X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0625261002000

Well Details

Well ID: 0625261002000
Loading map...
Location: 00/02-10-062-26W5/0
Location Alias: 00/02-10-62-26 W5M
Location Alias 2: 00/02-10-062-26 W5/00
Country: Canada
Province: Alberta
Township: 062
Meridian: 5
Range: 26
Section: 10
County/Municipality: Municipal District of Greenview No. 16
Well Name: GAIN HZ SIMON 2-10-62-26
Operator Name: Gain Energy Ltd.
License Number: 0491948
License Date: 2018-11-09
License Status: Amended
Spud Date: 2019-12-07
Final Drill Date: 2019-12-15
Well Total Depth: 4730.00 m
Surface Hole Latitude: 54.369248
Surface Hole Longitude: -117.805045

For data sources see[1][2]

Well History

Date Event
2018-11-09 Obtained License
2019-12-07 Drill To LD
2019-12-08 Surface Casing Operation Performed
2019-12-09 Direction Drilling Operation Performed - Deviate
2019-12-10 Direction Drilling Operation Performed - Horizontal
2019-12-11 Well Log Performed
2019-12-15 Finished Drilling
2019-12-15 Well Mode changed to Drilled and Cased
2019-12-16 Well Log Performed
2019-12-17 Production Casing Operation Performed
2019-12-18 Rig Released
2019-12-28 Perforation Treatment Performed - Multi-Stage Fracture
2019-12-28 Perforation Treatment Performed - Open-Hole Completion
2019-12-29 Perforation Treatment Performed - Multi-Stage Fracture
2019-12-30 Perforation Treatment Performed - Multi-Stage Fracture
2019-12-31 Perforation Treatment Performed - Multi-Stage Fracture
2020-01-10 Well Began Production
2020-01-10 Well Fluid changed to Crude Oil
2020-01-10 Well Mode changed to Gas Lift

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2019-12-07 Ensign Drilling Inc. T419 Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2019-12-09 1182.10 Deviate (5 - 79 degrees)
2019-12-10 2165.10 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2019-12-28 Open Hole/Barefoot Completion 4726.10 4730.00 0
2019-12-29 Multi-Stage Fracture 4384.60 4384.70 0
2019-12-29 Multi-Stage Fracture 4327.30 4327.40 0
2019-12-29 Multi-Stage Fracture 4256.80 4256.90 0
2019-12-29 Multi-Stage Fracture 4212.50 4212.60 0
2019-12-29 Multi-Stage Fracture 4141.60 4141.70 0
2019-12-29 Multi-Stage Fracture 4070.40 4070.50 0
2019-12-29 Multi-Stage Fracture 4026.30 4026.40 0
2019-12-29 Multi-Stage Fracture 3981.60 3981.70 0
2019-12-29 Multi-Stage Fracture 3937.00 3937.10 0
2019-12-30 Multi-Stage Fracture 3892.10 3892.20 0
2019-12-28 Multi-Stage Fracture 4690.30 4690.40 0
2019-12-30 Multi-Stage Fracture 3847.40 3847.50 0
2019-12-30 Multi-Stage Fracture 3803.40 3803.50 0
2019-12-30 Multi-Stage Fracture 3732.30 3732.40 0
2019-12-30 Multi-Stage Fracture 3687.70 3687.80 0
2019-12-30 Multi-Stage Fracture 3643.00 3643.10 0
2019-12-30 Multi-Stage Fracture 3598.40 3598.50 0
2019-12-30 Multi-Stage Fracture 3553.50 3553.60 0
2019-12-30 Multi-Stage Fracture 3508.60 3508.70 0
2019-12-30 Multi-Stage Fracture 3464.00 3464.10 0
2019-12-30 Multi-Stage Fracture 3419.10 3419.20 0
2019-12-28 Multi-Stage Fracture 4659.10 4659.20 0
2019-12-30 Multi-Stage Fracture 3375.00 3375.10 0
2019-12-30 Multi-Stage Fracture 3327.10 3327.20 0
2019-12-30 Multi-Stage Fracture 3282.10 3282.20 0
2019-12-30 Multi-Stage Fracture 3237.30 3237.40 0
2019-12-30 Multi-Stage Fracture 3193.30 3193.40 0
2019-12-30 Multi-Stage Fracture 3148.30 3148.40 0
2019-12-30 Multi-Stage Fracture 3103.60 3103.70 0
2019-12-30 Multi-Stage Fracture 3059.10 3059.20 0
2019-12-30 Multi-Stage Fracture 3014.30 3014.40 0
2019-12-31 Multi-Stage Fracture 2969.50 2969.60 0
2019-12-28 Multi-Stage Fracture 4625.10 4625.20 0
2019-12-31 Multi-Stage Fracture 2925.00 2925.10 0
2019-12-31 Multi-Stage Fracture 2881.30 2881.40 0
2019-12-31 Multi-Stage Fracture 2836.40 2836.50 0
2019-12-31 Multi-Stage Fracture 2791.80 2791.90 0
2019-12-31 Multi-Stage Fracture 2747.10 2747.20 0
2019-12-31 Multi-Stage Fracture 2703.50 2703.60 0
2019-12-31 Multi-Stage Fracture 2658.80 2658.90 0
2019-12-31 Multi-Stage Fracture 2614.40 2614.50 0
2019-12-31 Multi-Stage Fracture 2569.80 2569.90 0
2019-12-31 Multi-Stage Fracture 2525.20 2525.30 0
2019-12-28 Multi-Stage Fracture 4593.90 4594.00 0
2019-12-31 Multi-Stage Fracture 2480.60 2480.70 0
2019-12-31 Multi-Stage Fracture 2436.30 2436.40 0
2019-12-31 Multi-Stage Fracture 2391.70 2391.80 0
2019-12-31 Multi-Stage Fracture 2346.90 2347.00 0
2019-12-31 Multi-Stage Fracture 2302.20 2302.30 0
2019-12-31 Multi-Stage Fracture 2257.70 2257.80 0
2019-12-31 Multi-Stage Fracture 2213.30 2213.40 0
2019-12-28 Multi-Stage Fracture 4562.70 4562.80 0
2019-12-28 Multi-Stage Fracture 4531.40 4531.50 0
2019-12-29 Multi-Stage Fracture 4500.10 4500.20 0
2019-12-29 Multi-Stage Fracture 4455.60 4455.70 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2019-12-28 2019-12-31 2,007 11,621 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 hydrochloric acid 7647-01-0 100 2.2617 N/A
N2 7727-37-9 100 2.801 N/A
water Not Available 100 45.8589 N/A
Sand - Tier 1 20/40 Trican silica crystalline 14808-60-7 100 10.2509 N/A
Sand - Tier 1 30/50 Trican silica crystalline 14808-60-7 100 2.0926 N/A
Aqucar DB20 Biocide Trican Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.0112 N/A
dibromoacetonitrile 3252-43-5 100 0.0112 N/A
non-hazardous ingredients Not Available 100 0.0112 N/A
polyethylene glycol 25322-68-3 100 0.0112 N/A
sodium bromide 7647-15-6 100 0.0112 N/A
WBO-2 Breaker Oxidizer Trican Breaker sodium persulfate 7775-27-1 100 0.0054 N/A
CC-10 Trican Clay Control non-hazardous ingredients Not Available 100 0.0395 N/A
AI-11 Corrosion Inhibitor Trican Corrosion Inhibitor non-hazardous ingredients Not Available 100 0.0084 N/A
potassium iodide 7681-11-0 100 0.0084 N/A
propargyl alcohol 107-19-7 100 0.0084 N/A
propargyl alcohol derivative 38172-91-7 100 0.0084 N/A
DF-2W Winterized Defoamer Trican Defoamer non-hazardous ingredients Not Available 100 0.0002 N/A
propylene glycol 57-55-6 100 0.0002 N/A
HVFR-7 (High Viscosity Friction Reducer) Trican Friction Reducer distillates (petroleum). hydrotreated light naphthenic 64742-53-6 100 0.0513 N/A
non-hazardous ingredients Not Available 100 0.0513 N/A
IC-8 Iron Control Trican Iron Control 2-mercaptoethanol 60-24-2 100 0.0071 N/A
cupric chloride 7447-39-4 100 0.0071 N/A
monoethanolamine 141-43-5 100 0.0071 N/A
ASA-60W Antisludge Trican Surfactant alkylbenzenesulfonic acid 68584-22-5 100 0.0285 N/A
dipropylene glycol 25265-71-8 100 0.0285 N/A
sodium hexyldiphenyl ether sulfonate 147732-60-3 100 0.0285 N/A
PFC-3 Proppant Flowback Control Trican Surfactant aminofunctional polymer 10352 100 0.0175 N/A
glycol ether 10352 100 0.0175 N/A
petroleum distillates 10352 100 0.0175 N/A
silicon compound 10352 100 0.0175 N/A
S-28 Surfactant Trican Surfactant methanol 67-56-1 100 0.0379 N/A
non-hazardous ingredients Not Available 100 0.0379 N/A
solvent naphtha (petroleum). heavy aromatic 64742-94-5 100 0.0379 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2019-12-27 2019-12-31 Surface Water - Runoff 13953

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2020 1865 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-12-10 No Incident Encountered 0.00 0.00
2020-01-04 No Incident Encountered 0.00 0.00

For data sources see[10]

References