X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0625242614000

Well Details

Well ID: 0625242614000
Loading map...
Location: 00/14-26-062-24W5/0
Location Alias: 00/14-26-62-24 W5M
Location Alias 2: 00/14-26-062-24 W5/00
Country: Canada
Province: Alberta
Township: 062
Meridian: 5
Range: 24
Section: 26
County/Municipality: Municipal District of Greenview No. 16
Well Name: CHEVRON HZ WAHIGAN 14-26-62-24
Operator Name: Chevron Canada Limited
License Number: 0476599
License Date: 2015-08-17
License Status: Amended
Spud Date: 2018-01-06
Final Drill Date: 2018-03-13
Well Total Depth: 6434.00 m
Surface Hole Latitude: 54.375006
Surface Hole Longitude: -117.488757

For data sources see[1][2]

Well History

Date Event
2015-08-17 Obtained License
2018-01-06 Surface Casing Operation Performed
2018-02-12 Direction Drilling Operation Performed - Deviate
2018-02-17 Intermediate Casing Operation Performed
2018-03-10 Direction Drilling Operation Performed - Horizontal
2018-03-13 Finished Drilling
2018-03-13 Well Mode changed to Drilled and Cased
2018-03-14 Well Log Performed
2018-03-16 Production Casing Operation Performed
2018-03-16 Rig Released
2018-08-28 Perforation Treatment Performed - Jet Perforation
2018-08-28 Perforation Treatment Performed - Multi-Stage Fracture
2018-08-29 Perforation Treatment Performed - Jet Perforation
2018-08-30 Perforation Treatment Performed - Multi-Stage Fracture
2018-08-31 Perforation Treatment Performed - Jet Perforation
2018-09-01 Perforation Treatment Performed - Multi-Stage Fracture
2018-09-02 Perforation Treatment Performed - Jet Perforation
2018-09-02 Perforation Treatment Performed - Multi-Stage Fracture
2018-09-03 Perforation Treatment Performed - Jet Perforation
2018-09-03 Perforation Treatment Performed - Multi-Stage Fracture
2018-09-04 Perforation Treatment Performed - Jet Perforation
2018-09-04 Perforation Treatment Performed - Multi-Stage Fracture
2018-09-05 Perforation Treatment Performed - Multi-Stage Fracture
2018-09-06 Perforation Treatment Performed - Jet Perforation
2018-09-06 Perforation Treatment Performed - Multi-Stage Fracture
2018-09-07 Perforation Treatment Performed - Jet Perforation
2018-09-07 Perforation Treatment Performed - Multi-Stage Fracture
2018-09-08 Perforation Treatment Performed - Jet Perforation
2018-09-09 Perforation Treatment Performed - Jet Perforation
2018-09-09 Perforation Treatment Performed - Multi-Stage Fracture
2018-09-10 Perforation Treatment Performed - Jet Perforation
2018-09-10 Perforation Treatment Performed - Multi-Stage Fracture
2018-09-11 Perforation Treatment Performed - Jet Perforation
2018-09-11 Perforation Treatment Performed - Multi-Stage Fracture
2018-09-12 Perforation Treatment Performed - Jet Perforation
2018-09-12 Perforation Treatment Performed - Multi-Stage Fracture
2018-09-13 Perforation Treatment Performed - Jet Perforation
2018-09-13 Perforation Treatment Performed - Multi-Stage Fracture
2018-09-14 Perforation Treatment Performed - Multi-Stage Fracture
2018-09-15 Perforation Treatment Performed - Jet Perforation
2018-09-15 Perforation Treatment Performed - Multi-Stage Fracture
2018-09-16 Perforation Treatment Performed - Jet Perforation
2018-09-16 Perforation Treatment Performed - Multi-Stage Fracture
2018-09-17 Perforation Treatment Performed - Jet Perforation
2018-09-17 Perforation Treatment Performed - Multi-Stage Fracture
2018-09-18 Perforation Treatment Performed - Jet Perforation
2018-09-18 Perforation Treatment Performed - Multi-Stage Fracture
2018-09-19 Perforation Treatment Performed - Jet Perforation
2018-09-19 Perforation Treatment Performed - Multi-Stage Fracture
2018-09-20 Perforation Treatment Performed - Jet Perforation
2018-09-20 Perforation Treatment Performed - Multi-Stage Fracture
2018-09-21 Perforation Treatment Performed - Jet Perforation
2018-09-21 Perforation Treatment Performed - Multi-Stage Fracture
2018-09-22 Perforation Treatment Performed - Jet Perforation
2018-09-22 Perforation Treatment Performed - Multi-Stage Fracture
2018-09-23 Perforation Treatment Performed - Jet Perforation
2018-09-23 Perforation Treatment Performed - Multi-Stage Fracture
2018-09-24 Perforation Treatment Performed - Jet Perforation
2018-09-24 Perforation Treatment Performed - Multi-Stage Fracture
2018-09-25 Perforation Treatment Performed - Jet Perforation
2018-09-25 Perforation Treatment Performed - Multi-Stage Fracture
2018-09-26 Perforation Treatment Performed - Jet Perforation
2018-09-26 Perforation Treatment Performed - Multi-Stage Fracture
2018-09-27 Perforation Treatment Performed - Jet Perforation
2018-09-27 Perforation Treatment Performed - Multi-Stage Fracture
2018-09-28 Perforation Treatment Performed - Jet Perforation
2018-09-28 Perforation Treatment Performed - Multi-Stage Fracture
2018-09-29 Perforation Treatment Performed - Jet Perforation
2018-09-29 Perforation Treatment Performed - Multi-Stage Fracture
2018-09-30 Perforation Treatment Performed - Jet Perforation
2018-09-30 Perforation Treatment Performed - Multi-Stage Fracture
2018-10-01 Perforation Treatment Performed - Jet Perforation
2018-10-01 Perforation Treatment Performed - Multi-Stage Fracture
2018-10-02 Perforation Treatment Performed - Jet Perforation
2018-10-02 Perforation Treatment Performed - Multi-Stage Fracture
2018-10-03 Perforation Treatment Performed - Jet Perforation
2018-10-03 Perforation Treatment Performed - Multi-Stage Fracture
2018-12-03 Well Began Production
2018-12-03 Well Fluid changed to Shale Gas Only
2018-12-03 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2018-01-06 Ensign Drilling Inc. 785 N/A Set Surface
2018-03-09 Ensign Drilling Inc. 785 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2018-02-12 637.10 Deviate (5 - 79 degrees)
2018-03-10 3816.20 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2018-08-28 Perforation 6375.00 6375.50 12
2018-08-29 Perforation 6318.10 6318.60 10
2018-09-08 Perforation 5756.40 5756.90 10
2018-09-08 Perforation 5749.30 5749.80 10
2018-09-08 Perforation 5742.20 5742.70 8
2018-09-08 Perforation 5735.10 5735.60 8
2018-09-09 Multi-Stage Fracture 5735.10 5778.30 0
2018-09-09 Perforation 5728.00 5728.50 12
2018-09-09 Perforation 5720.90 5721.40 10
2018-09-09 Perforation 5713.80 5714.30 10
2018-09-09 Perforation 5706.70 5707.20 10
2018-09-09 Perforation 5699.60 5700.10 10
2018-08-29 Perforation 6311.00 6311.50 10
2018-09-09 Perforation 5692.40 5692.90 8
2018-09-09 Perforation 5685.30 5685.80 8
2018-09-10 Multi-Stage Fracture 5685.30 5728.50 0
2018-09-10 Perforation 5678.20 5678.70 12
2018-09-10 Perforation 5671.10 5671.60 10
2018-09-10 Perforation 5664.00 5664.50 10
2018-09-10 Perforation 5656.90 5657.40 10
2018-09-10 Perforation 5649.80 5650.30 10
2018-09-10 Perforation 5642.70 5643.20 8
2018-09-10 Perforation 5635.60 5636.10 8
2018-08-29 Perforation 6303.90 6304.40 10
2018-09-10 Multi-Stage Fracture 5635.60 5678.70 0
2018-09-10 Perforation 5628.40 5628.90 12
2018-09-10 Perforation 5621.30 5621.80 10
2018-09-10 Perforation 5614.20 5614.70 10
2018-09-10 Perforation 5607.10 5607.60 10
2018-09-10 Perforation 5600.00 5600.50 10
2018-09-10 Perforation 5592.90 5593.40 8
2018-09-10 Perforation 5585.80 5586.30 8
2018-09-11 Multi-Stage Fracture 5585.80 5628.90 0
2018-09-11 Perforation 5578.70 5579.20 12
2018-08-29 Perforation 6296.80 6297.30 8
2018-09-11 Perforation 5571.60 5572.10 10
2018-09-11 Perforation 5564.50 5565.00 10
2018-09-11 Perforation 5557.30 5557.80 10
2018-09-11 Perforation 5550.20 5550.70 10
2018-09-11 Perforation 5543.10 5543.60 8
2018-09-11 Perforation 5536.00 5536.50 8
2018-09-12 Multi-Stage Fracture 5536.00 5579.20 0
2018-09-12 Perforation 5528.90 5529.40 12
2018-09-12 Perforation 5521.80 5522.30 10
2018-09-12 Perforation 5514.70 5515.20 10
2018-08-29 Perforation 6289.70 6290.20 8
2018-09-12 Perforation 5507.60 5508.10 10
2018-09-12 Perforation 5500.50 5501.00 10
2018-09-12 Perforation 5493.40 5493.90 8
2018-09-12 Perforation 5486.20 5486.70 8
2018-09-13 Multi-Stage Fracture 5486.20 5529.40 0
2018-09-13 Perforation 5479.10 5479.60 12
2018-09-13 Perforation 5472.00 5472.50 10
2018-09-13 Perforation 5464.90 5465.40 10
2018-09-13 Perforation 5457.80 5458.30 10
2018-09-13 Perforation 5450.70 5451.20 10
2018-08-29 Perforation 6282.60 6283.10 8
2018-09-13 Perforation 5443.60 5444.10 8
2018-09-13 Perforation 5436.50 5437.00 8
2018-09-14 Multi-Stage Fracture 5436.50 5479.60 0
2018-09-15 Perforation 5429.40 5429.90 12
2018-09-15 Perforation 5422.30 5422.80 10
2018-09-15 Perforation 5415.10 5415.60 10
2018-09-15 Perforation 5408.00 5408.50 10
2018-09-15 Perforation 5400.90 5401.40 10
2018-09-15 Perforation 5393.80 5394.30 8
2018-09-15 Perforation 5386.70 5387.20 8
2018-08-30 Multi-Stage Fracture 6282.60 6325.70 0
2018-09-15 Multi-Stage Fracture 5386.70 5429.90 0
2018-09-15 Perforation 5380.00 5380.50 12
2018-09-15 Perforation 5373.00 5373.50 10
2018-09-15 Perforation 5365.00 5365.50 10
2018-09-15 Perforation 5358.00 5358.50 10
2018-09-15 Perforation 5351.00 5351.50 10
2018-09-15 Perforation 5344.00 5344.50 8
2018-09-15 Perforation 5337.00 5337.50 8
2018-09-15 Multi-Stage Fracture 5337.00 5380.50 0
2018-09-16 Perforation 5329.80 5330.30 12
2018-08-31 Perforation 6275.50 6276.00 10
2018-09-16 Perforation 5322.70 5323.20 10
2018-09-16 Perforation 5315.60 5316.10 10
2018-09-16 Perforation 5308.50 5309.00 10
2018-09-16 Perforation 5301.40 5301.90 10
2018-09-16 Perforation 5294.30 5294.80 8
2018-09-16 Perforation 5287.20 5287.70 8
2018-09-16 Multi-Stage Fracture 5287.20 5330.30 0
2018-09-17 Perforation 5280.10 5280.60 12
2018-09-17 Perforation 5272.90 5273.40 10
2018-09-17 Perforation 5265.80 5266.30 10
2018-08-31 Perforation 6268.40 6268.90 10
2018-09-17 Perforation 5258.70 5259.20 10
2018-09-17 Perforation 5251.60 5252.10 10
2018-09-17 Perforation 5244.50 5245.00 8
2018-09-17 Perforation 5237.40 5237.90 8
2018-09-17 Multi-Stage Fracture 5237.40 5280.60 0
2018-09-18 Perforation 5230.30 5230.80 12
2018-09-18 Multi-Stage Fracture 5187.60 5230.80 0
2018-09-18 Perforation 5223.20 5223.70 10
2018-09-18 Perforation 5216.10 5216.60 10
2018-09-18 Perforation 5209.00 5209.50 10
2018-08-31 Perforation 6261.20 6261.70 10
2018-09-18 Perforation 5201.80 5202.30 10
2018-09-18 Perforation 5194.70 5195.20 8
2018-09-18 Perforation 5187.60 5188.10 8
2018-09-18 Perforation 5180.50 5181.00 12
2018-09-18 Perforation 5173.40 5173.90 10
2018-09-18 Perforation 5166.30 5166.80 10
2018-09-18 Perforation 5159.20 5159.70 10
2018-09-18 Perforation 5152.10 5152.60 10
2018-09-18 Perforation 5145.00 5145.50 8
2018-09-18 Perforation 5137.90 5138.40 8
2018-08-28 Multi-Stage Fracture 6332.50 6375.50 0
2018-08-31 Perforation 6254.10 6254.60 10
2018-09-18 Multi-Stage Fracture 5137.90 5181.00 0
2018-09-19 Perforation 5130.70 5131.20 12
2018-09-19 Perforation 5123.60 5124.10 10
2018-09-19 Perforation 5116.50 5117.00 10
2018-09-19 Perforation 5109.40 5109.90 10
2018-09-19 Perforation 5102.30 5102.80 10
2018-09-19 Perforation 5095.20 5095.70 8
2018-09-19 Perforation 5088.10 5088.60 8
2018-09-19 Multi-Stage Fracture 5088.10 5131.20 0
2018-09-20 Perforation 5081.00 5081.50 10
2018-08-31 Perforation 6247.00 6247.50 8
2018-09-20 Perforation 5073.90 5074.40 8
2018-09-20 Perforation 5066.80 5067.30 8
2018-09-20 Perforation 5059.60 5060.10 8
2018-09-20 Perforation 5052.50 5053.00 8
2018-09-20 Perforation 5045.40 5045.90 8
2018-09-20 Multi-Stage Fracture 5038.30 5081.50 0
2018-09-20 Perforation 5038.30 5038.80 6
2018-09-21 Perforation 5031.20 5031.70 10
2018-09-21 Perforation 5024.10 5024.60 8
2018-09-21 Perforation 5017.00 5017.50 8
2018-08-31 Perforation 6239.90 6240.40 8
2018-09-21 Perforation 5009.90 5010.40 8
2018-09-21 Perforation 5002.80 5003.30 8
2018-09-21 Perforation 4995.70 4996.20 8
2018-09-21 Perforation 4988.50 4989.00 6
2018-09-21 Multi-Stage Fracture 4988.50 5031.70 0
2018-09-22 Perforation 4981.40 4981.90 8
2018-09-22 Multi-Stage Fracture 4938.80 4981.90 0
2018-09-22 Perforation 4974.10 4974.60 8
2018-09-22 Perforation 4967.20 4967.70 10
2018-09-22 Perforation 4960.10 4960.60 10
2018-08-31 Perforation 6232.80 6233.30 8
2018-09-22 Perforation 4953.00 4953.50 10
2018-09-22 Perforation 4945.90 4946.40 10
2018-09-22 Perforation 4938.80 4939.30 12
2018-09-22 Perforation 4931.70 4932.20 12
2018-09-22 Perforation 4924.60 4925.10 10
2018-09-22 Perforation 4917.40 4917.90 10
2018-09-22 Perforation 4910.30 4910.80 10
2018-09-22 Perforation 4903.20 4903.70 10
2018-09-22 Perforation 4896.10 4896.60 8
2018-09-22 Perforation 4889.00 4889.50 8
2018-09-01 Multi-Stage Fracture 6232.80 6276.00 0
2018-09-23 Multi-Stage Fracture 4889.00 4932.20 0
2018-09-23 Perforation 4881.90 4882.40 12
2018-09-23 Perforation 4874.80 4875.30 10
2018-09-23 Perforation 4867.70 4868.20 10
2018-09-23 Perforation 4846.30 4846.80 8
2018-09-23 Perforation 4860.60 4861.10 10
2018-09-23 Perforation 4853.50 4854.00 10
2018-09-23 Perforation 4839.20 4839.70 8
2018-09-23 Multi-Stage Fracture 4839.20 4882.40 0
2018-09-23 Perforation 4832.10 4832.60 12
2018-09-02 Perforation 6225.70 6226.20 10
2018-09-23 Perforation 4825.00 4825.50 10
2018-09-23 Perforation 4817.90 4818.40 10
2018-09-23 Perforation 4810.80 4811.30 10
2018-09-23 Perforation 4802.70 4803.20 10
2018-09-23 Perforation 4796.60 4797.10 8
2018-09-23 Perforation 4789.50 4790.00 8
2018-09-24 Multi-Stage Fracture 4789.50 4832.60 0
2018-09-24 Perforation 4782.40 4782.90 12
2018-09-24 Perforation 4775.20 4775.70 10
2018-09-24 Perforation 4768.10 4768.60 10
2018-09-02 Perforation 6218.60 6219.10 8
2018-09-24 Perforation 4761.00 4761.50 10
2018-09-24 Perforation 4753.90 4754.40 10
2018-09-24 Perforation 4746.80 4747.30 8
2018-09-24 Perforation 4739.70 4740.20 8
2018-09-25 Multi-Stage Fracture 4739.70 4782.90 0
2018-09-25 Perforation 4732.60 4733.10 12
2018-09-25 Perforation 4725.50 4726.00 10
2018-09-25 Perforation 4718.40 4718.90 10
2018-09-25 Perforation 4711.30 4711.80 10
2018-09-25 Perforation 4704.10 4704.60 10
2018-09-02 Perforation 6211.50 6212.00 8
2018-09-25 Perforation 4697.00 4697.50 8
2018-09-25 Perforation 4689.90 4690.40 8
2018-09-25 Multi-Stage Fracture 4689.90 4733.10 0
2018-09-25 Perforation 4682.80 4683.30 12
2018-09-25 Perforation 4675.70 4676.20 10
2018-09-25 Perforation 4668.60 4669.10 10
2018-09-25 Perforation 4661.50 4662.00 10
2018-09-25 Perforation 4654.40 4654.90 10
2018-09-25 Perforation 4647.30 4647.80 8
2018-09-25 Perforation 4640.20 4640.70 8
2018-09-02 Perforation 6204.40 6204.90 8
2018-09-26 Multi-Stage Fracture 4640.20 4683.30 0
2018-09-26 Perforation 4633.00 4633.50 12
2018-09-26 Perforation 4625.90 4626.40 10
2018-09-26 Perforation 4618.80 4619.30 10
2018-09-26 Perforation 4611.70 4612.20 10
2018-09-26 Perforation 4604.60 4605.10 10
2018-09-26 Perforation 4597.50 4598.00 8
2018-09-26 Perforation 4590.40 4590.90 8
2018-09-26 Multi-Stage Fracture 4590.40 4633.50 0
2018-09-26 Perforation 4583.30 4583.80 12
2018-09-02 Perforation 6197.30 6197.80 8
2018-09-26 Perforation 4576.20 4576.70 10
2018-09-26 Perforation 4569.10 4569.60 10
2018-09-26 Perforation 4561.90 4562.40 10
2018-09-26 Perforation 4554.80 4555.30 10
2018-09-26 Perforation 4547.70 4548.20 8
2018-09-26 Perforation 4540.60 4541.10 8
2018-09-26 Multi-Stage Fracture 4540.60 4583.80 0
2018-09-27 Perforation 4533.50 4534.00 12
2018-09-27 Perforation 4526.40 4526.90 10
2018-09-27 Perforation 4519.30 4519.80 10
2018-08-28 Perforation 6367.90 6368.40 12
2018-09-02 Perforation 6190.10 6190.60 8
2018-09-27 Perforation 4512.20 4512.70 10
2018-09-27 Perforation 4505.10 4505.60 10
2018-09-27 Perforation 4498.00 4498.50 8
2018-09-27 Perforation 4490.80 4491.30 8
2018-09-27 Multi-Stage Fracture 4490.80 4534.00 0
2018-09-27 Perforation 4483.70 4484.20 12
2018-09-27 Perforation 4476.60 4477.10 10
2018-09-27 Perforation 4469.50 4470.00 10
2018-09-27 Perforation 4462.40 4462.90 10
2018-09-27 Perforation 4455.30 4455.80 10
2018-09-02 Perforation 6183.00 6183.50 6
2018-09-27 Perforation 4448.20 4448.70 8
2018-09-27 Perforation 4441.10 4441.60 8
2018-09-27 Multi-Stage Fracture 4441.10 4484.20 0
2018-09-28 Perforation 4434.00 4434.50 12
2018-09-28 Perforation 4426.90 4427.40 10
2018-09-28 Perforation 4419.70 4420.20 10
2018-09-28 Perforation 4412.60 4413.10 10
2018-09-28 Perforation 4405.50 4406.00 10
2018-09-28 Perforation 4398.40 4398.90 8
2018-09-28 Perforation 4391.30 4391.80 8
2018-09-02 Multi-Stage Fracture 6183.00 6226.20 0
2018-09-28 Multi-Stage Fracture 4391.30 4434.50 0
2018-09-28 Perforation 4384.20 4384.70 12
2018-09-28 Perforation 4377.10 4377.60 10
2018-09-28 Perforation 4370.00 4370.50 10
2018-09-28 Perforation 4362.90 4363.40 10
2018-09-28 Perforation 4355.80 4356.30 10
2018-09-28 Perforation 4348.60 4349.10 8
2018-09-28 Perforation 4341.50 4342.00 8
2018-09-28 Multi-Stage Fracture 4341.50 4384.70 0
2018-09-28 Perforation 4334.40 4334.90 12
2018-09-02 Perforation 6175.90 6176.40 10
2018-09-28 Perforation 4327.30 4327.80 10
2018-09-28 Perforation 4320.20 4320.70 10
2018-09-28 Perforation 4313.10 4313.60 10
2018-09-28 Perforation 4306.00 4306.50 10
2018-09-28 Perforation 4298.90 4299.40 8
2018-09-28 Perforation 4291.80 4292.30 8
2018-09-29 Multi-Stage Fracture 4291.80 4334.90 0
2018-09-29 Perforation 4284.70 4285.20 12
2018-09-29 Perforation 4277.50 4278.00 10
2018-09-29 Perforation 4270.40 4270.90 10
2018-09-02 Perforation 6168.80 6169.30 8
2018-09-29 Perforation 4263.30 4263.80 10
2018-09-29 Perforation 4256.20 4256.70 10
2018-09-29 Perforation 4249.10 4249.60 8
2018-09-29 Perforation 4242.00 4242.50 8
2018-09-29 Multi-Stage Fracture 4242.00 4285.20 0
2018-09-29 Perforation 4234.90 4235.40 12
2018-09-29 Perforation 4227.80 4228.30 10
2018-09-29 Perforation 4220.70 4221.20 10
2018-09-29 Perforation 4213.60 4214.10 10
2018-09-29 Perforation 4206.40 4206.90 10
2018-09-02 Perforation 6161.70 6162.20 8
2018-09-29 Perforation 4199.30 4199.80 8
2018-09-29 Perforation 4192.20 4192.70 8
2018-09-29 Multi-Stage Fracture 4192.20 4235.40 0
2018-09-29 Perforation 4185.10 4185.60 12
2018-09-29 Perforation 4178.00 4178.50 10
2018-09-29 Perforation 4170.90 4171.40 10
2018-09-29 Perforation 4163.80 4164.30 10
2018-09-29 Perforation 4156.70 4157.20 10
2018-09-29 Perforation 4149.60 4150.10 8
2018-09-29 Perforation 4142.50 4143.00 8
2018-09-02 Perforation 6154.60 6155.10 8
2018-09-29 Multi-Stage Fracture 4142.50 4185.60 0
2018-09-30 Perforation 4135.30 4135.80 12
2018-09-30 Perforation 4128.20 4128.70 10
2018-09-30 Perforation 4121.10 4121.60 10
2018-09-30 Perforation 4114.00 4114.50 10
2018-09-30 Perforation 4106.90 4107.40 10
2018-09-30 Perforation 4099.80 4100.30 8
2018-09-30 Perforation 4092.70 4093.20 8
2018-09-30 Multi-Stage Fracture 4092.70 4135.80 0
2018-09-30 Perforation 4085.60 4086.10 12
2018-09-02 Perforation 6147.50 6148.00 8
2018-09-30 Perforation 4078.50 4079.00 10
2018-09-30 Perforation 4071.40 4071.90 10
2018-09-30 Perforation 4064.20 4064.70 10
2018-09-30 Perforation 4057.10 4057.60 10
2018-09-30 Perforation 4050.00 4050.50 8
2018-09-30 Perforation 4042.90 4043.40 8
2018-09-30 Multi-Stage Fracture 4042.90 4086.10 0
2018-09-30 Perforation 4035.80 4036.30 12
2018-09-30 Perforation 4028.70 4029.20 10
2018-09-30 Perforation 4021.60 4022.10 10
2018-09-02 Perforation 6140.40 6140.90 8
2018-09-30 Perforation 4014.50 4015.00 10
2018-09-30 Perforation 4007.40 4007.90 10
2018-09-30 Perforation 4000.30 4000.80 8
2018-09-30 Perforation 3993.10 3993.60 8
2018-09-30 Multi-Stage Fracture 3993.10 4036.30 0
2018-10-01 Perforation 3986.00 3986.50 12
2018-10-01 Perforation 3978.90 3979.40 10
2018-10-01 Perforation 3971.80 3972.30 10
2018-10-01 Perforation 3964.70 3965.20 10
2018-10-01 Perforation 3957.60 3958.10 10
2018-09-02 Perforation 6133.30 6133.80 6
2018-10-01 Perforation 3950.50 3951.00 8
2018-10-01 Perforation 3943.40 3943.90 8
2018-10-01 Multi-Stage Fracture 3943.40 3986.50 0
2018-10-01 Perforation 3936.30 3936.80 12
2018-10-01 Perforation 3929.20 3929.70 10
2018-10-01 Perforation 3922.00 3922.50 10
2018-10-01 Perforation 3914.90 3915.40 10
2018-10-01 Perforation 3907.80 3908.30 10
2018-10-01 Perforation 3900.70 3901.20 8
2018-10-01 Perforation 3893.60 3894.10 8
2018-08-28 Perforation 6360.80 6361.30 12
2018-09-02 Multi-Stage Fracture 6133.30 6176.40 0
2018-10-02 Multi-Stage Fracture 3893.60 3936.80 0
2018-10-02 Perforation 3886.50 3887.00 12
2018-10-02 Perforation 3879.40 3879.90 10
2018-10-02 Perforation 3872.30 3872.80 10
2018-10-02 Perforation 3865.20 3865.70 10
2018-10-02 Perforation 3858.10 3858.60 10
2018-10-02 Perforation 3850.90 3851.40 8
2018-10-02 Perforation 3843.80 3844.30 8
2018-10-02 Multi-Stage Fracture 3843.80 3887.00 0
2018-10-03 Perforation 3836.70 3837.20 12
2018-09-03 Perforation 6126.20 6126.70 10
2018-10-03 Perforation 3829.60 3830.10 10
2018-10-03 Perforation 3822.50 3823.00 10
2018-10-03 Perforation 3815.40 3815.90 10
2018-10-03 Perforation 3808.30 3808.80 10
2018-10-03 Perforation 3801.20 3801.70 8
2018-10-03 Perforation 3794.10 3794.60 8
2018-10-03 Multi-Stage Fracture 3794.10 3837.20 0
2018-09-03 Perforation 6119.00 6119.50 8
2018-09-03 Perforation 6111.90 6112.40 8
2018-09-03 Perforation 6104.80 6105.30 8
2018-09-03 Perforation 6097.70 6098.20 8
2018-09-03 Perforation 6090.60 6091.10 8
2018-09-03 Perforation 6083.50 6084.00 6
2018-09-03 Multi-Stage Fracture 6083.50 6126.70 0
2018-09-03 Perforation 6076.40 6076.90 10
2018-08-28 Perforation 6353.70 6354.20 12
2018-09-03 Perforation 6069.30 6069.80 8
2018-09-03 Perforation 6062.20 6062.70 8
2018-09-03 Perforation 6055.10 6055.60 8
2018-09-03 Perforation 6047.90 6048.40 8
2018-09-03 Perforation 6040.80 6041.30 8
2018-09-03 Perforation 6033.70 6034.20 6
2018-09-04 Multi-Stage Fracture 6033.70 6076.90 0
2018-09-04 Perforation 6026.60 6027.10 10
2018-09-04 Perforation 6019.50 6020.00 8
2018-09-04 Perforation 6012.40 6012.90 8
2018-08-28 Perforation 6346.60 6347.10 12
2018-09-04 Perforation 6005.30 6005.80 8
2018-09-04 Perforation 5998.20 5998.70 8
2018-09-04 Perforation 5991.10 5991.60 8
2018-09-04 Perforation 5984.00 5984.50 6
2018-09-05 Multi-Stage Fracture 5984.00 6027.10 0
2018-09-06 Perforation 5976.80 5977.30 10
2018-09-06 Perforation 5969.70 5970.20 8
2018-09-06 Perforation 5962.60 5963.10 8
2018-09-06 Perforation 5955.50 5956.00 8
2018-09-06 Perforation 5948.40 5948.90 8
2018-08-28 Perforation 6339.50 6340.00 12
2018-09-06 Perforation 5941.30 5941.80 8
2018-09-06 Perforation 5934.20 5934.70 6
2018-09-06 Multi-Stage Fracture 5934.20 5977.30 0
2018-09-06 Perforation 5927.10 5927.60 12
2018-09-06 Perforation 5920.00 5920.50 10
2018-09-06 Perforation 5912.90 5913.40 10
2018-09-06 Perforation 5905.70 5906.20 10
2018-09-06 Perforation 5898.60 5899.10 10
2018-09-06 Perforation 5891.50 5892.00 8
2018-09-06 Perforation 5884.40 5884.90 8
2018-08-28 Perforation 6332.50 6333.00 12
2018-09-07 Multi-Stage Fracture 5884.40 5927.60 0
2018-09-07 Perforation 5877.30 5877.80 12
2018-09-07 Perforation 5870.20 5870.70 10
2018-09-07 Perforation 5863.10 5863.60 10
2018-09-07 Perforation 5856.00 5856.50 10
2018-09-07 Perforation 5848.90 5849.40 10
2018-09-07 Perforation 5841.80 5842.30 8
2018-09-07 Perforation 5834.60 5835.10 8
2018-09-07 Multi-Stage Fracture 5834.60 5877.80 0
2018-09-07 Perforation 5827.50 5828.00 12
2018-08-29 Perforation 6325.20 6325.70 10
2018-09-07 Perforation 5820.40 5820.90 10
2018-09-07 Perforation 5813.30 5813.80 10
2018-09-07 Perforation 5806.20 5806.70 10
2018-09-07 Perforation 5799.10 5799.60 10
2018-09-07 Perforation 5792.00 5792.50 8
2018-09-07 Perforation 5784.90 5785.40 8
2018-09-07 Multi-Stage Fracture 5784.90 5828.00 0
2018-09-08 Perforation 5777.80 5778.30 12
2018-09-08 Perforation 5770.80 5771.30 10
2018-09-08 Perforation 5763.50 5764.00 10

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-08-28 2018-10-03 3,688 79,478 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water 7732-18-5 100 88.4857 N/A
FRAC SAND. 40/70 WHITE BJ Services Crystalline Silica (Quartz) 14808-60-7 100 8.2933 N/A
FRAC SAND. 50/140 CANADIAN BJ Services Crystalline Silica (Quartz) 14808-60-7 100 1.7483 N/A
Hydrochloric Acid 15% BJ Services Acid Hydrochloric acid 7647-01-0 100 0.3151 N/A
Water 7732-18-5 100 0.3151 N/A
Alpha 544 BJ Services Bactericide/Biocide 2.2-Dibromo-3-nitrilopropionamide 10222-01-2 100 0.009 N/A
Dibromoacetonitrile 3252-43-5 100 0.009 N/A
Polyethylene Glycol 25322-68-3 100 0.009 N/A
Sodium Bromide 7647-15-6 100 0.009 N/A
Water 7732-18-5 100 0.009 N/A
GBW-41LW BJ Services Breaker Hydrogen Peroxide 7722-84-1 100 0.0266 N/A
Methanol 67-56-1 100 0.0266 N/A
Non-hazardous Not Available 100 0.0266 N/A
High Perm EP BJ Services Breaker Ammonium persulphate 7727-54-0 100 0.0012 N/A
BF-9L BJ Services Buffer potassium carbonate 584-08-7 100 0.0581 N/A
Potassium hydroxide 1310-58-3 100 0.0581 N/A
Water 7732-18-5 100 0.0581 N/A
CI-27 BJ Services Corrosion Inhibitor Fatty acids 61790-12-3 100 0.0016 N/A
Methanol 67-56-1 100 0.0016 N/A
Modified thiourea polymer 68527-49-1 100 0.0016 N/A
Olefin 64743-02-8 100 0.0016 N/A
Polyoxyalkylenes 68951-67-7 100 0.0016 N/A
Propargyl alcohol 107-19-7 100 0.0016 N/A
XLW-30SR BJ Services Crosslinker Acrylic Polymer 97953-25-8 100 0.0467 N/A
Ethylene glycol 107-21-1 100 0.0467 N/A
Inorganic Borates 1319-33-1 100 0.0467 N/A
Polysaccharide 11138-66-2 100 0.0467 N/A
Water 7732-18-5 100 0.0467 N/A
FP-12L BJ Services Defoamer Methylcellulose 9004-67-5 100 0 N/A
Non-hazardous Not Available 100 0 N/A
Octamethylcyclotetrasiloxane 556-67-2 100 0.0001 N/A
Polydimethylsiloxane 63148-62-9 100 0 N/A
Water 7732-18-5 100 0 N/A
D-3 BJ Services Demulsifier Ethoxylated alcohol. branched 78330-19-5 100 0.0014 N/A
Isopropanol 67-63-0 100 0.0014 N/A
Methanol 67-56-1 100 0.0014 N/A
XFrac-09 BJ Services Friction Reducer 1.2 Propanediol carbonate 108-32-7 100 0.1223 N/A
Distillates (petroleum) hydrotreated light paraffinic 64742-55-8 100 0.1223 N/A
Lecitihins. soya 8030-76-0 100 0.1223 N/A
polymer Trade Secret 100 0.1223 N/A
Water 7732-18-5 100 0.1223 N/A
GW-3 BJ Services Gelling Agent Guar Gum 9000-30-0 100 0.0442 N/A
Ferrotrol 800 BJ Services Iron Control Trisodium nitrilotriacetate monohydrate 18662-53-8 100 0.7863 N/A
ScaleTrol 14 BJ Services Scale Inhibitor Phosphinocarboxylic acid copolymer 110224-99-2 100 0.0224 N/A
Water 7732-18-5 100 0.0224 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2018-08-16 2018-10-12 Surface Water - Runoff 78951

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2018 418 0.0 0.0 0.0
2019 8308 0.0 0.0 0.0
2020 2154 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-03-13 No Incident Encountered 0.00 0.00
2018-10-27 No Incident Encountered 0.00 0.00

For data sources see[10]

References