X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0625242613000

Well Details

Well ID: 0625242613000
Loading map...
Location: 00/13-26-062-24W5/0
Location Alias: 00/13-26-62-24 W5M
Location Alias 2: 00/13-26-062-24 W5/00
Country: Canada
Province: Alberta
Township: 062
Meridian: 5
Range: 24
Section: 26
County/Municipality: Municipal District of Greenview No. 16
Well Name: CHEVRON HZ WAHIGAN 13-26-62-24
Operator Name: Chevron Canada Limited
License Number: 0476600
License Date: 2015-08-17
License Status: Amended
Spud Date: 2018-01-07
Final Drill Date: 2018-04-04
Well Total Depth: 6521.00 m
Surface Hole Latitude: 54.375137
Surface Hole Longitude: -117.488764

For data sources see[1][2]

Well History

Date Event
2015-08-17 Obtained License
2018-01-07 Direction Drilling Operation Performed - Deviate
2018-01-08 Surface Casing Operation Performed
2018-02-04 Intermediate Casing Operation Performed
2018-03-29 Direction Drilling Operation Performed - Horizontal
2018-04-04 Finished Drilling
2018-04-04 Well Mode changed to Drilled and Cased
2018-04-05 Well Log Performed
2018-04-07 Production Casing Operation Performed
2018-04-07 Rig Released
2018-08-20 Perforation Treatment Performed - Jet Perforation
2018-08-28 Perforation Treatment Performed - Multi-Stage Fracture
2018-08-29 Perforation Treatment Performed - Jet Perforation
2018-08-29 Perforation Treatment Performed - Multi-Stage Fracture
2018-08-31 Perforation Treatment Performed - Jet Perforation
2018-09-01 Perforation Treatment Performed - Jet Perforation
2018-09-01 Perforation Treatment Performed - Multi-Stage Fracture
2018-09-02 Perforation Treatment Performed - Jet Perforation
2018-09-02 Perforation Treatment Performed - Multi-Stage Fracture
2018-09-03 Perforation Treatment Performed - Jet Perforation
2018-09-03 Perforation Treatment Performed - Multi-Stage Fracture
2018-09-04 Perforation Treatment Performed - Jet Perforation
2018-09-04 Perforation Treatment Performed - Multi-Stage Fracture
2018-09-05 Perforation Treatment Performed - Multi-Stage Fracture
2018-09-06 Perforation Treatment Performed - Jet Perforation
2018-09-06 Perforation Treatment Performed - Multi-Stage Fracture
2018-09-07 Perforation Treatment Performed - Jet Perforation
2018-09-07 Perforation Treatment Performed - Multi-Stage Fracture
2018-09-08 Perforation Treatment Performed - Jet Perforation
2018-09-08 Perforation Treatment Performed - Multi-Stage Fracture
2018-09-09 Perforation Treatment Performed - Jet Perforation
2018-09-09 Perforation Treatment Performed - Multi-Stage Fracture
2018-09-10 Perforation Treatment Performed - Jet Perforation
2018-09-10 Perforation Treatment Performed - Multi-Stage Fracture
2018-09-11 Perforation Treatment Performed - Jet Perforation
2018-09-11 Perforation Treatment Performed - Multi-Stage Fracture
2018-09-12 Perforation Treatment Performed - Jet Perforation
2018-09-12 Perforation Treatment Performed - Multi-Stage Fracture
2018-09-13 Perforation Treatment Performed - Jet Perforation
2018-09-13 Perforation Treatment Performed - Multi-Stage Fracture
2018-09-14 Perforation Treatment Performed - Jet Perforation
2018-09-14 Perforation Treatment Performed - Multi-Stage Fracture
2018-09-15 Perforation Treatment Performed - Jet Perforation
2018-09-15 Perforation Treatment Performed - Multi-Stage Fracture
2018-09-16 Perforation Treatment Performed - Multi-Stage Fracture
2018-09-17 Perforation Treatment Performed - Jet Perforation
2018-09-17 Perforation Treatment Performed - Multi-Stage Fracture
2018-09-18 Perforation Treatment Performed - Jet Perforation
2018-09-18 Perforation Treatment Performed - Multi-Stage Fracture
2018-09-19 Perforation Treatment Performed - Jet Perforation
2018-09-19 Perforation Treatment Performed - Multi-Stage Fracture
2018-09-20 Perforation Treatment Performed - Jet Perforation
2018-09-20 Perforation Treatment Performed - Multi-Stage Fracture
2018-09-21 Perforation Treatment Performed - Jet Perforation
2018-09-21 Perforation Treatment Performed - Multi-Stage Fracture
2018-09-22 Perforation Treatment Performed - Jet Perforation
2018-09-22 Perforation Treatment Performed - Multi-Stage Fracture
2018-09-23 Perforation Treatment Performed - Jet Perforation
2018-09-23 Perforation Treatment Performed - Multi-Stage Fracture
2018-09-24 Perforation Treatment Performed - Jet Perforation
2018-09-24 Perforation Treatment Performed - Multi-Stage Fracture
2018-09-25 Perforation Treatment Performed - Jet Perforation
2018-09-25 Perforation Treatment Performed - Multi-Stage Fracture
2018-10-01 Perforation Treatment Performed - Jet Perforation
2018-10-01 Perforation Treatment Performed - Multi-Stage Fracture
2018-10-02 Perforation Treatment Performed - Jet Perforation
2018-10-02 Perforation Treatment Performed - Multi-Stage Fracture
2018-10-03 Perforation Treatment Performed - Jet Perforation
2018-10-03 Perforation Treatment Performed - Multi-Stage Fracture
2018-10-04 Perforation Treatment Performed - Jet Perforation
2018-10-04 Perforation Treatment Performed - Multi-Stage Fracture
2018-10-05 Perforation Treatment Performed - Jet Perforation
2018-10-07 Perforation Treatment Performed - Jet Perforation
2018-10-07 Perforation Treatment Performed - Multi-Stage Fracture
2018-10-08 Perforation Treatment Performed - Jet Perforation
2018-10-08 Perforation Treatment Performed - Multi-Stage Fracture
2018-10-09 Perforation Treatment Performed - Jet Perforation
2018-10-09 Perforation Treatment Performed - Multi-Stage Fracture
2018-10-10 Perforation Treatment Performed - Jet Perforation
2018-10-10 Perforation Treatment Performed - Multi-Stage Fracture
2018-10-11 Perforation Treatment Performed - Jet Perforation
2018-10-11 Perforation Treatment Performed - Multi-Stage Fracture
2018-10-12 Perforation Treatment Performed - Jet Perforation
2018-10-12 Perforation Treatment Performed - Multi-Stage Fracture
2018-11-25 Well Began Production
2018-11-25 Well Fluid changed to Shale Gas Only
2018-11-25 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2018-01-07 Ensign Drilling Inc. 785 N/A Set Surface
2018-03-28 Ensign Drilling Inc. 785 N/A Drill To LD
2018-01-29 Ensign Drilling Inc. 785 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2018-01-07 243.70 Deviate (5 - 79 degrees)
2018-03-29 3866.40 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2018-08-20 Perforation 6475.00 6475.50 12
2018-08-29 Perforation 6417.80 6418.30 10
2018-09-08 Perforation 5853.00 5853.50 10
2018-09-08 Perforation 5845.80 5846.30 10
2018-09-08 Perforation 5838.70 5839.20 8
2018-09-08 Perforation 5831.50 5832.00 8
2018-09-09 Multi-Stage Fracture 5831.50 5874.90 0
2018-09-09 Perforation 5824.40 5824.90 12
2018-09-09 Perforation 5817.20 5817.70 10
2018-09-09 Perforation 5810.10 5810.60 10
2018-09-09 Perforation 5802.90 5803.40 10
2018-09-09 Perforation 5795.80 5796.30 10
2018-08-29 Perforation 6410.70 6411.20 10
2018-09-09 Perforation 5788.60 5789.10 8
2018-09-09 Perforation 5781.50 5782.00 8
2018-09-10 Multi-Stage Fracture 5781.50 5824.90 0
2018-09-10 Perforation 5774.30 5774.80 12
2018-09-10 Perforation 5767.20 5767.70 10
2018-09-10 Perforation 5760.00 5760.50 10
2018-09-10 Perforation 5752.90 5753.40 10
2018-09-10 Perforation 5745.70 5746.20 10
2018-09-10 Perforation 5738.60 5739.10 8
2018-09-10 Perforation 5731.40 5731.90 8
2018-08-29 Perforation 6403.50 6404.00 10
2018-09-10 Multi-Stage Fracture 5731.40 5774.80 0
2018-09-11 Perforation 5724.30 5724.80 12
2018-09-11 Perforation 5717.10 5717.60 10
2018-09-11 Perforation 5710.00 5710.50 10
2018-09-11 Perforation 5702.80 5703.30 10
2018-09-11 Perforation 5695.70 5696.20 10
2018-09-11 Perforation 5688.50 5689.00 8
2018-09-11 Perforation 5681.40 5681.90 8
2018-09-11 Multi-Stage Fracture 5681.40 5724.80 0
2018-09-12 Perforation 5674.20 5674.70 12
2018-08-29 Perforation 6396.40 6396.90 8
2018-09-12 Perforation 5667.10 5667.60 10
2018-09-12 Perforation 5659.90 5660.40 10
2018-09-12 Perforation 5652.80 5653.30 10
2018-09-12 Perforation 5645.60 5646.10 10
2018-09-12 Perforation 5638.50 5639.00 8
2018-09-12 Perforation 5631.30 5631.80 8
2018-09-12 Multi-Stage Fracture 5631.30 5674.70 0
2018-09-12 Perforation 5624.20 5624.70 12
2018-09-12 Perforation 5617.00 5617.50 10
2018-09-12 Perforation 5609.90 5610.40 10
2018-08-29 Perforation 6389.20 6389.70 8
2018-09-12 Perforation 5602.70 5603.20 10
2018-09-12 Perforation 5595.60 5596.10 10
2018-09-12 Perforation 5588.40 5588.90 8
2018-09-12 Perforation 5581.30 5581.80 8
2018-09-12 Multi-Stage Fracture 5581.30 5624.70 0
2018-09-13 Perforation 5574.10 5574.60 12
2018-09-13 Perforation 5567.00 5567.50 10
2018-09-13 Perforation 5559.80 5560.30 10
2018-09-13 Perforation 5552.70 5553.20 10
2018-09-13 Perforation 5545.50 5546.00 10
2018-08-29 Perforation 6382.10 6382.60 8
2018-09-13 Perforation 5538.40 5538.90 8
2018-09-13 Perforation 5531.20 5531.70 8
2018-09-13 Multi-Stage Fracture 5531.20 5574.60 0
2018-09-14 Perforation 5524.10 5524.60 12
2018-09-14 Perforation 5516.90 5517.40 10
2018-09-14 Perforation 5509.80 5510.30 10
2018-09-14 Perforation 5502.60 5503.10 10
2018-09-14 Perforation 5495.50 5496.00 10
2018-09-14 Perforation 5488.30 5488.80 8
2018-09-14 Perforation 5481.20 5481.70 8
2018-08-29 Multi-Stage Fracture 6382.10 6425.50 0
2018-09-14 Multi-Stage Fracture 5481.20 5524.60 0
2018-09-15 Perforation 5474.00 5474.50 12
2018-09-15 Perforation 5466.90 5467.40 10
2018-09-15 Perforation 5459.70 5460.20 10
2018-09-15 Perforation 5452.60 5453.10 10
2018-09-15 Perforation 5445.50 5446.00 10
2018-09-15 Perforation 5438.30 5438.80 8
2018-09-15 Perforation 5431.10 5431.60 8
2018-09-15 Multi-Stage Fracture 5431.10 5474.50 0
2018-09-15 Perforation 5424.00 5424.50 12
2018-08-31 Perforation 6374.90 6375.40 10
2018-09-15 Perforation 5416.80 5417.30 10
2018-09-15 Perforation 5409.70 5410.20 10
2018-09-15 Perforation 5402.50 5403.00 10
2018-09-15 Perforation 5395.40 5395.90 10
2018-09-15 Perforation 5388.20 5388.70 8
2018-09-15 Perforation 5381.10 5381.60 8
2018-09-16 Multi-Stage Fracture 5381.10 5424.50 0
2018-09-17 Perforation 5373.90 5374.40 12
2018-09-17 Perforation 5366.80 5367.30 10
2018-09-17 Perforation 5359.60 5360.10 10
2018-08-31 Perforation 6367.80 6368.30 10
2018-09-17 Perforation 5352.50 5353.00 10
2018-09-17 Perforation 5345.30 5345.80 10
2018-09-17 Perforation 5338.20 5338.70 8
2018-09-17 Perforation 5331.00 5331.50 8
2018-09-17 Multi-Stage Fracture 5331.00 5374.40 0
2018-09-17 Perforation 5323.90 5324.40 12
2018-09-17 Perforation 5316.70 5317.20 10
2018-09-17 Perforation 5309.60 5310.10 10
2018-09-17 Perforation 5302.40 5302.90 10
2018-09-17 Perforation 5295.30 5295.80 10
2018-08-31 Perforation 6360.60 6361.10 10
2018-09-17 Perforation 5288.10 5288.60 8
2018-09-17 Perforation 5281.00 5281.50 8
2018-09-18 Multi-Stage Fracture 5281.00 5324.40 0
2018-09-18 Perforation 5273.80 5274.30 10
2018-09-18 Perforation 5266.70 5267.20 10
2018-09-18 Perforation 5259.50 5260.00 10
2018-09-18 Perforation 5252.40 5252.90 10
2018-09-18 Perforation 5245.20 5245.70 10
2018-09-18 Perforation 5238.10 5238.60 10
2018-09-18 Perforation 5230.90 5231.40 10
2018-08-20 Perforation 6467.90 6468.40 12
2018-08-31 Perforation 6353.50 6354.00 10
2018-09-18 Multi-Stage Fracture 5230.90 5274.30 0
2018-09-18 Perforation 5223.80 5224.30 12
2018-09-18 Perforation 5216.60 5217.10 10
2018-09-18 Perforation 5209.50 5210.00 10
2018-09-18 Perforation 5202.30 5202.80 10
2018-09-18 Perforation 5195.20 5195.70 10
2018-09-18 Perforation 5188.00 5188.50 8
2018-09-18 Perforation 5180.90 5181.40 8
2018-09-19 Multi-Stage Fracture 5180.90 5224.30 0
2018-09-19 Perforation 5173.70 5174.20 12
2018-08-31 Perforation 6346.30 6346.80 8
2018-09-19 Perforation 5166.60 5167.10 10
2018-09-19 Perforation 5159.40 5159.90 10
2018-09-19 Perforation 5152.30 5152.80 10
2018-09-19 Perforation 5145.10 5145.60 10
2018-09-19 Perforation 5138.00 5138.50 8
2018-09-19 Perforation 5130.80 5131.30 8
2018-09-20 Multi-Stage Fracture 5130.80 5174.20 0
2018-09-20 Perforation 5123.70 5124.20 12
2018-09-20 Perforation 5116.50 5117.00 10
2018-09-20 Perforation 5109.40 5109.90 10
2018-08-31 Perforation 6339.20 6339.70 8
2018-09-20 Perforation 5102.20 5102.70 10
2018-09-20 Perforation 5095.10 5095.60 10
2018-09-20 Perforation 5087.90 5088.40 8
2018-09-20 Perforation 5080.80 5081.30 8
2018-09-21 Multi-Stage Fracture 5080.80 5124.20 0
2018-09-21 Perforation 5073.60 5074.10 12
2018-09-21 Perforation 5066.50 5067.00 10
2018-09-21 Perforation 5059.30 5059.80 10
2018-09-21 Perforation 5052.20 5052.70 10
2018-09-21 Perforation 5045.00 5045.50 10
2018-08-31 Perforation 6332.00 6332.50 8
2018-09-21 Perforation 5037.90 5038.40 8
2018-09-21 Perforation 5030.70 5031.20 8
2018-09-22 Multi-Stage Fracture 5030.70 5074.10 0
2018-09-22 Perforation 5023.50 5024.00 12
2018-09-22 Perforation 5016.40 5016.90 10
2018-09-22 Perforation 5009.30 5009.80 10
2018-09-22 Perforation 5002.10 5002.60 10
2018-09-22 Perforation 4995.00 4995.50 10
2018-09-22 Perforation 4987.80 4988.30 8
2018-09-22 Perforation 4980.70 4981.20 8
2018-09-01 Multi-Stage Fracture 6332.00 6375.40 0
2018-09-23 Multi-Stage Fracture 4980.70 5024.00 0
2018-09-23 Perforation 4973.50 4974.00 12
2018-09-23 Perforation 4966.30 4966.80 10
2018-09-23 Perforation 4959.20 4959.70 10
2018-09-23 Perforation 4952.10 4952.60 10
2018-09-23 Perforation 4944.90 4945.40 10
2018-09-23 Perforation 4937.80 4938.30 8
2018-09-23 Perforation 4930.60 4931.10 8
2018-09-24 Multi-Stage Fracture 4930.60 4974.00 0
2018-09-24 Perforation 4923.40 4923.90 10
2018-09-01 Perforation 6324.90 6325.40 10
2018-09-24 Perforation 4916.30 4916.80 12
2018-09-24 Perforation 4909.20 4909.70 10
2018-09-24 Perforation 4902.00 4902.50 10
2018-09-24 Perforation 4894.90 4895.40 10
2018-09-24 Perforation 4887.70 4888.20 8
2018-09-24 Perforation 4880.60 4881.10 8
2018-09-25 Multi-Stage Fracture 4880.60 4923.90 0
2018-09-25 Perforation 4873.40 4873.90 12
2018-09-25 Perforation 4866.20 4866.70 10
2018-09-25 Perforation 4859.10 4859.60 10
2018-09-01 Perforation 6317.70 6318.20 8
2018-09-25 Perforation 4852.00 4852.50 10
2018-09-25 Perforation 4844.80 4845.30 10
2018-09-25 Perforation 4837.70 4838.20 8
2018-09-25 Perforation 4830.50 4831.00 8
2018-10-01 Perforation 4823.30 4823.80 12
2018-10-01 Perforation 4816.20 4816.70 10
2018-10-01 Perforation 4809.00 4809.50 10
2018-10-01 Perforation 4801.90 4802.40 10
2018-10-01 Perforation 4794.80 4795.30 10
2018-10-01 Perforation 4787.60 4788.10 8
2018-09-01 Perforation 6310.60 6311.10 8
2018-10-01 Perforation 4780.50 4781.00 8
2018-10-01 Multi-Stage Fracture 4830.50 4873.90 0
2018-10-02 Perforation 4773.30 4773.80 8
2018-10-02 Multi-Stage Fracture 4780.50 4823.80 0
2018-10-02 Perforation 4766.10 4766.60 12
2018-10-02 Perforation 4759.00 4759.50 10
2018-10-02 Perforation 4751.80 4752.30 10
2018-10-02 Perforation 4744.70 4745.20 10
2018-10-02 Perforation 4737.60 4738.10 10
2018-10-02 Perforation 4730.40 4730.90 8
2018-09-01 Perforation 6303.40 6303.90 8
2018-10-03 Multi-Stage Fracture 4730.40 4773.80 0
2018-10-03 Perforation 4723.20 4723.70 12
2018-10-03 Perforation 4716.10 4716.60 10
2018-10-03 Perforation 4708.10 4708.60 10
2018-10-03 Perforation 4701.80 4702.30 10
2018-10-03 Perforation 4694.70 4695.20 10
2018-10-03 Perforation 4687.50 4688.00 8
2018-10-03 Perforation 4680.40 4680.90 8
2018-10-04 Multi-Stage Fracture 4680.40 4723.70 0
2018-10-04 Perforation 4673.20 4673.70 12
2018-09-01 Perforation 6296.30 6296.80 8
2018-10-04 Perforation 4666.00 4666.50 10
2018-10-04 Perforation 4658.90 4659.40 10
2018-10-04 Perforation 4651.70 4652.20 10
2018-10-04 Perforation 4644.60 4645.10 10
2018-10-04 Perforation 4637.50 4638.00 8
2018-10-04 Perforation 4630.30 4630.80 8
2018-10-04 Multi-Stage Fracture 4630.30 4673.70 0
2018-10-05 Perforation 4623.10 4623.60 12
2018-10-05 Perforation 4616.00 4616.50 10
2018-10-05 Perforation 4608.80 4609.30 10
2018-08-20 Perforation 6460.70 6461.20 12
2018-09-01 Perforation 6289.10 6289.60 8
2018-10-05 Perforation 4601.70 4602.20 10
2018-10-05 Perforation 4594.50 4595.00 10
2018-10-05 Perforation 4587.40 4587.90 8
2018-10-05 Perforation 4580.30 4580.80 8
2018-10-07 Multi-Stage Fracture 4580.30 4623.60 0
2018-10-07 Perforation 4573.10 4573.60 12
2018-10-07 Perforation 4565.90 4566.40 10
2018-10-07 Perforation 4558.80 4559.30 10
2018-10-07 Perforation 4551.60 4552.10 10
2018-10-07 Perforation 4544.50 4545.00 10
2018-09-01 Perforation 6282.00 6282.50 6
2018-10-07 Perforation 4537.30 4537.80 8
2018-10-07 Perforation 4530.20 4530.70 8
2018-10-07 Multi-Stage Fracture 4530.20 4573.60 0
2018-10-07 Perforation 4523.00 4523.50 12
2018-10-07 Perforation 4515.90 4516.40 10
2018-10-07 Perforation 4508.70 4509.20 10
2018-10-07 Perforation 4501.60 4502.10 10
2018-10-07 Perforation 4494.40 4494.90 10
2018-10-07 Perforation 4487.30 4487.80 8
2018-10-07 Perforation 4480.20 4480.70 8
2018-09-01 Multi-Stage Fracture 6282.00 6325.40 0
2018-10-08 Multi-Stage Fracture 4480.20 4523.50 0
2018-10-08 Perforation 4473.00 4473.50 12
2018-10-08 Perforation 4465.80 4466.30 10
2018-10-08 Perforation 4458.70 4459.20 10
2018-10-08 Perforation 4451.50 4452.00 10
2018-10-08 Perforation 4444.40 4444.90 10
2018-10-08 Perforation 4437.20 4437.70 8
2018-10-08 Perforation 4430.10 4430.60 8
2018-10-08 Multi-Stage Fracture 4430.10 4473.50 0
2018-10-08 Perforation 4422.90 4423.40 12
2018-09-02 Perforation 6274.80 6275.30 10
2018-10-08 Perforation 4415.80 4416.30 10
2018-10-08 Perforation 4408.60 4409.10 10
2018-10-08 Perforation 4401.50 4402.00 10
2018-10-08 Perforation 4394.30 4394.80 10
2018-10-08 Perforation 4387.20 4387.70 8
2018-10-08 Perforation 4380.00 4380.50 8
2018-10-08 Multi-Stage Fracture 4380.00 4423.40 0
2018-10-09 Perforation 4372.90 4373.40 12
2018-10-09 Perforation 4365.70 4366.20 10
2018-10-09 Perforation 4358.60 4359.10 10
2018-09-02 Perforation 6267.70 6268.20 8
2018-10-09 Perforation 4351.40 4351.90 10
2018-10-09 Perforation 4344.30 4344.80 10
2018-10-09 Perforation 4337.10 4337.60 8
2018-10-09 Perforation 4330.00 4330.50 8
2018-10-09 Multi-Stage Fracture 4330.00 4373.40 0
2018-10-09 Perforation 4322.80 4323.30 12
2018-10-09 Perforation 4315.70 4316.20 10
2018-10-09 Perforation 4308.50 4309.00 10
2018-10-09 Perforation 4301.40 4301.90 10
2018-10-09 Perforation 4294.20 4294.70 10
2018-09-02 Perforation 6260.50 6261.00 8
2018-10-09 Perforation 4287.10 4287.60 8
2018-10-09 Perforation 4279.90 4280.40 8
2018-10-09 Multi-Stage Fracture 4279.90 4323.30 0
2018-10-09 Perforation 4272.80 4273.30 12
2018-10-09 Perforation 4265.60 4266.10 10
2018-10-09 Perforation 4258.50 4259.00 10
2018-10-09 Perforation 4251.30 4251.80 10
2018-10-09 Perforation 4244.20 4244.70 10
2018-10-09 Perforation 4237.00 4237.50 8
2018-10-09 Perforation 4229.90 4230.40 8
2018-09-02 Perforation 6253.40 6253.90 8
2018-10-09 Multi-Stage Fracture 4229.90 4273.30 0
2018-10-10 Perforation 4222.70 4223.20 12
2018-10-10 Perforation 4215.60 4216.10 10
2018-10-10 Perforation 4208.40 4208.90 10
2018-10-10 Perforation 4201.30 4201.80 10
2018-10-10 Perforation 4194.10 4194.60 10
2018-10-10 Perforation 4187.00 4187.50 8
2018-10-10 Perforation 4179.80 4180.30 8
2018-10-10 Multi-Stage Fracture 4179.80 4223.20 0
2018-10-10 Perforation 4172.70 4173.20 12
2018-09-02 Perforation 6246.20 6246.70 8
2018-10-10 Perforation 4165.50 4166.00 10
2018-10-10 Perforation 4158.40 4158.90 10
2018-10-10 Perforation 4151.20 4151.70 10
2018-10-10 Perforation 4144.10 4144.60 10
2018-10-10 Perforation 4136.90 4137.40 8
2018-10-10 Perforation 4129.80 4130.30 8
2018-10-10 Multi-Stage Fracture 4129.80 4173.20 0
2018-10-11 Perforation 4122.60 4123.10 12
2018-10-11 Perforation 4115.50 4116.00 10
2018-10-11 Perforation 4108.30 4108.80 10
2018-09-02 Perforation 6239.10 6239.60 8
2018-10-11 Perforation 4101.20 4101.70 10
2018-10-11 Perforation 4094.00 4094.50 10
2018-10-11 Perforation 4086.90 4087.40 8
2018-10-11 Perforation 4079.70 4080.20 8
2018-10-11 Multi-Stage Fracture 4079.70 4123.10 0
2018-10-11 Perforation 4064.90 4065.40 12
2018-10-11 Perforation 4057.80 4058.30 10
2018-10-11 Perforation 4050.70 4051.20 10
2018-10-11 Perforation 4043.50 4044.00 10
2018-10-11 Perforation 4036.40 4036.90 10
2018-09-02 Perforation 6231.90 6232.40 6
2018-10-11 Perforation 4029.20 4029.70 8
2018-10-11 Perforation 4072.10 4072.60 8
2018-10-11 Multi-Stage Fracture 4029.20 4072.60 0
2018-10-11 Perforation 4022.50 4023.00 8
2018-10-11 Perforation 4015.40 4015.90 8
2018-10-11 Perforation 4008.20 4008.70 10
2018-10-11 Perforation 4001.10 4001.60 10
2018-10-11 Perforation 3993.90 3994.40 10
2018-10-11 Perforation 3986.80 3987.30 10
2018-10-11 Perforation 3979.60 3980.10 12
2018-08-20 Perforation 6453.60 6454.10 12
2018-09-02 Multi-Stage Fracture 6231.90 6275.30 0
2018-10-11 Multi-Stage Fracture 3979.60 4023.00 0
2018-10-12 Perforation 3972.50 3973.00 8
2018-10-12 Perforation 3965.30 3965.80 8
2018-10-12 Perforation 3958.20 3958.70 10
2018-10-12 Perforation 3951.00 3951.50 10
2018-10-12 Perforation 3943.90 3944.40 10
2018-10-12 Perforation 3936.70 3937.20 10
2018-10-12 Perforation 3929.60 3930.10 12
2018-10-12 Multi-Stage Fracture 3929.60 3973.00 0
2018-09-02 Perforation 6224.80 6225.30 10
2018-09-02 Perforation 6217.60 6218.10 8
2018-09-02 Perforation 6210.50 6211.00 8
2018-09-02 Perforation 6203.30 6203.80 8
2018-09-02 Perforation 6196.20 6196.70 8
2018-09-02 Perforation 6189.00 6189.50 8
2018-09-02 Perforation 6181.90 6182.40 6
2018-09-03 Multi-Stage Fracture 6181.90 6225.30 0
2018-09-03 Perforation 6174.70 6175.20 10
2018-08-20 Perforation 6446.40 6446.90 12
2018-09-03 Perforation 6167.60 6168.10 8
2018-09-03 Perforation 6160.40 6160.90 8
2018-09-03 Perforation 6153.30 6153.80 8
2018-09-03 Perforation 6146.10 6146.60 8
2018-09-03 Perforation 6139.00 6139.50 8
2018-09-03 Perforation 6131.80 6132.30 6
2018-09-03 Multi-Stage Fracture 6131.80 6175.20 0
2018-09-04 Perforation 6124.70 6125.20 10
2018-09-04 Perforation 6117.50 6118.00 8
2018-09-04 Perforation 6110.40 6110.90 8
2018-08-20 Perforation 6439.30 6439.80 12
2018-09-04 Perforation 6103.20 6103.70 8
2018-09-04 Perforation 6096.10 6096.60 8
2018-09-04 Perforation 6088.90 6089.40 8
2018-09-04 Perforation 6081.80 6082.30 6
2018-09-04 Multi-Stage Fracture 6081.80 6125.20 0
2018-09-04 Perforation 6074.60 6075.10 10
2018-09-04 Perforation 6067.50 6068.00 8
2018-09-04 Perforation 6060.30 6060.80 8
2018-09-04 Perforation 6053.20 6053.70 8
2018-09-04 Perforation 6046.00 6046.50 8
2018-08-20 Perforation 6432.10 6432.60 12
2018-09-04 Perforation 6038.90 6039.40 8
2018-09-04 Perforation 6031.70 6032.20 6
2018-09-05 Multi-Stage Fracture 6031.70 6075.10 0
2018-09-06 Perforation 6024.60 6025.10 10
2018-09-06 Perforation 6017.40 6017.90 8
2018-09-06 Perforation 6010.30 6010.80 8
2018-09-06 Perforation 6003.10 6003.60 8
2018-09-06 Perforation 5996.00 5996.50 8
2018-09-06 Perforation 5988.80 5989.30 8
2018-09-06 Perforation 5981.70 5982.20 6
2018-08-28 Multi-Stage Fracture 6432.10 6475.50 0
2018-09-06 Multi-Stage Fracture 5981.70 6025.10 0
2018-09-07 Perforation 5974.50 5975.00 12
2018-09-07 Perforation 5967.40 5967.90 10
2018-09-07 Perforation 5960.20 5960.70 10
2018-09-07 Perforation 5953.10 5953.60 10
2018-09-07 Perforation 5945.90 5946.40 10
2018-09-07 Perforation 5938.80 5939.30 8
2018-09-07 Perforation 5931.60 5932.10 8
2018-09-07 Multi-Stage Fracture 5931.60 5975.00 0
2018-09-07 Perforation 5924.50 5925.00 12
2018-08-29 Perforation 6425.00 6425.50 10
2018-09-07 Perforation 5917.30 5917.80 10
2018-09-07 Perforation 5910.20 5910.70 10
2018-09-07 Perforation 5903.00 5903.50 10
2018-09-07 Perforation 5895.90 5896.40 10
2018-09-07 Perforation 5888.70 5889.20 8
2018-09-07 Perforation 5881.60 5882.10 8
2018-09-08 Multi-Stage Fracture 5881.60 5925.00 0
2018-09-08 Perforation 5874.40 5874.90 12
2018-09-08 Perforation 5867.30 5867.80 10
2018-09-08 Perforation 5860.10 5860.60 10

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-08-28 2018-10-12 3,696 76,339 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water 7732-18-5 100 89.1422 N/A
FRAC SAND. 40/70 WHITE BJ Services Crystalline Silica (Quartz) 14808-60-7 100 8.5661 N/A
FRAC SAND. 50/140 CANADIAN BJ Services Crystalline Silica (Quartz) 14808-60-7 100 1.7724 N/A
Hydrochloric Acid 15% BJ Services Acid Hydrochloric acid 7647-01-0 100 0.3205 N/A
Water 7732-18-5 100 0.3205 N/A
Alpha 544 BJ Services Bactericide/Biocide 2.2-Dibromo-3-nitrilopropionamide 10222-01-2 100 0.0089 N/A
Dibromoacetonitrile 3252-43-5 100 0.0089 N/A
Polyethylene Glycol 25322-68-3 100 0.0089 N/A
Sodium Bromide 7647-15-6 100 0.0089 N/A
Water 7732-18-5 100 0.0089 N/A
GBW-41LW BJ Services Breaker Hydrogen Peroxide 7722-84-1 100 0.0242 N/A
Methanol 67-56-1 100 0.0242 N/A
Non-hazardous Not Available 100 0.0242 N/A
High Perm EP BJ Services Breaker Ammonium persulphate 7727-54-0 100 0.0013 N/A
BF-9L BJ Services Buffer potassium carbonate 584-08-7 100 0.0577 N/A
Potassium hydroxide 1310-58-3 100 0.0577 N/A
Water 7732-18-5 100 0.0577 N/A
CI-27 BJ Services Corrosion Inhibitor Fatty acids 61790-12-3 100 0.0017 N/A
Methanol 67-56-1 100 0.0017 N/A
Modified thiourea polymer 68527-49-1 100 0.0017 N/A
Olefin 64743-02-8 100 0.0017 N/A
Polyoxyalkylenes 68951-67-7 100 0.0017 N/A
Propargyl alcohol 107-19-7 100 0.0017 N/A
XLW-30SR BJ Services Crosslinker Acrylic Polymer 97953-25-8 100 0.0464 N/A
Ethylene glycol 107-21-1 100 0.0464 N/A
Inorganic Borates 1319-33-1 100 0.0464 N/A
Polysaccharide 11138-66-2 100 0.0464 N/A
Water 7732-18-5 100 0.0464 N/A
FP-12L BJ Services Defoamer Methylcellulose 9004-67-5 100 0 N/A
Non-hazardous Not Available 100 0 N/A
Octamethylcyclotetrasiloxane 556-67-2 100 0.0001 N/A
Polydimethylsiloxane 63148-62-9 100 0 N/A
Water 7732-18-5 100 0 N/A
D-3 BJ Services Demulsifier Ethoxylated alcohol. branched 78330-19-5 100 0.0014 N/A
Isopropanol 67-63-0 100 0.0014 N/A
Methanol 67-56-1 100 0.0014 N/A
XFrac-09 BJ Services Friction Reducer 1.2 Propanediol carbonate 108-32-7 100 0.1169 N/A
Distillates (petroleum) hydrotreated light paraffinic 64742-55-8 100 0.1169 N/A
Lecitihins. soya 8030-76-0 100 0.1169 N/A
polymer Trade Secret 100 0.1169 N/A
Water 7732-18-5 100 0.1169 N/A
GW-3 BJ Services Gelling Agent Guar Gum 9000-30-0 100 0.0461 N/A
Ferrotrol 800 BJ Services Iron Control Trisodium nitrilotriacetate monohydrate 18662-53-8 100 0.003 N/A
ScaleTrol 14 BJ Services Scale Inhibitor Phosphinocarboxylic acid copolymer 110224-99-2 100 0.0222 N/A
Water 7732-18-5 100 0.0222 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2018-08-16 2018-10-12 Surface Water - Runoff 75714

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2018 397 0.0 0.0 0.0
2019 8290 0.0 0.0 0.0
2020 2138 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-04-04 No Incident Encountered 0.00 0.00
2018-10-28 No Incident Encountered 0.00 0.00

For data sources see[10]

References