X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0625260505000

Well Details

Well ID: 0625260505000
Loading map...
Location: 00/05-05-062-26W5/0
Location Alias: 00/05-05-62-26 W5M
Location Alias 2: 00/05-05-062-26 W5/00
Country: Canada
Province: Alberta
Township: 062
Meridian: 5
Range: 26
Section: 05
County/Municipality: Municipal District of Greenview No. 16
Well Name: CEQUENCE 1-32 HZ SIMON 5-5-62-26
Operator Name: Cequence Energy Ltd.
License Number: 0467751
License Date: 2014-07-02
License Status: Issued
Spud Date: 2014-11-17
Final Drill Date: 2014-12-11
Well Total Depth: 5250.00 m
Surface Hole Latitude: 54.313940
Surface Hole Longitude: -117.856014

For data sources see[1][2]

Well History

Date Event
2014-07-02 Obtained License
2014-11-20 Surface Casing Operation Performed
2014-11-23 Direction Drilling Operation Performed - Deviate
2014-11-30 Direction Drilling Operation Performed - Horizontal
2014-12-01 Intermediate Casing Operation Performed
2014-12-10 Well Log Performed
2014-12-11 Finished Drilling
2014-12-11 Well Mode changed to Drilled and Cased
2014-12-13 Liner Casing Operation Performed
2014-12-14 Rig Released
2014-12-17 Perforation Treatment Performed - Open-Hole Completion
2014-12-31 Perforation Treatment Performed - Multi-Stage Fracture
2015-01-01 Perforation Treatment Performed - Multi-Stage Fracture
2015-01-15 Well Began Production
2015-01-15 Well Fluid changed to Gas
2015-01-15 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2014-11-17 Canelson Drilling Inc. 38 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2014-11-23 1976.90 Deviate (5 - 79 degrees)
2014-11-30 3148.70 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2014-12-17 Open Hole/Barefoot Completion 5245.00 5250.00 0
2014-12-31 Multi-Stage Fracture 4633.70 4633.80 0
2014-12-31 Multi-Stage Fracture 4560.90 4561.00 0
2014-12-31 Multi-Stage Fracture 4488.60 4488.70 0
2014-12-31 Multi-Stage Fracture 4417.60 4417.70 0
2014-12-31 Multi-Stage Fracture 4345.10 4345.20 0
2014-12-31 Multi-Stage Fracture 4258.90 4259.00 0
2014-12-31 Multi-Stage Fracture 4173.90 4174.00 0
2014-12-31 Multi-Stage Fracture 4088.40 4088.50 0
2014-12-31 Multi-Stage Fracture 4004.50 4004.60 0
2014-12-31 Multi-Stage Fracture 3923.40 3923.50 0
2014-12-31 Multi-Stage Fracture 5208.90 5209.00 0
2014-12-31 Multi-Stage Fracture 3838.40 3838.50 0
2014-12-31 Multi-Stage Fracture 3752.60 3752.70 0
2014-12-31 Multi-Stage Fracture 3667.30 3667.40 0
2014-12-31 Multi-Stage Fracture 3584.70 3584.80 0
2014-12-31 Multi-Stage Fracture 3500.80 3500.90 0
2014-12-31 Multi-Stage Fracture 3416.70 3416.80 0
2015-01-01 Multi-Stage Fracture 3330.60 3330.70 0
2015-01-01 Multi-Stage Fracture 3248.90 3249.00 0
2014-12-31 Multi-Stage Fracture 5137.80 5137.90 0
2014-12-31 Multi-Stage Fracture 5065.90 5066.00 0
2014-12-31 Multi-Stage Fracture 4993.30 4993.40 0
2014-12-31 Multi-Stage Fracture 4922.40 4922.50 0
2014-12-31 Multi-Stage Fracture 4850.90 4851.00 0
2014-12-31 Multi-Stage Fracture 4778.60 4778.70 0
2014-12-31 Multi-Stage Fracture 4705.70 4705.80 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2014-12-31 2015-01-01 2,906 7,985 N/A
2 2015-01-01 2015-01-01 2,906 0 N/A
3 2014-12-31 2014-12-31 2,906 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 77.4588 N/A
40/70 Sand Calfrac Crystalline silica (Quartz) 14808-60-7 100 15.1581 N/A
50/140 Sand Calfrac Crystalline silica (Quartz) 14808-60-7 100 2.532 N/A
DWP-962 Calfrac Bactericide/Biocide Phosphonium. tetrakis(hydroxymethyl)-. sulfate (2:1) (THPS) 55566-30-8 100 0.0113 N/A
Water 7732-18-5 100 0.0115 N/A
DWP-913 Calfrac Clay Control Non-Hazardous Ingredients Trade Secret 100 0.0686 N/A
DWP-937 Calfrac Demulsifier Citrus terpenes 94266-47-4 100 0.0751 N/A
Isopropanol 67-63-0 100 0.0754 N/A
Non-Hazardous Ingredients Trade Secret 100 0.0751 N/A
Triethylene glycol 112-27-6 100 0.0754 N/A
Water 7732-18-5 100 0.0752 N/A
Nitrogen Calfrac Energizing Fluid Nitrogen 7727-37-9 100 2.5091 N/A
DWP-621 Calfrac Friction Reducer Non-Hazardous Ingredients Trade Secret 100 0.0816 N/A
2 20/40 SB Excel Calfrac Quartz 14808-60-7 100 2.3978 N/A
3 30/50 Prime Plus Calfrac Quartz 14808-60-7 100 2.5432 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2014-12-21 2014-12-27 Oilfield Produced Water 120
2014-07-13 2014-09-04 Oilfield Produced Water 70
2014-08-30 2014-12-03 Recycled Fracturing Water (treated at well site) 349
2014-12-23 2014-12-31 Recycled Fracturing Water (treated at well site) 79
2014-07-02 2014-08-31 Recycled Fracturing Water (treated at well site) 152
2014-07-31 2014-12-25 Recycled Fracturing Water (treated at well site) 118
2014-12-20 2014-12-31 Recycled Fracturing Water (treated at well site) 772
2014-11-20 2014-12-23 Recycled Fracturing Water (treated at well site) 190
2014-11-20 2014-12-31 Recycled Fracturing Water (treated at well site) 200
2014-08-29 2014-12-20 Recycled Fracturing Water (treated at well site) 39
2014-08-19 2014-08-19 Recycled Fracturing Water (treated at well site) 42
2014-12-24 2014-12-24 Recycled Fracturing Water (treated at well site) 6
2014-12-31 2014-12-31 Recycled Fracturing Water (treated at well site) 160
2014-12-31 2014-12-31 Recycled Fracturing Water (treated at well site) 753
2014-12-31 2014-12-31 Recycled Fracturing Water (treated at well site) 2113
2014-12-31 2014-12-31 Recycled Fracturing Water (treated at well site) 70
2014-12-31 2014-12-31 Recycled Fracturing Water (treated at well site) 65
2014-08-29 2014-08-29 Recycled Fracturing Water (treated at well site) 677
2014-12-26 2014-12-31 Recycled Fracturing Water (treated at well site) 180
2014-12-19 2014-12-19 Recycled Fracturing Water (treated at well site) 1993

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2015 7960 0.0 0.0 0.0
2016 8724 0.0 0.0 0.0
2017 8136 0.0 0.0 0.0
2018 8584 0.0 0.0 0.0
2019 8615 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-12-14 No Incident Encountered 0.00 0.00
2015-01-14 No Incident Encountered 0.00 0.00

For data sources see[10]

References