If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0625261002000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.369248,"lon":-117.805045,"icon":""}]} |
Location: 00/02-10-062-26W5/0 | |
Location Alias: 00/02-10-62-26 W5M | |
Location Alias 2: 00/02-10-062-26 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 062 | |
Meridian: 5 | |
Range: 26 | |
Section: 10 | |
County/Municipality: Municipal District of Greenview No. 16 | |
Well Name: GAIN HZ SIMON 2-10-62-26 | |
Operator Name: Gain Energy Ltd. | |
License Number: 0491948 | |
License Date: 2018-11-09 | |
License Status: Amended | |
Spud Date: 2019-12-07 | |
Final Drill Date: 2019-12-15 | |
Well Total Depth: 4730.00 m | |
Surface Hole Latitude: 54.369248 | |
Surface Hole Longitude: -117.805045 |
Date | Event |
---|---|
2018-11-09 | Obtained License |
2019-12-07 | Drill To LD |
2019-12-08 | Surface Casing Operation Performed |
2019-12-09 | Direction Drilling Operation Performed - Deviate |
2019-12-10 | Direction Drilling Operation Performed - Horizontal |
2019-12-11 | Well Log Performed |
2019-12-15 | Finished Drilling |
2019-12-15 | Well Mode changed to Drilled and Cased |
2019-12-16 | Well Log Performed |
2019-12-17 | Production Casing Operation Performed |
2019-12-18 | Rig Released |
2019-12-28 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-12-28 | Perforation Treatment Performed - Open-Hole Completion |
2019-12-29 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-12-30 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-12-31 | Perforation Treatment Performed - Multi-Stage Fracture |
2020-01-10 | Well Began Production |
2020-01-10 | Well Fluid changed to Crude Oil |
2020-01-10 | Well Mode changed to Gas Lift |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2019-12-07 | Ensign Drilling Inc. | T419 | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2019-12-09 | 1182.10 | Deviate (5 - 79 degrees) |
2019-12-10 | 2165.10 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2019-12-28 | Open Hole/Barefoot Completion | 4726.10 | 4730.00 | 0 |
2019-12-29 | Multi-Stage Fracture | 4384.60 | 4384.70 | 0 |
2019-12-29 | Multi-Stage Fracture | 4327.30 | 4327.40 | 0 |
2019-12-29 | Multi-Stage Fracture | 4256.80 | 4256.90 | 0 |
2019-12-29 | Multi-Stage Fracture | 4212.50 | 4212.60 | 0 |
2019-12-29 | Multi-Stage Fracture | 4141.60 | 4141.70 | 0 |
2019-12-29 | Multi-Stage Fracture | 4070.40 | 4070.50 | 0 |
2019-12-29 | Multi-Stage Fracture | 4026.30 | 4026.40 | 0 |
2019-12-29 | Multi-Stage Fracture | 3981.60 | 3981.70 | 0 |
2019-12-29 | Multi-Stage Fracture | 3937.00 | 3937.10 | 0 |
2019-12-30 | Multi-Stage Fracture | 3892.10 | 3892.20 | 0 |
2019-12-28 | Multi-Stage Fracture | 4690.30 | 4690.40 | 0 |
2019-12-30 | Multi-Stage Fracture | 3847.40 | 3847.50 | 0 |
2019-12-30 | Multi-Stage Fracture | 3803.40 | 3803.50 | 0 |
2019-12-30 | Multi-Stage Fracture | 3732.30 | 3732.40 | 0 |
2019-12-30 | Multi-Stage Fracture | 3687.70 | 3687.80 | 0 |
2019-12-30 | Multi-Stage Fracture | 3643.00 | 3643.10 | 0 |
2019-12-30 | Multi-Stage Fracture | 3598.40 | 3598.50 | 0 |
2019-12-30 | Multi-Stage Fracture | 3553.50 | 3553.60 | 0 |
2019-12-30 | Multi-Stage Fracture | 3508.60 | 3508.70 | 0 |
2019-12-30 | Multi-Stage Fracture | 3464.00 | 3464.10 | 0 |
2019-12-30 | Multi-Stage Fracture | 3419.10 | 3419.20 | 0 |
2019-12-28 | Multi-Stage Fracture | 4659.10 | 4659.20 | 0 |
2019-12-30 | Multi-Stage Fracture | 3375.00 | 3375.10 | 0 |
2019-12-30 | Multi-Stage Fracture | 3327.10 | 3327.20 | 0 |
2019-12-30 | Multi-Stage Fracture | 3282.10 | 3282.20 | 0 |
2019-12-30 | Multi-Stage Fracture | 3237.30 | 3237.40 | 0 |
2019-12-30 | Multi-Stage Fracture | 3193.30 | 3193.40 | 0 |
2019-12-30 | Multi-Stage Fracture | 3148.30 | 3148.40 | 0 |
2019-12-30 | Multi-Stage Fracture | 3103.60 | 3103.70 | 0 |
2019-12-30 | Multi-Stage Fracture | 3059.10 | 3059.20 | 0 |
2019-12-30 | Multi-Stage Fracture | 3014.30 | 3014.40 | 0 |
2019-12-31 | Multi-Stage Fracture | 2969.50 | 2969.60 | 0 |
2019-12-28 | Multi-Stage Fracture | 4625.10 | 4625.20 | 0 |
2019-12-31 | Multi-Stage Fracture | 2925.00 | 2925.10 | 0 |
2019-12-31 | Multi-Stage Fracture | 2881.30 | 2881.40 | 0 |
2019-12-31 | Multi-Stage Fracture | 2836.40 | 2836.50 | 0 |
2019-12-31 | Multi-Stage Fracture | 2791.80 | 2791.90 | 0 |
2019-12-31 | Multi-Stage Fracture | 2747.10 | 2747.20 | 0 |
2019-12-31 | Multi-Stage Fracture | 2703.50 | 2703.60 | 0 |
2019-12-31 | Multi-Stage Fracture | 2658.80 | 2658.90 | 0 |
2019-12-31 | Multi-Stage Fracture | 2614.40 | 2614.50 | 0 |
2019-12-31 | Multi-Stage Fracture | 2569.80 | 2569.90 | 0 |
2019-12-31 | Multi-Stage Fracture | 2525.20 | 2525.30 | 0 |
2019-12-28 | Multi-Stage Fracture | 4593.90 | 4594.00 | 0 |
2019-12-31 | Multi-Stage Fracture | 2480.60 | 2480.70 | 0 |
2019-12-31 | Multi-Stage Fracture | 2436.30 | 2436.40 | 0 |
2019-12-31 | Multi-Stage Fracture | 2391.70 | 2391.80 | 0 |
2019-12-31 | Multi-Stage Fracture | 2346.90 | 2347.00 | 0 |
2019-12-31 | Multi-Stage Fracture | 2302.20 | 2302.30 | 0 |
2019-12-31 | Multi-Stage Fracture | 2257.70 | 2257.80 | 0 |
2019-12-31 | Multi-Stage Fracture | 2213.30 | 2213.40 | 0 |
2019-12-28 | Multi-Stage Fracture | 4562.70 | 4562.80 | 0 |
2019-12-28 | Multi-Stage Fracture | 4531.40 | 4531.50 | 0 |
2019-12-29 | Multi-Stage Fracture | 4500.10 | 4500.20 | 0 |
2019-12-29 | Multi-Stage Fracture | 4455.60 | 4455.70 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2019-12-28 | 2019-12-31 | 2,007 | 11,621 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | hydrochloric acid | 7647-01-0 | 100 | 2.2617 | N/A | |||
N2 | 7727-37-9 | 100 | 2.801 | N/A | ||||
water | Not Available | 100 | 45.8589 | N/A | ||||
Sand - Tier 1 20/40 | Trican | silica crystalline | 14808-60-7 | 100 | 10.2509 | N/A | ||
Sand - Tier 1 30/50 | Trican | silica crystalline | 14808-60-7 | 100 | 2.0926 | N/A | ||
Aqucar DB20 Biocide | Trican | Bactericide/Biocide | 2.2-dibromo-3-nitrilopropionamide | 10222-01-2 | 100 | 0.0112 | N/A | |
dibromoacetonitrile | 3252-43-5 | 100 | 0.0112 | N/A | ||||
non-hazardous ingredients | Not Available | 100 | 0.0112 | N/A | ||||
polyethylene glycol | 25322-68-3 | 100 | 0.0112 | N/A | ||||
sodium bromide | 7647-15-6 | 100 | 0.0112 | N/A | ||||
WBO-2 Breaker Oxidizer | Trican | Breaker | sodium persulfate | 7775-27-1 | 100 | 0.0054 | N/A | |
CC-10 | Trican | Clay Control | non-hazardous ingredients | Not Available | 100 | 0.0395 | N/A | |
AI-11 Corrosion Inhibitor | Trican | Corrosion Inhibitor | non-hazardous ingredients | Not Available | 100 | 0.0084 | N/A | |
potassium iodide | 7681-11-0 | 100 | 0.0084 | N/A | ||||
propargyl alcohol | 107-19-7 | 100 | 0.0084 | N/A | ||||
propargyl alcohol derivative | 38172-91-7 | 100 | 0.0084 | N/A | ||||
DF-2W Winterized Defoamer | Trican | Defoamer | non-hazardous ingredients | Not Available | 100 | 0.0002 | N/A | |
propylene glycol | 57-55-6 | 100 | 0.0002 | N/A | ||||
HVFR-7 (High Viscosity Friction Reducer) | Trican | Friction Reducer | distillates (petroleum). hydrotreated light naphthenic | 64742-53-6 | 100 | 0.0513 | N/A | |
non-hazardous ingredients | Not Available | 100 | 0.0513 | N/A | ||||
IC-8 Iron Control | Trican | Iron Control | 2-mercaptoethanol | 60-24-2 | 100 | 0.0071 | N/A | |
cupric chloride | 7447-39-4 | 100 | 0.0071 | N/A | ||||
monoethanolamine | 141-43-5 | 100 | 0.0071 | N/A | ||||
ASA-60W Antisludge | Trican | Surfactant | alkylbenzenesulfonic acid | 68584-22-5 | 100 | 0.0285 | N/A | |
dipropylene glycol | 25265-71-8 | 100 | 0.0285 | N/A | ||||
sodium hexyldiphenyl ether sulfonate | 147732-60-3 | 100 | 0.0285 | N/A | ||||
PFC-3 Proppant Flowback Control | Trican | Surfactant | aminofunctional polymer | 10352 | 100 | 0.0175 | N/A | |
glycol ether | 10352 | 100 | 0.0175 | N/A | ||||
petroleum distillates | 10352 | 100 | 0.0175 | N/A | ||||
silicon compound | 10352 | 100 | 0.0175 | N/A | ||||
S-28 Surfactant | Trican | Surfactant | methanol | 67-56-1 | 100 | 0.0379 | N/A | |
non-hazardous ingredients | Not Available | 100 | 0.0379 | N/A | ||||
solvent naphtha (petroleum). heavy aromatic | 64742-94-5 | 100 | 0.0379 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2019-12-27 | 2019-12-31 | Surface Water - Runoff | 13953 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2020 | 1865 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2019-12-10 | No Incident Encountered | 0.00 | 0.00 |
2020-01-04 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]