X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0625242616000

Well Details

Well ID: 0625242616000
Loading map...
Location: 00/16-26-062-24W5/0
Location Alias: 00/16-26-62-24 W5M
Location Alias 2: 00/16-26-062-24 W5/00
Country: Canada
Province: Alberta
Township: 062
Meridian: 5
Range: 24
Section: 26
County/Municipality: Municipal District of Greenview No. 16
Well Name: CHEVRON HZ WAHIGAN 16-26-62-24
Operator Name: Chevron Canada Limited
License Number: 0485218
License Date: 2017-08-30
License Status: Amended
Spud Date: 2018-01-07
Final Drill Date: 2018-03-24
Well Total Depth: 6485.00 m
Surface Hole Latitude: 54.375071
Surface Hole Longitude: -117.488760

For data sources see[1][2]

Well History

Date Event
2017-08-30 Obtained License
2018-01-07 Direction Drilling Operation Performed - Deviate
2018-01-07 Surface Casing Operation Performed
2018-02-11 Intermediate Casing Operation Performed
2018-03-18 Direction Drilling Operation Performed - Horizontal
2018-03-24 Finished Drilling
2018-03-24 Well Log Performed
2018-03-24 Well Mode changed to Drilled and Cased
2018-03-25 Well Log Performed
2018-03-26 Production Casing Operation Performed
2018-03-27 Rig Released
2018-08-21 Perforation Treatment Performed - Jet Perforation
2018-08-29 Perforation Treatment Performed - Multi-Stage Fracture
2018-08-30 Perforation Treatment Performed - Jet Perforation
2018-08-31 Perforation Treatment Performed - Jet Perforation
2018-08-31 Perforation Treatment Performed - Multi-Stage Fracture
2018-09-01 Perforation Treatment Performed - Jet Perforation
2018-09-05 Perforation Treatment Performed - Jet Perforation
2018-09-05 Perforation Treatment Performed - Multi-Stage Fracture
2018-09-08 Perforation Treatment Performed - Jet Perforation
2018-09-08 Perforation Treatment Performed - Multi-Stage Fracture
2018-09-09 Perforation Treatment Performed - Jet Perforation
2018-09-09 Perforation Treatment Performed - Multi-Stage Fracture
2018-09-11 Perforation Treatment Performed - Jet Perforation
2018-09-11 Perforation Treatment Performed - Multi-Stage Fracture
2018-09-13 Perforation Treatment Performed - Jet Perforation
2018-09-13 Perforation Treatment Performed - Multi-Stage Fracture
2018-09-14 Perforation Treatment Performed - Jet Perforation
2018-09-14 Perforation Treatment Performed - Multi-Stage Fracture
2018-09-16 Perforation Treatment Performed - Jet Perforation
2018-09-16 Perforation Treatment Performed - Multi-Stage Fracture
2018-09-17 Perforation Treatment Performed - Jet Perforation
2018-09-17 Perforation Treatment Performed - Multi-Stage Fracture
2018-09-19 Perforation Treatment Performed - Jet Perforation
2018-09-19 Perforation Treatment Performed - Multi-Stage Fracture
2018-09-20 Perforation Treatment Performed - Multi-Stage Fracture
2018-09-21 Perforation Treatment Performed - Jet Perforation
2018-09-22 Perforation Treatment Performed - Jet Perforation
2018-09-22 Perforation Treatment Performed - Multi-Stage Fracture
2018-09-24 Perforation Treatment Performed - Jet Perforation
2018-09-24 Perforation Treatment Performed - Multi-Stage Fracture
2018-09-27 Perforation Treatment Performed - Multi-Stage Fracture
2018-09-28 Perforation Treatment Performed - Jet Perforation
2018-09-28 Perforation Treatment Performed - Multi-Stage Fracture
2018-10-01 Perforation Treatment Performed - Jet Perforation
2018-10-01 Perforation Treatment Performed - Multi-Stage Fracture
2018-10-02 Perforation Treatment Performed - Jet Perforation
2018-10-02 Perforation Treatment Performed - Multi-Stage Fracture
2018-10-03 Perforation Treatment Performed - Jet Perforation
2018-10-03 Perforation Treatment Performed - Multi-Stage Fracture
2018-10-04 Perforation Treatment Performed - Jet Perforation
2018-10-04 Perforation Treatment Performed - Multi-Stage Fracture
2018-10-05 Perforation Treatment Performed - Jet Perforation
2018-10-05 Perforation Treatment Performed - Multi-Stage Fracture
2018-10-06 Perforation Treatment Performed - Jet Perforation
2018-10-06 Perforation Treatment Performed - Multi-Stage Fracture
2018-10-07 Perforation Treatment Performed - Jet Perforation
2018-10-07 Perforation Treatment Performed - Multi-Stage Fracture
2018-11-29 Well Began Production
2018-11-29 Well Fluid changed to Shale Gas Only
2018-11-29 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2018-02-05 Ensign Drilling Inc. 785 N/A Drill To LD
2018-01-07 Ensign Drilling Inc. 785 N/A Set Surface
2018-03-17 Ensign Drilling Inc. 785 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2018-01-07 181.40 Deviate (5 - 79 degrees)
2018-03-18 3875.30 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2018-08-21 Perforation 6438.00 6438.50 12
2018-08-30 Perforation 6319.30 6319.80 10
2018-09-22 Perforation 5176.60 5177.10 14
2018-09-22 Perforation 5161.80 5162.30 12
2018-09-22 Perforation 5146.90 5147.40 10
2018-09-22 Perforation 5132.10 5132.60 8
2018-09-22 Perforation 5117.20 5117.70 8
2018-09-24 Multi-Stage Fracture 5117.20 5191.90 0
2018-09-24 Perforation 5102.40 5102.90 16
2018-09-24 Perforation 5087.60 5088.10 14
2018-09-24 Perforation 5072.70 5073.20 12
2018-09-24 Perforation 5057.90 5058.40 10
2018-08-30 Perforation 6304.00 6304.50 10
2018-09-24 Perforation 5043.00 5043.50 8
2018-09-24 Perforation 5028.20 5028.70 8
2018-09-27 Multi-Stage Fracture 5028.20 5102.90 0
2018-09-28 Perforation 5013.40 5013.90 16
2018-09-28 Perforation 4998.50 4999.00 14
2018-09-28 Perforation 4983.70 4984.20 12
2018-09-28 Perforation 4968.80 4969.30 10
2018-09-28 Perforation 4954.00 4954.50 8
2018-09-28 Perforation 4939.20 4939.70 8
2018-09-28 Multi-Stage Fracture 4939.20 5013.90 0
2018-08-30 Perforation 6289.60 6290.10 10
2018-09-28 Perforation 4924.30 4924.80 16
2018-09-28 Perforation 4909.50 4910.00 14
2018-09-28 Perforation 4894.60 4895.10 12
2018-09-28 Perforation 4879.80 4880.30 10
2018-09-28 Perforation 4865.00 4865.50 8
2018-09-28 Perforation 4850.10 4850.60 8
2018-10-01 Multi-Stage Fracture 4850.10 4924.80 0
2018-10-01 Perforation 4835.30 4835.80 16
2018-10-01 Perforation 4820.40 4820.90 14
2018-10-01 Perforation 4805.60 4806.10 12
2018-08-30 Perforation 6274.80 6275.30 10
2018-10-01 Perforation 4790.80 4791.30 10
2018-10-01 Perforation 4775.90 4776.40 8
2018-10-01 Perforation 4761.10 4761.60 8
2018-10-01 Multi-Stage Fracture 4761.10 4835.80 0
2018-10-02 Perforation 4657.20 4657.70 16
2018-10-02 Multi-Stage Fracture 4672.00 4746.70 0
2018-10-02 Perforation 4642.40 4642.90 14
2018-10-02 Perforation 4627.50 4628.00 12
2018-10-02 Perforation 4612.70 4613.20 10
2018-10-02 Perforation 4597.80 4598.30 8
2018-08-31 Multi-Stage Fracture 6274.80 6349.50 0
2018-10-02 Perforation 4583.00 4583.50 8
2018-10-02 Perforation 4746.20 4746.70 16
2018-10-02 Perforation 4731.40 4731.90 14
2018-10-02 Perforation 4716.60 4717.10 12
2018-10-02 Perforation 4701.70 4702.20 10
2018-10-02 Perforation 4686.90 4687.40 8
2018-10-02 Perforation 4672.00 4672.50 8
2018-10-02 Multi-Stage Fracture 4583.00 4657.70 0
2018-10-03 Perforation 4568.20 4568.70 16
2018-10-03 Perforation 4553.30 4553.80 14
2018-08-31 Perforation 6259.90 6260.40 12
2018-10-03 Perforation 4538.50 4539.00 12
2018-10-03 Perforation 4523.60 4524.10 10
2018-10-03 Perforation 4508.80 4509.30 8
2018-10-03 Perforation 4494.00 4494.50 8
2018-10-03 Multi-Stage Fracture 4494.00 4568.70 0
2018-10-04 Perforation 4390.10 4390.60 16
2018-10-04 Perforation 4375.20 4375.70 14
2018-10-04 Perforation 4360.40 4360.90 12
2018-10-04 Perforation 4345.60 4346.10 10
2018-10-04 Perforation 4330.70 4331.20 8
2018-08-31 Perforation 6245.10 6245.60 12
2018-10-04 Perforation 4315.90 4316.40 8
2018-10-04 Perforation 4479.10 4479.60 16
2018-10-04 Perforation 4464.30 4464.80 14
2018-10-04 Perforation 4449.40 4449.90 12
2018-10-04 Perforation 4434.60 4435.10 10
2018-10-04 Perforation 4419.80 4420.30 8
2018-10-04 Perforation 4404.90 4405.40 8
2018-10-04 Multi-Stage Fracture 4404.90 4479.60 0
2018-10-05 Perforation 4301.00 4301.50 16
2018-10-05 Multi-Stage Fracture 4315.90 4390.60 0
2018-08-31 Perforation 6230.20 6230.70 12
2018-10-05 Perforation 4286.20 4286.70 14
2018-10-05 Perforation 4271.40 4271.90 12
2018-10-05 Perforation 4256.50 4257.00 10
2018-10-05 Perforation 4241.70 4242.20 8
2018-10-05 Perforation 4226.80 4227.30 8
2018-10-05 Multi-Stage Fracture 4226.80 4301.50 0
2018-10-05 Perforation 4212.00 4212.50 16
2018-10-05 Perforation 4197.20 4197.70 14
2018-10-05 Perforation 4182.30 4182.80 12
2018-10-05 Perforation 4167.50 4168.00 10
2018-08-31 Perforation 6215.40 6215.90 10
2018-10-05 Perforation 4152.60 4153.10 8
2018-10-05 Perforation 4137.80 4138.30 8
2018-10-06 Multi-Stage Fracture 4137.80 4212.50 0
2018-10-06 Perforation 4123.00 4123.50 16
2018-10-06 Perforation 4108.10 4108.60 14
2018-10-06 Perforation 4093.30 4093.80 12
2018-10-06 Perforation 4078.40 4078.90 10
2018-10-06 Perforation 4063.60 4064.10 8
2018-10-06 Perforation 4048.80 4049.30 8
2018-10-06 Multi-Stage Fracture 4048.80 4123.50 0
2018-08-31 Perforation 6200.60 6201.10 10
2018-10-06 Perforation 4033.90 4034.40 16
2018-10-06 Perforation 4019.10 4019.60 14
2018-10-06 Perforation 4004.20 4004.70 12
2018-10-06 Perforation 3989.40 3989.90 10
2018-10-06 Perforation 3974.60 3975.10 8
2018-10-06 Perforation 3959.20 3959.70 8
2018-10-07 Multi-Stage Fracture 3959.20 4034.40 0
2018-10-07 Perforation 3944.90 3945.40 16
2018-10-07 Perforation 3930.00 3930.50 14
2018-10-07 Perforation 3915.20 3915.70 12
2018-08-21 Perforation 6423.20 6423.70 12
2018-08-31 Perforation 6185.70 6186.20 10
2018-10-07 Perforation 3900.40 3900.90 10
2018-10-07 Perforation 3885.50 3886.00 8
2018-10-07 Perforation 3870.70 3871.20 8
2018-10-07 Multi-Stage Fracture 3870.70 3945.40 0
2018-08-31 Multi-Stage Fracture 6185.70 6260.40 0
2018-09-01 Perforation 6170.90 6171.40 12
2018-09-01 Perforation 6156.00 6156.50 10
2018-09-01 Perforation 6141.20 6141.70 10
2018-09-01 Perforation 6126.40 6126.90 8
2018-09-01 Perforation 6111.50 6112.00 8
2018-09-01 Perforation 6096.70 6097.20 8
2018-09-05 Multi-Stage Fracture 6096.70 6171.40 0
2018-09-05 Perforation 6081.80 6082.30 12
2018-08-21 Perforation 6408.30 6408.80 12
2018-09-05 Perforation 6067.00 6067.50 10
2018-09-05 Perforation 6052.20 6052.70 10
2018-09-05 Perforation 6037.30 6037.80 4
2018-09-05 Perforation 6022.50 6023.00 4
2018-09-05 Perforation 6007.60 6008.10 4
2018-09-08 Multi-Stage Fracture 6007.60 6082.30 0
2018-09-08 Perforation 5992.80 5993.30 16
2018-09-08 Perforation 5978.00 5978.50 14
2018-09-08 Perforation 5963.10 5963.60 12
2018-09-08 Perforation 5948.30 5948.80 10
2018-08-21 Perforation 6393.50 6394.00 12
2018-09-08 Perforation 5933.40 5933.90 8
2018-09-08 Perforation 5918.60 5919.10 8
2018-09-09 Multi-Stage Fracture 5918.60 5993.30 0
2018-09-09 Perforation 5903.80 5904.30 16
2018-09-09 Perforation 5888.90 5889.40 14
2018-09-09 Perforation 5874.10 5874.60 12
2018-09-09 Perforation 5859.20 5859.70 10
2018-09-09 Perforation 5844.40 5844.90 8
2018-09-09 Perforation 5829.60 5830.10 8
2018-09-11 Multi-Stage Fracture 5829.60 5904.30 0
2018-08-21 Perforation 6378.60 6379.10 12
2018-09-11 Perforation 5814.70 5815.20 16
2018-09-11 Perforation 5799.90 5800.40 14
2018-09-11 Perforation 5785.00 5785.50 12
2018-09-11 Perforation 5770.20 5770.70 10
2018-09-11 Perforation 5755.40 5755.90 8
2018-09-11 Perforation 5740.50 5741.00 8
2018-09-13 Multi-Stage Fracture 5740.50 5815.20 0
2018-09-13 Perforation 5725.70 5726.20 16
2018-09-13 Perforation 5710.80 5711.30 14
2018-09-13 Perforation 5696.00 5696.50 12
2018-08-21 Perforation 6363.80 6364.30 12
2018-09-13 Perforation 5681.20 5681.70 10
2018-09-13 Perforation 5666.30 5666.80 8
2018-09-13 Perforation 5651.50 5652.00 8
2018-09-14 Multi-Stage Fracture 5651.50 5726.20 0
2018-09-14 Perforation 5636.60 5637.10 16
2018-09-14 Perforation 5621.80 5622.30 14
2018-09-14 Perforation 5607.00 5607.50 12
2018-09-14 Perforation 5592.10 5592.60 10
2018-09-14 Perforation 5577.30 5577.80 8
2018-09-14 Perforation 5562.40 5562.90 8
2018-08-29 Multi-Stage Fracture 6363.80 6438.50 0
2018-09-16 Multi-Stage Fracture 5562.40 5637.10 0
2018-09-16 Perforation 5547.60 5548.10 16
2018-09-16 Perforation 5532.80 5533.30 14
2018-09-16 Perforation 5517.90 5518.40 12
2018-09-16 Perforation 5503.10 5503.60 10
2018-09-16 Perforation 5488.20 5488.70 8
2018-09-16 Perforation 5473.40 5473.90 8
2018-09-17 Multi-Stage Fracture 5473.40 5548.10 0
2018-09-17 Perforation 5458.60 5459.10 16
2018-09-17 Perforation 5443.70 5444.20 14
2018-08-30 Perforation 6349.00 6349.50 10
2018-09-17 Perforation 5428.90 5429.40 12
2018-09-17 Perforation 5414.00 5414.50 10
2018-09-17 Perforation 5399.20 5399.70 8
2018-09-17 Perforation 5384.40 5384.90 8
2018-09-19 Multi-Stage Fracture 5384.40 5459.10 0
2018-09-19 Perforation 5369.50 5370.00 16
2018-09-19 Perforation 5354.70 5355.20 14
2018-09-19 Perforation 5339.80 5340.30 12
2018-09-19 Perforation 5325.00 5325.50 10
2018-09-19 Perforation 5310.20 5310.70 8
2018-08-30 Perforation 6334.10 6334.60 10
2018-09-19 Perforation 5295.30 5295.80 8
2018-09-20 Multi-Stage Fracture 5295.30 5370.00 0
2018-09-21 Perforation 5280.50 5281.00 16
2018-09-21 Perforation 5265.60 5266.10 14
2018-09-21 Perforation 5250.80 5251.30 12
2018-09-21 Perforation 5236.00 5236.50 10
2018-09-21 Perforation 5221.10 5221.60 8
2018-09-21 Perforation 5206.30 5206.80 8
2018-09-22 Multi-Stage Fracture 5206.30 5281.00 0
2018-09-22 Perforation 5191.40 5191.90 16

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-08-29 2018-10-07 3,683 80,182 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water 7732-18-5 100 89.1345 N/A
FRAC SAND. 40/70 WHITE BJ Services Crystalline Silica (Quartz) 14808-60-7 100 8.6136 N/A
FRAC SAND. 50/140 CANADIAN BJ Services Crystalline Silica (Quartz) 14808-60-7 100 1.6324 N/A
Hydrochloric Acid 15% BJ Services Acid Hydrochloric acid 7647-01-0 100 0.3375 N/A
Water 7732-18-5 100 0.3375 N/A
Alpha 544 BJ Services Bactericide/Biocide 2.2-Dibromo-3-nitrilopropionamide 10222-01-2 100 0.009 N/A
Dibromoacetonitrile 3252-43-5 100 0.009 N/A
Polyethylene Glycol 25322-68-3 100 0.009 N/A
Sodium Bromide 7647-15-6 100 0.009 N/A
Water 7732-18-5 100 0.009 N/A
GBW-41LW BJ Services Breaker Hydrogen Peroxide 7722-84-1 100 0.0265 N/A
Methanol 67-56-1 100 0.0265 N/A
Non-hazardous Not Available 100 0.0265 N/A
High Perm EP BJ Services Breaker Ammonium persulphate 7727-54-0 100 0.0009 N/A
BF-9L BJ Services Buffer potassium carbonate 584-08-7 100 0.0501 N/A
Potassium hydroxide 1310-58-3 100 0.0501 N/A
Water 7732-18-5 100 0.0501 N/A
CI-27 BJ Services Corrosion Inhibitor Fatty acids 61790-12-3 100 0.0017 N/A
Methanol 67-56-1 100 0.0017 N/A
Modified thiourea polymer 68527-49-1 100 0.0017 N/A
Olefin 64743-02-8 100 0.0017 N/A
Polyoxyalkylenes 68951-67-7 100 0.0017 N/A
Propargyl alcohol 107-19-7 100 0.0017 N/A
XLW-30SR BJ Services Crosslinker Acrylic Polymer 97953-25-8 100 0.0388 N/A
Ethylene glycol 107-21-1 100 0.0388 N/A
Inorganic Borates 1319-33-1 100 0.0388 N/A
Polysaccharide 11138-66-2 100 0.0388 N/A
Water 7732-18-5 100 0.0388 N/A
FP-12L BJ Services Defoamer Methylcellulose 9004-67-5 100 0 N/A
Non-hazardous Not Available 100 0 N/A
Octamethylcyclotetrasiloxane 556-67-2 100 0.0001 N/A
Polydimethylsiloxane 63148-62-9 100 0 N/A
Water 7732-18-5 100 0 N/A
D-3 BJ Services Demulsifier Ethoxylated alcohol. branched 78330-19-5 100 0.0015 N/A
Isopropanol 67-63-0 100 0.0015 N/A
Methanol 67-56-1 100 0.0015 N/A
XFrac-09 BJ Services Friction Reducer 1.2 Propanediol carbonate 108-32-7 100 0.1263 N/A
Distillates (petroleum) hydrotreated light paraffinic 64742-55-8 100 0.1263 N/A
Lecitihins. soya 8030-76-0 100 0.1263 N/A
polymer Trade Secret 100 0.1263 N/A
Water 7732-18-5 100 0.1263 N/A
GW-3 BJ Services Gelling Agent Guar Gum 9000-30-0 100 0.0361 N/A
Ferrotrol 800 BJ Services Iron Control Trisodium nitrilotriacetate monohydrate 18662-53-8 100 0.0031 N/A
ScaleTrol 14 BJ Services Scale Inhibitor Phosphinocarboxylic acid copolymer 110224-99-2 100 0.023 N/A
Water 7732-18-5 100 0.023 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2018-08-16 2018-10-12 Surface Water - Runoff 79208

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2018 447 0.0 0.0 0.0
2019 8319 0.0 0.0 0.0
2020 2138 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-03-24 No Incident Encountered 0.00 0.00
2018-10-28 No Incident Encountered 0.00 0.00

For data sources see[10]

References