X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0625242614020

Well Details

Well ID: 0625242614020
Loading map...
Location: 02/14-26-062-24W5/0
Location Alias: 02/14-26-62-24 W5M
Location Alias 2: 02/14-26-062-24 W5/00
Country: Canada
Province: Alberta
Township: 062
Meridian: 5
Range: 24
Section: 26
County/Municipality: Municipal District of Greenview No. 16
Well Name: CHEVRON 102 HZ WAHIGAN 14-26-62-24
Operator Name: Chevron Canada Limited
License Number: 0485217
License Date: 2017-08-30
License Status: Amended
Spud Date: 2018-01-09
Final Drill Date: 2018-04-27
Well Total Depth: 6488.00 m
Surface Hole Latitude: 54.375269
Surface Hole Longitude: -117.488772

For data sources see[1][2]

Well History

Date Event
2017-08-30 Obtained License
2018-01-09 Direction Drilling Operation Performed - Deviate
2018-01-09 Surface Casing Operation Performed
2018-01-19 Intermediate Casing Operation Performed
2018-04-21 Direction Drilling Operation Performed - Horizontal
2018-04-27 Finished Drilling
2018-04-27 Well Log Performed
2018-04-27 Well Mode changed to Drilled and Cased
2018-04-29 Well Log Performed
2018-04-30 Production Casing Operation Performed
2018-05-01 Rig Released
2018-08-18 Perforation Treatment Performed - Jet Perforation
2018-08-29 Perforation Treatment Performed - Jet Perforation
2018-08-29 Perforation Treatment Performed - Multi-Stage Fracture
2018-08-30 Perforation Treatment Performed - Multi-Stage Fracture
2018-08-31 Perforation Treatment Performed - Jet Perforation
2018-09-01 Perforation Treatment Performed - Jet Perforation
2018-09-01 Perforation Treatment Performed - Multi-Stage Fracture
2018-09-02 Perforation Treatment Performed - Jet Perforation
2018-09-02 Perforation Treatment Performed - Multi-Stage Fracture
2018-09-03 Perforation Treatment Performed - Jet Perforation
2018-09-03 Perforation Treatment Performed - Multi-Stage Fracture
2018-09-04 Perforation Treatment Performed - Jet Perforation
2018-09-04 Perforation Treatment Performed - Multi-Stage Fracture
2018-09-05 Perforation Treatment Performed - Jet Perforation
2018-09-05 Perforation Treatment Performed - Multi-Stage Fracture
2018-09-07 Perforation Treatment Performed - Jet Perforation
2018-09-07 Perforation Treatment Performed - Multi-Stage Fracture
2018-09-09 Perforation Treatment Performed - Jet Perforation
2018-09-09 Perforation Treatment Performed - Multi-Stage Fracture
2018-09-10 Perforation Treatment Performed - Jet Perforation
2018-09-10 Perforation Treatment Performed - Multi-Stage Fracture
2018-09-11 Perforation Treatment Performed - Multi-Stage Fracture
2018-09-12 Perforation Treatment Performed - Jet Perforation
2018-09-13 Perforation Treatment Performed - Jet Perforation
2018-09-13 Perforation Treatment Performed - Multi-Stage Fracture
2018-09-14 Perforation Treatment Performed - Jet Perforation
2018-09-14 Perforation Treatment Performed - Multi-Stage Fracture
2018-09-15 Perforation Treatment Performed - Jet Perforation
2018-09-15 Perforation Treatment Performed - Multi-Stage Fracture
2018-09-16 Perforation Treatment Performed - Jet Perforation
2018-09-16 Perforation Treatment Performed - Multi-Stage Fracture
2018-09-17 Perforation Treatment Performed - Jet Perforation
2018-09-17 Perforation Treatment Performed - Multi-Stage Fracture
2018-09-18 Perforation Treatment Performed - Jet Perforation
2018-09-18 Perforation Treatment Performed - Multi-Stage Fracture
2018-09-19 Perforation Treatment Performed - Jet Perforation
2018-09-19 Perforation Treatment Performed - Multi-Stage Fracture
2018-09-20 Perforation Treatment Performed - Jet Perforation
2018-09-20 Perforation Treatment Performed - Multi-Stage Fracture
2018-09-21 Perforation Treatment Performed - Jet Perforation
2018-09-21 Perforation Treatment Performed - Multi-Stage Fracture
2018-09-22 Perforation Treatment Performed - Jet Perforation
2018-09-23 Perforation Treatment Performed - Jet Perforation
2018-09-23 Perforation Treatment Performed - Multi-Stage Fracture
2018-09-24 Perforation Treatment Performed - Jet Perforation
2018-09-25 Perforation Treatment Performed - Jet Perforation
2018-09-25 Perforation Treatment Performed - Multi-Stage Fracture
2018-09-29 Perforation Treatment Performed - Jet Perforation
2018-09-29 Perforation Treatment Performed - Multi-Stage Fracture
2018-10-01 Perforation Treatment Performed - Multi-Stage Fracture
2018-10-02 Perforation Treatment Performed - Jet Perforation
2018-10-02 Perforation Treatment Performed - Multi-Stage Fracture
2018-10-03 Perforation Treatment Performed - Jet Perforation
2018-10-03 Perforation Treatment Performed - Multi-Stage Fracture
2018-10-04 Perforation Treatment Performed - Jet Perforation
2018-10-04 Perforation Treatment Performed - Multi-Stage Fracture
2018-10-06 Perforation Treatment Performed - Jet Perforation
2018-10-06 Perforation Treatment Performed - Multi-Stage Fracture
2018-10-07 Perforation Treatment Performed - Jet Perforation
2018-10-07 Perforation Treatment Performed - Multi-Stage Fracture
2018-10-08 Perforation Treatment Performed - Jet Perforation
2018-10-08 Perforation Treatment Performed - Multi-Stage Fracture
2018-10-09 Perforation Treatment Performed - Jet Perforation
2018-10-09 Perforation Treatment Performed - Multi-Stage Fracture
2018-10-10 Perforation Treatment Performed - Jet Perforation
2018-10-10 Perforation Treatment Performed - Multi-Stage Fracture
2018-10-11 Perforation Treatment Performed - Jet Perforation
2018-10-11 Perforation Treatment Performed - Multi-Stage Fracture
2018-10-12 Perforation Treatment Performed - Jet Perforation
2018-10-12 Perforation Treatment Performed - Multi-Stage Fracture
2018-11-17 Well Began Production
2018-11-17 Well Fluid changed to Shale Gas Only
2018-11-17 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2018-01-09 156.10 Deviate (5 - 79 degrees)
2018-04-21 3834.90 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2018-08-18 Perforation 6414.00 6414.50 12
2018-08-29 Perforation 6356.90 6357.40 10
2018-09-07 Perforation 5792.80 5793.30 10
2018-09-07 Perforation 5785.70 5786.20 10
2018-09-07 Perforation 5778.50 5779.00 8
2018-09-07 Perforation 5771.40 5771.90 8
2018-09-09 Multi-Stage Fracture 5771.40 5814.70 0
2018-09-09 Perforation 5764.30 5764.80 12
2018-09-09 Perforation 5757.10 5757.60 10
2018-09-09 Perforation 5750.00 5750.50 10
2018-09-09 Perforation 5742.80 5743.30 10
2018-09-09 Perforation 5735.70 5736.20 10
2018-08-29 Perforation 6349.70 6350.20 10
2018-09-09 Perforation 5728.60 5729.10 8
2018-09-09 Perforation 5721.40 5721.90 8
2018-09-10 Multi-Stage Fracture 5721.40 5764.80 0
2018-09-10 Perforation 5714.30 5714.80 12
2018-09-10 Perforation 5707.10 5707.60 10
2018-09-10 Perforation 5700.00 5700.50 10
2018-09-10 Perforation 5692.90 5693.40 10
2018-09-10 Perforation 5685.70 5686.20 10
2018-09-10 Perforation 5678.60 5679.10 8
2018-09-10 Perforation 5671.40 5671.90 8
2018-08-29 Perforation 6342.60 6343.10 10
2018-09-10 Multi-Stage Fracture 5671.40 5714.80 0
2018-09-10 Perforation 5664.30 5664.80 12
2018-09-10 Perforation 5657.20 5657.70 10
2018-09-10 Perforation 5650.00 5650.50 10
2018-09-10 Perforation 5642.90 5643.40 10
2018-09-10 Perforation 5635.70 5636.20 10
2018-09-10 Perforation 5628.60 5629.10 8
2018-09-10 Perforation 5621.50 5622.00 8
2018-09-11 Multi-Stage Fracture 5621.50 5664.80 0
2018-09-12 Perforation 5614.30 5614.80 12
2018-08-29 Perforation 6335.50 6336.00 8
2018-09-12 Perforation 5607.20 5607.70 10
2018-09-12 Perforation 5600.00 5600.50 10
2018-09-12 Perforation 5592.90 5593.40 10
2018-09-12 Perforation 5585.80 5586.30 10
2018-09-12 Perforation 5578.60 5579.10 8
2018-09-12 Perforation 5571.50 5572.00 8
2018-09-13 Multi-Stage Fracture 5571.50 5614.80 0
2018-09-13 Perforation 5564.30 5564.80 12
2018-09-13 Perforation 5557.20 5557.70 10
2018-09-13 Perforation 5550.10 5550.60 10
2018-08-29 Perforation 6328.30 6328.80 8
2018-09-13 Perforation 5542.90 5543.40 10
2018-09-13 Perforation 5535.80 5536.30 10
2018-09-13 Perforation 5528.60 5529.10 8
2018-09-13 Perforation 5521.50 5522.00 8
2018-09-14 Multi-Stage Fracture 5521.50 5564.80 0
2018-09-14 Perforation 5514.40 5514.90 12
2018-09-14 Perforation 5507.20 5507.70 10
2018-09-14 Perforation 5500.10 5500.60 10
2018-09-14 Perforation 5492.90 5493.40 10
2018-09-14 Perforation 5485.80 5486.30 10
2018-08-29 Perforation 6321.20 6321.70 8
2018-09-14 Perforation 5478.70 5479.20 8
2018-09-14 Perforation 5471.50 5472.00 8
2018-09-15 Multi-Stage Fracture 5471.50 5514.90 0
2018-09-15 Perforation 5464.00 5464.50 12
2018-09-15 Perforation 5457.00 5457.50 10
2018-09-15 Perforation 5450.00 5450.50 10
2018-09-15 Perforation 5443.00 5443.50 10
2018-09-15 Perforation 5436.00 5436.50 10
2018-09-15 Perforation 5429.00 5429.50 8
2018-09-15 Perforation 5422.00 5422.50 8
2018-08-30 Multi-Stage Fracture 6321.20 6364.50 0
2018-09-15 Multi-Stage Fracture 5422.00 5464.50 0
2018-09-15 Perforation 5414.40 5414.90 12
2018-09-15 Perforation 5407.30 5407.80 10
2018-09-15 Perforation 5400.10 5400.60 10
2018-09-15 Perforation 5393.00 5393.50 10
2018-09-15 Perforation 5385.80 5386.30 10
2018-09-15 Perforation 5378.70 5379.20 8
2018-09-15 Perforation 5371.60 5372.10 8
2018-09-16 Multi-Stage Fracture 5371.60 5414.90 0
2018-09-16 Perforation 5364.40 5364.90 12
2018-08-31 Perforation 6314.00 6314.50 10
2018-09-16 Perforation 5357.30 5357.80 10
2018-09-16 Perforation 5350.10 5350.60 10
2018-09-16 Perforation 5343.00 5343.50 10
2018-09-16 Perforation 5335.90 5336.40 10
2018-09-16 Perforation 5328.70 5329.20 8
2018-09-16 Perforation 5321.60 5322.10 8
2018-09-17 Multi-Stage Fracture 5321.60 5364.90 0
2018-09-17 Perforation 5314.40 5314.90 12
2018-09-17 Perforation 5307.30 5307.80 10
2018-09-17 Perforation 5300.20 5300.70 10
2018-08-31 Perforation 6306.90 6307.40 10
2018-09-17 Perforation 5293.00 5293.50 10
2018-09-17 Perforation 5285.90 5286.40 10
2018-09-17 Perforation 5278.70 5279.20 8
2018-09-17 Perforation 5271.60 5272.10 8
2018-09-18 Multi-Stage Fracture 5271.60 5314.90 0
2018-09-18 Perforation 5264.50 5265.00 12
2018-09-18 Perforation 5257.30 5257.80 10
2018-09-18 Perforation 5250.20 5250.70 10
2018-09-18 Perforation 5243.00 5243.50 10
2018-09-18 Perforation 5235.90 5236.40 10
2018-08-31 Perforation 6299.80 6300.30 10
2018-09-18 Perforation 5228.80 5229.30 8
2018-09-18 Perforation 5221.60 5222.10 8
2018-09-18 Multi-Stage Fracture 5221.60 5265.00 0
2018-09-18 Perforation 5214.50 5215.00 12
2018-09-18 Perforation 5207.30 5207.80 10
2018-09-18 Perforation 5200.20 5200.70 10
2018-09-18 Perforation 5193.10 5193.60 10
2018-09-18 Perforation 5185.90 5186.40 10
2018-09-18 Perforation 5178.80 5179.30 8
2018-09-18 Perforation 5171.60 5172.10 8
2018-08-18 Perforation 6406.90 6407.40 12
2018-08-31 Perforation 6292.60 6293.10 10
2018-09-19 Multi-Stage Fracture 5171.60 5215.00 0
2018-09-19 Perforation 5164.50 5165.00 12
2018-09-19 Perforation 5157.40 5157.90 10
2018-09-19 Perforation 5150.20 5150.70 10
2018-09-19 Perforation 5143.10 5143.60 10
2018-09-19 Perforation 5135.90 5136.40 10
2018-09-19 Perforation 5128.80 5129.30 8
2018-09-19 Perforation 5121.70 5122.20 8
2018-09-20 Multi-Stage Fracture 5121.70 5165.00 0
2018-09-20 Perforation 5114.40 5114.90 12
2018-08-31 Perforation 6285.50 6286.00 8
2018-09-20 Perforation 5107.40 5107.90 10
2018-09-20 Perforation 5100.20 5100.70 10
2018-09-20 Perforation 5093.10 5093.60 10
2018-09-20 Perforation 5086.00 5086.50 10
2018-09-20 Perforation 5078.80 5079.30 8
2018-09-20 Perforation 5071.70 5072.20 8
2018-09-21 Multi-Stage Fracture 5071.70 5114.90 0
2018-09-21 Perforation 5064.50 5065.00 12
2018-09-21 Perforation 5057.40 5057.90 10
2018-09-21 Perforation 5050.30 5050.80 10
2018-08-31 Perforation 6278.30 6278.80 8
2018-09-21 Perforation 5043.10 5043.60 10
2018-09-21 Perforation 5036.00 5036.50 10
2018-09-21 Perforation 5028.80 5029.30 8
2018-09-21 Perforation 5021.70 5022.20 8
2018-09-21 Multi-Stage Fracture 5021.70 5065.00 0
2018-09-22 Perforation 5014.60 5015.10 12
2018-09-22 Perforation 5007.40 5007.90 10
2018-09-22 Perforation 5000.30 5000.80 10
2018-09-22 Perforation 4993.10 4993.60 10
2018-09-22 Perforation 4986.00 4986.50 10
2018-08-31 Perforation 6271.20 6271.70 8
2018-09-22 Perforation 4978.90 4979.40 8
2018-09-22 Perforation 4971.70 4972.20 8
2018-09-23 Multi-Stage Fracture 4971.70 5015.10 0
2018-09-23 Perforation 4964.60 4965.10 12
2018-09-23 Perforation 4957.40 4957.90 10
2018-09-23 Perforation 4950.30 4950.80 10
2018-09-23 Perforation 4943.20 4943.70 10
2018-09-23 Perforation 4936.00 4936.50 10
2018-09-23 Perforation 4928.90 4929.40 8
2018-09-23 Perforation 4921.70 4922.20 8
2018-09-01 Multi-Stage Fracture 6271.20 6314.50 0
2018-09-23 Multi-Stage Fracture 4921.70 4965.10 0
2018-09-24 Perforation 4914.60 4915.10 12
2018-09-24 Perforation 4907.50 4908.00 10
2018-09-24 Perforation 4900.30 4900.80 10
2018-09-24 Perforation 4893.20 4893.70 10
2018-09-24 Perforation 4886.00 4886.50 10
2018-09-24 Perforation 4878.90 4879.40 8
2018-09-24 Perforation 4871.80 4872.30 8
2018-09-25 Multi-Stage Fracture 4871.80 4915.10 0
2018-09-25 Perforation 4864.60 4865.10 12
2018-09-01 Perforation 6264.10 6264.60 10
2018-09-25 Perforation 4857.50 4858.00 10
2018-09-25 Perforation 4850.30 4850.80 10
2018-09-25 Perforation 4843.20 4843.70 10
2018-09-25 Perforation 4836.10 4836.60 10
2018-09-25 Perforation 4828.90 4829.40 8
2018-09-25 Perforation 4821.80 4822.30 8
2018-09-29 Multi-Stage Fracture 4821.80 4865.10 0
2018-09-29 Perforation 4814.60 4815.10 12
2018-09-29 Perforation 4807.50 4808.00 10
2018-09-29 Perforation 4800.40 4800.90 10
2018-09-01 Perforation 6256.90 6257.40 8
2018-09-29 Perforation 4793.20 4793.70 10
2018-09-29 Perforation 4786.10 4786.60 10
2018-09-29 Perforation 4778.90 4779.40 8
2018-09-29 Perforation 4771.80 4772.30 8
2018-10-01 Multi-Stage Fracture 4771.80 4815.10 0
2018-10-02 Perforation 4764.70 4765.20 12
2018-10-02 Perforation 4757.50 4758.00 10
2018-10-02 Perforation 4750.40 4750.90 10
2018-10-02 Perforation 4743.20 4743.70 10
2018-10-02 Perforation 4736.10 4736.60 10
2018-09-01 Perforation 6249.80 6250.30 8
2018-10-02 Perforation 4729.00 4729.50 8
2018-10-02 Perforation 4721.80 4722.30 8
2018-10-02 Multi-Stage Fracture 4721.80 4765.20 0
2018-10-02 Perforation 4714.70 4715.20 12
2018-10-02 Perforation 4707.50 4708.00 10
2018-10-02 Perforation 4700.40 4700.90 10
2018-10-02 Perforation 4693.30 4693.80 10
2018-10-02 Perforation 4686.10 4686.60 10
2018-10-02 Perforation 4679.00 4679.50 8
2018-10-02 Perforation 4671.80 4672.30 8
2018-09-01 Perforation 6242.60 6243.10 8
2018-10-03 Multi-Stage Fracture 4671.80 4715.20 0
2018-10-03 Perforation 4664.70 4665.20 12
2018-10-03 Perforation 4657.60 4658.10 10
2018-10-03 Perforation 4650.40 4650.90 10
2018-10-03 Perforation 4643.30 4643.80 10
2018-10-03 Perforation 4636.10 4636.60 10
2018-10-03 Perforation 4629.00 4629.50 8
2018-10-03 Perforation 4621.90 4622.40 8
2018-10-04 Multi-Stage Fracture 4621.90 4665.20 0
2018-10-04 Perforation 4614.70 4615.20 12
2018-09-01 Perforation 6235.50 6236.00 8
2018-10-04 Perforation 4607.70 4608.20 10
2018-10-04 Perforation 4600.40 4600.90 10
2018-10-04 Perforation 4593.30 4593.80 10
2018-10-04 Perforation 4586.20 4586.70 10
2018-10-04 Perforation 4579.00 4579.50 8
2018-10-04 Perforation 4571.90 4572.40 8
2018-10-06 Perforation 4564.70 4565.20 12
2018-10-06 Perforation 4557.60 4558.10 10
2018-10-06 Perforation 4550.50 4551.00 10
2018-10-06 Perforation 4543.30 4543.80 10
2018-08-18 Perforation 6399.70 6400.20 12
2018-09-01 Perforation 6228.40 6228.90 8
2018-10-06 Perforation 4536.20 4536.70 10
2018-10-06 Perforation 4528.00 4528.50 8
2018-10-06 Perforation 4521.90 4522.40 8
2018-10-06 Multi-Stage Fracture 4571.90 4615.20 0
2018-10-07 Perforation 4514.80 4515.30 12
2018-10-07 Multi-Stage Fracture 4521.90 4565.20 0
2018-10-07 Perforation 4507.60 4508.10 10
2018-10-07 Perforation 4500.50 4501.00 10
2018-10-07 Perforation 4493.30 4493.80 10
2018-10-07 Perforation 4486.20 4486.70 10
2018-09-01 Perforation 6221.20 6221.70 6
2018-10-07 Perforation 4479.10 4479.60 8
2018-10-07 Perforation 4471.90 4472.40 8
2018-10-08 Multi-Stage Fracture 4471.90 4515.30 0
2018-10-08 Perforation 4464.80 4465.30 12
2018-10-08 Perforation 4457.60 4458.10 10
2018-10-08 Perforation 4450.50 4451.00 10
2018-10-08 Perforation 4443.40 4443.90 10
2018-10-08 Perforation 4436.20 4436.70 10
2018-10-08 Perforation 4429.10 4429.60 8
2018-10-08 Perforation 4421.90 4422.40 8
2018-09-01 Multi-Stage Fracture 6221.20 6264.60 0
2018-10-08 Multi-Stage Fracture 4421.90 4465.30 0
2018-10-08 Perforation 4414.80 4415.30 12
2018-10-08 Perforation 4407.70 4408.20 10
2018-10-08 Perforation 4400.50 4401.00 10
2018-10-08 Perforation 4393.40 4393.90 10
2018-10-08 Perforation 4386.20 4386.70 10
2018-10-08 Perforation 4379.10 4379.60 8
2018-10-08 Perforation 4372.00 4372.50 8
2018-10-08 Multi-Stage Fracture 4372.00 4415.30 0
2018-10-08 Perforation 4364.80 4365.30 12
2018-09-02 Perforation 6214.10 6214.60 10
2018-10-08 Perforation 4357.70 4358.20 10
2018-10-08 Perforation 4350.50 4351.00 10
2018-10-08 Perforation 4343.40 4343.90 10
2018-10-08 Perforation 4336.30 4336.80 10
2018-10-08 Perforation 4329.10 4329.60 8
2018-10-08 Perforation 4322.00 4322.50 8
2018-10-09 Multi-Stage Fracture 4322.00 4365.30 0
2018-10-09 Perforation 4314.80 4315.30 12
2018-10-09 Perforation 4307.70 4308.20 10
2018-10-09 Perforation 4300.60 4301.10 10
2018-09-02 Perforation 6206.90 6207.40 8
2018-10-09 Perforation 4293.40 4293.90 10
2018-10-09 Perforation 4286.30 4286.80 10
2018-10-09 Perforation 4279.10 4279.60 8
2018-10-09 Perforation 4272.00 4272.50 8
2018-10-09 Multi-Stage Fracture 4272.00 4315.30 0
2018-10-09 Perforation 4262.90 4263.40 12
2018-10-09 Perforation 4257.70 4258.20 10
2018-10-09 Perforation 4250.60 4251.10 10
2018-10-09 Perforation 4243.40 4243.90 10
2018-10-09 Perforation 4236.30 4236.80 10
2018-09-02 Perforation 6199.80 6200.30 8
2018-10-09 Perforation 4229.20 4229.70 8
2018-10-09 Perforation 4222.00 4222.50 8
2018-10-09 Multi-Stage Fracture 4222.00 4263.40 0
2018-10-09 Perforation 4214.90 4215.40 12
2018-10-09 Perforation 4207.70 4208.20 10
2018-10-09 Perforation 4200.60 4201.10 10
2018-10-09 Perforation 4193.50 4194.00 10
2018-10-09 Perforation 4186.30 4186.80 10
2018-10-09 Perforation 4179.20 4179.70 8
2018-10-09 Perforation 4171.50 4172.00 8
2018-09-02 Perforation 6192.70 6193.20 8
2018-10-10 Multi-Stage Fracture 4171.50 4215.40 0
2018-10-10 Perforation 4164.90 4165.40 12
2018-10-10 Perforation 4157.80 4158.30 10
2018-10-10 Perforation 4150.60 4151.10 10
2018-10-10 Perforation 4143.50 4144.00 10
2018-10-10 Perforation 4136.30 4136.80 10
2018-10-10 Perforation 4129.20 4129.70 8
2018-10-10 Perforation 4122.10 4122.60 8
2018-10-10 Multi-Stage Fracture 4122.10 4165.40 0
2018-10-10 Perforation 4114.90 4115.40 12
2018-09-02 Perforation 6185.50 6186.00 8
2018-10-10 Perforation 4107.80 4108.30 10
2018-10-10 Perforation 4100.60 4101.10 10
2018-10-10 Perforation 4093.50 4094.00 10
2018-10-10 Perforation 4086.40 4086.90 10
2018-10-10 Perforation 4079.20 4079.70 8
2018-10-10 Perforation 4072.10 4072.60 8
2018-10-11 Multi-Stage Fracture 4072.10 4115.40 0
2018-10-11 Perforation 4064.90 4065.40 12
2018-10-11 Perforation 4057.80 4058.30 10
2018-10-11 Perforation 4050.70 4051.20 10
2018-09-02 Perforation 6178.40 6178.90 8
2018-10-11 Perforation 4043.50 4044.00 10
2018-10-11 Perforation 4036.40 4036.90 10
2018-10-11 Perforation 4029.20 4029.70 10
2018-10-11 Perforation 4022.10 4022.60 10
2018-10-11 Multi-Stage Fracture 4022.10 4065.40 0
2018-10-11 Perforation 4015.00 4015.50 12
2018-10-11 Perforation 4007.80 4008.30 10
2018-10-11 Perforation 4000.70 4001.20 10
2018-10-11 Perforation 3993.50 3994.00 10
2018-10-11 Perforation 3986.40 3986.90 10
2018-09-02 Perforation 6171.20 6171.70 6
2018-10-11 Perforation 3979.30 3979.80 8
2018-10-11 Perforation 3972.10 3972.60 8
2018-10-11 Multi-Stage Fracture 3972.10 4015.50 0
2018-10-11 Perforation 3965.00 3965.50 8
2018-10-11 Perforation 3957.80 3958.30 8
2018-10-11 Perforation 3950.70 3951.20 10
2018-10-11 Perforation 3943.60 3944.10 10
2018-10-11 Perforation 3936.40 3936.90 10
2018-10-11 Perforation 3929.30 3929.80 10
2018-10-11 Perforation 3922.10 3922.60 12
2018-08-18 Perforation 6392.60 6393.10 12
2018-09-02 Multi-Stage Fracture 6171.20 6214.60 0
2018-10-11 Multi-Stage Fracture 3922.10 3965.50 0
2018-10-12 Perforation 3872.00 3872.50 12
2018-10-12 Perforation 3879.00 3879.50 10
2018-10-12 Perforation 3886.00 3886.50 10
2018-10-12 Perforation 3894.00 3894.50 10
2018-10-12 Perforation 3901.00 3901.50 10
2018-10-12 Perforation 3908.00 3908.50 8
2018-10-12 Perforation 3915.00 3915.50 8
2018-10-12 Multi-Stage Fracture 3872.00 3915.50 0
2018-09-03 Perforation 6164.10 6164.60 10
2018-09-03 Perforation 6157.00 6157.50 8
2018-09-03 Perforation 6149.80 6150.30 8
2018-09-03 Perforation 6142.70 6143.20 8
2018-09-03 Perforation 6135.50 6136.00 8
2018-09-03 Perforation 6128.40 6128.90 8
2018-09-03 Perforation 6121.30 6121.80 6
2018-09-03 Multi-Stage Fracture 6121.30 6164.60 0
2018-09-03 Perforation 6114.10 6114.60 10
2018-08-18 Perforation 6385.40 6385.90 12
2018-09-03 Perforation 6107.00 6107.50 8
2018-09-03 Perforation 6099.80 6100.30 8
2018-09-03 Perforation 6092.70 6093.20 8
2018-09-03 Perforation 6085.60 6086.10 8
2018-09-03 Perforation 6078.40 6078.90 4
2018-09-03 Perforation 6071.30 6071.80 6
2018-09-03 Multi-Stage Fracture 6071.30 6114.60 0
2018-09-04 Perforation 6064.10 6064.60 10
2018-09-04 Perforation 6057.00 6057.50 8
2018-09-04 Perforation 6049.90 6050.40 8
2018-08-18 Perforation 6378.30 6378.80 12
2018-09-04 Perforation 6042.70 6043.20 8
2018-09-04 Perforation 6035.60 6036.10 8
2018-09-04 Perforation 6028.40 6028.90 8
2018-09-04 Perforation 6021.30 6021.80 6
2018-09-04 Multi-Stage Fracture 6021.30 6064.60 0
2018-09-04 Perforation 6014.20 6014.70 10
2018-09-04 Multi-Stage Fracture 5971.30 6014.70 0
2018-09-04 Perforation 6007.00 6007.50 8
2018-09-04 Perforation 5999.90 6000.40 8
2018-09-04 Perforation 5992.70 5993.20 8
2018-08-18 Perforation 6371.20 6371.70 12
2018-09-04 Perforation 5985.60 5986.10 8
2018-09-04 Perforation 5978.50 5979.00 8
2018-09-04 Perforation 5971.30 5971.80 6
2018-09-05 Perforation 5964.20 5964.70 12
2018-09-05 Perforation 5957.00 5957.50 10
2018-09-05 Perforation 5949.90 5950.40 10
2018-09-05 Perforation 5942.80 5943.30 10
2018-09-05 Perforation 5935.60 5936.10 8
2018-09-05 Perforation 5928.50 5929.00 8
2018-09-05 Perforation 5921.30 5921.80 6
2018-08-29 Multi-Stage Fracture 6371.20 6414.50 0
2018-09-05 Multi-Stage Fracture 5921.30 5964.70 0
2018-09-07 Perforation 5914.20 5914.70 12
2018-09-07 Perforation 5907.10 5907.60 10
2018-09-07 Perforation 5899.90 5900.40 10
2018-09-07 Perforation 5892.80 5893.30 10
2018-09-07 Perforation 5885.60 5886.10 10
2018-09-07 Perforation 5878.50 5879.00 8
2018-09-07 Perforation 5871.40 5871.90 8
2018-09-07 Multi-Stage Fracture 5871.40 5914.70 0
2018-09-07 Perforation 5864.20 5864.70 12
2018-08-29 Perforation 6364.00 6364.50 10
2018-09-07 Perforation 5857.10 5857.60 10
2018-09-07 Perforation 5849.90 5850.40 10
2018-09-07 Perforation 5842.80 5843.30 10
2018-09-07 Perforation 5835.70 5836.20 10
2018-09-07 Perforation 5828.50 5829.00 8
2018-09-07 Perforation 5821.40 5821.90 8
2018-09-07 Multi-Stage Fracture 5821.40 5864.70 0
2018-09-07 Perforation 5814.20 5814.70 12
2018-09-07 Perforation 5807.10 5807.60 10
2018-09-07 Perforation 5800.00 5800.50 10

For data sources see[5]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-08-29 2018-10-12 3,692 77,745 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water 7732-18-5 100 89.0736 N/A
FRAC SAND. 40/70 WHITE BJ Services Crystalline Silica (Quartz) 14808-60-7 100 8.494 N/A
FRAC SAND. 50/140 CANADIAN BJ Services Crystalline Silica (Quartz) 14808-60-7 100 1.7582 N/A
Hydrochloric Acid 15% BJ Services Acid Hydrochloric acid 7647-01-0 100 0.3153 N/A
Water 7732-18-5 100 0.3153 N/A
Alpha 544 BJ Services Bactericide/Biocide 2.2-Dibromo-3-nitrilopropionamide 10222-01-2 100 0.0086 N/A
Dibromoacetonitrile 3252-43-5 100 0.0086 N/A
Polyethylene Glycol 25322-68-3 100 0.0086 N/A
Sodium Bromide 7647-15-6 100 0.0086 N/A
Water 7732-18-5 100 0.0086 N/A
GBW-41LW BJ Services Breaker Hydrogen Peroxide 7722-84-1 100 0.026 N/A
Methanol 67-56-1 100 0.026 N/A
Non-hazardous Not Available 100 0.026 N/A
High Perm EP BJ Services Breaker Ammonium persulphate 7727-54-0 100 0.0012 N/A
BF-9L BJ Services Buffer potassium carbonate 584-08-7 100 0.055 N/A
Potassium hydroxide 1310-58-3 100 0.055 N/A
Water 7732-18-5 100 0.055 N/A
CI-27 BJ Services Corrosion Inhibitor Fatty acids 61790-12-3 100 0.0016 N/A
Methanol 67-56-1 100 0.0016 N/A
Modified thiourea polymer 68527-49-1 100 0.0016 N/A
Olefin 64743-02-8 100 0.0016 N/A
Polyoxyalkylenes 68951-67-7 100 0.0016 N/A
Propargyl alcohol 107-19-7 100 0.0016 N/A
XLW-30SR BJ Services Crosslinker Acrylic Polymer 97953-25-8 100 0.0436 N/A
Ethylene glycol 107-21-1 100 0.0436 N/A
Inorganic Borates 1319-33-1 100 0.0436 N/A
Polysaccharide 11138-66-2 100 0.0435 N/A
Water 7732-18-5 100 0.0436 N/A
FP-12L BJ Services Defoamer Methylcellulose 9004-67-5 100 0 N/A
Non-hazardous Not Available 100 0 N/A
Octamethylcyclotetrasiloxane 556-67-2 100 0.0001 N/A
Polydimethylsiloxane 63148-62-9 100 0 N/A
Water 7732-18-5 100 0 N/A
D-3 BJ Services Demulsifier Ethoxylated alcohol. branched 78330-19-5 100 0.0014 N/A
Isopropanol 67-63-0 100 0.0014 N/A
Methanol 67-56-1 100 0.0014 N/A
XFrac-09 BJ Services Friction Reducer 1.2 Propanediol carbonate 108-32-7 100 0.1192 N/A
Distillates (petroleum) hydrotreated light paraffinic 64742-55-8 100 0.1192 N/A
Lecitihins. soya 8030-76-0 100 0.1192 N/A
polymer Trade Secret 100 0.1192 N/A
Water 7732-18-5 100 0.1192 N/A
GW-3 BJ Services Gelling Agent Guar Gum 9000-30-0 100 0.0408 N/A
Ferrotrol 800 BJ Services Iron Control Trisodium nitrilotriacetate monohydrate 18662-53-8 100 0.0029 N/A
ScaleTrol 14 BJ Services Scale Inhibitor Phosphinocarboxylic acid copolymer 110224-99-2 100 0.0221 N/A
Water 7732-18-5 100 0.0221 N/A

For data sources see[6]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2018-08-16 2018-10-12 Surface Water - Runoff 77279

For data sources see[7]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2018 469 0.0 0.0 0.0
2019 8303 0.0 0.0 0.0
2020 2149 0.0 0.0 0.0

For data sources see[8]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-04-27 No Incident Encountered 0.00 0.00
2018-10-28 No Incident Encountered 0.00 0.00

For data sources see[9]

References