0
2015-11-29 Multi-Stage Fracture 3420.30 3421.90 0
2015-11-29 Multi-Stage Fracture 3388.70 3390.30 0
2015-11-29 Multi-Stage Fracture 3357.10 3358.70 0
2015-11-29 Multi-Stage Fracture 3298.60 3300.20 0
2015-11-29 Multi-Stage Fracture 3242.50 3244.10 0
2015-11-26 Multi-Stage Fracture 5424.40 5426.00 0
2015-11-29 Multi-Stage Fracture 3184.00 3185.60 0
2015-11-29 Multi-Stage Fracture 3126.30 3127.80 0
2015-11-29 Multi-Stage Fracture 3068.30 3069.90 0
2015-11-29 Multi-Stage Fracture 3011.00 3012.60 0
2015-11-29 Multi-Stage Fracture 2955.90 2957.50 0
2015-11-29 Multi-Stage Fracture 2901.10 2902.70 0
2015-11-29 Multi-Stage Fracture 2847.00 2848.60 0
2015-11-29 Multi-Stage Fracture 2789.60 2791.20 0
2015-11-29 Multi-Stage Fracture 2733.30 2734.90 0
2015-11-26 Multi-Stage Fracture 5369.30 5370.80 0
2015-11-26 Multi-Stage Fracture 5312.70 5314.30 0
2015-11-26 Multi-Stage Fracture 5255.00 5256.60 0
2015-11-26 Multi-Stage Fracture 5196.20 5197.80 0
2015-11-26 Multi-Stage Fracture 5139.70 5141.30 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2015-11-25 2015-11-29 2,020 8,773 N/A
2 2015-11-26 2015-11-29 2,020 0 N/A
3 2015-11-25 2015-11-26 2,020 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 82.0013 N/A
20/40 Atlas CRC-E Calfrac Non-Hazardous Ingredients Trade Secret 100 2.6426 N/A
Phenolic Resin 9003-35-4 100 2.6426 N/A
Phenolic Resin 37337-65-8 100 2.6426 N/A
Quartz (SiO2) 14808-60-7 100 2.6426 N/A
DWP-966 Calfrac Bactericide/Biocide Bronopol 52-51-7 100 0.0583 N/A
Methanol 67-56-1 100 0.0564 N/A
Water 7732-18-5 100 0.0563 N/A
DWP-913 Calfrac Clay Control Non-Hazardous Ingredients Trade Secret 100 0.1023 N/A
DWP-949 Calfrac Demulsifier Ethoxylated alcohols 8300 100 0.116 N/A
Ethoxylated phenolic resin 8300 100 0.1178 N/A
Isobutyl ketone 8300 100 0.1161 N/A
Non-Hazardous Ingredients Trade Secret 100 0.1314 N/A
Organic acid salts 1 8300 100 0.116 N/A
Organic acid salts 2 8300 100 0.1175 N/A
Organic acid salts 3 8300 100 0.1178 N/A
Nitrogen Calfrac Energizing Fluid Nitrogen 7727-37-9 100 3.9894 N/A
DWP-621 Calfrac Friction Reducer Non-Hazardous Ingredients Trade Secret 100 0.1397 N/A
2 20/40 Sand Calfrac Crystalline silica (Quartz) 14808-60-7 100 11.2502 N/A
15% HCl Calfrac Acid Hydrochloric acid 7647-01-0 100 0.2752 N/A
Water 7732-18-5 100 0.2752 N/A
3 30/50 Sand Calfrac Crystalline silica (Quartz) 14808-60-7 100 6.9246 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2015-11-17 2015-11-24 Recycled Fracturing Water (treated at well site) 5956
2015-11-09 2015-11-20 Recycled Fracturing Water (treated at well site) 748
2015-11-18 2015-11-24 Recycled Fracturing Water (treated at well site) 2069

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2016 5998 0.0 0.0 0.0
2017 5164 0.0 0.0 0.0
2018 6407 0.0 0.0 0.0
2019 7841 0.0 0.0 0.0
2020 1820 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2015-11-07 No Incident Encountered 0.00 0.00
2015-12-23 No Incident Encountered 0.00 0.00

For data sources see[10]

References