X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0625241601000

Well Details

Well ID: 0625241601000
Loading map...
Location: 00/01-16-062-24W5/0
Location Alias: 00/01-16-62-24 W5M
Location Alias 2: 00/01-16-062-24 W5/00
Country: Canada
Province: Alberta
Township: 062
Meridian: 5
Range: 24
Section: 16
County/Municipality: Municipal District of Greenview No. 16
Well Name: ECA HZ WAHIGAN 1-16-62-24
Operator Name: Ovintiv Canada ULC
License Number: 0478427
License Date: 2015-12-11
License Status: Issued
Spud Date: 2016-02-04
Final Drill Date: 2016-03-02
Well Total Depth: 5930.00 m
Surface Hole Latitude: 54.368316
Surface Hole Longitude: -117.555619

For data sources see[1][2]

Well History

Date Event
2015-12-11 Obtained License
2016-02-02 Well Log Performed
2016-02-05 Surface Casing Operation Performed
2016-02-08 Direction Drilling Operation Performed - Deviate
2016-02-19 Intermediate Casing Operation Performed
2016-02-19 Well Log Performed
2016-02-26 Direction Drilling Operation Performed - Horizontal
2016-02-26 Well Log Performed
2016-03-02 Finished Drilling
2016-03-02 Well Mode changed to Drilled and Cased
2016-03-04 Production Casing Operation Performed
2016-03-04 Well Log Performed
2016-03-08 Well Log Performed
2016-03-09 Rig Released
2016-05-20 Perforation Treatment Performed - Jet Perforation
2016-05-31 Perforation Treatment Performed - Jet Perforation
2016-05-31 Perforation Treatment Performed - Multi-Stage Fracture
2016-06-01 Perforation Treatment Performed - Fractured
2016-06-01 Perforation Treatment Performed - Jet Perforation
2016-06-02 Perforation Treatment Performed - Fractured
2016-06-02 Perforation Treatment Performed - Jet Perforation
2016-06-03 Perforation Treatment Performed - Fractured
2016-06-03 Perforation Treatment Performed - Jet Perforation
2016-06-04 Perforation Treatment Performed - Fractured
2016-06-04 Perforation Treatment Performed - Jet Perforation
2016-06-05 Perforation Treatment Performed - Fractured
2016-06-05 Perforation Treatment Performed - Jet Perforation
2016-06-06 Perforation Treatment Performed - Fractured
2016-06-06 Perforation Treatment Performed - Jet Perforation
2016-06-07 Perforation Treatment Performed - Fractured
2016-06-07 Perforation Treatment Performed - Jet Perforation
2016-06-08 Perforation Treatment Performed - Fractured
2016-06-08 Perforation Treatment Performed - Jet Perforation
2016-06-09 Perforation Treatment Performed - Fractured
2016-06-09 Perforation Treatment Performed - Jet Perforation
2016-06-10 Perforation Treatment Performed - Fractured
2016-06-10 Perforation Treatment Performed - Jet Perforation
2016-06-11 Perforation Treatment Performed - Fractured
2016-06-11 Perforation Treatment Performed - Jet Perforation
2016-06-12 Perforation Treatment Performed - Fractured
2016-06-12 Perforation Treatment Performed - Jet Perforation
2016-06-13 Perforation Treatment Performed - Fractured
2016-06-13 Perforation Treatment Performed - Jet Perforation
2016-06-14 Perforation Treatment Performed - Fractured
2016-06-14 Perforation Treatment Performed - Jet Perforation
2016-06-15 Perforation Treatment Performed - Fractured
2016-07-30 Well Began Production
2016-07-30 Well Fluid changed to Shale Gas Only
2016-07-30 Well Mode changed to Flowing
2017-05-29 Well Fluid changed to Shale Gas Only
2017-05-29 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2016-02-04 Precision Drilling Corporation 571 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2016-02-08 1492.00 Deviate (5 - 79 degrees)
2016-02-26 3977.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2016-05-20 Perforation 5822.00 5823.00 20
2016-06-01 Perforation 5681.00 5682.00 20
2016-06-11 Perforation 4412.00 4413.00 15
2016-06-11 Perforation 4430.00 4431.00 15
2016-06-11 Perforation 4448.00 4449.00 15
2016-06-11 Perforation 4465.00 4466.00 15
2016-06-11 Perforation 4483.00 4484.00 20
2016-06-11 Perforation 4500.00 4501.00 20
2016-06-11 Perforation 4518.00 4519.00 20
2016-06-11 Perforation 4536.00 4537.00 20
2016-06-11 Fracture 4412.00 4466.00 0
2016-06-11 Fracture 4483.00 4537.00 0
2016-06-01 Perforation 5699.00 5700.00 20
2016-06-12 Perforation 4201.00 4202.00 15
2016-06-12 Perforation 4218.00 4219.00 15
2016-06-12 Perforation 4236.00 4237.00 15
2016-06-12 Perforation 4254.00 4255.00 15
2016-06-12 Perforation 4271.00 4272.00 15
2016-06-12 Perforation 4289.00 4290.00 15
2016-06-12 Perforation 4307.00 4308.00 15
2016-06-12 Perforation 4324.00 4325.00 15
2016-06-12 Fracture 4271.00 4325.00 0
2016-06-12 Fracture 4342.00 4396.00 0
2016-06-01 Perforation 5716.00 5717.00 20
2016-06-13 Perforation 4060.00 4061.00 15
2016-06-13 Perforation 4078.00 4079.00 15
2016-06-13 Perforation 4095.00 4096.00 15
2016-06-13 Perforation 4113.00 4114.00 15
2016-06-13 Perforation 4130.00 4131.00 15
2016-06-13 Perforation 4148.00 4149.00 15
2016-06-13 Perforation 4166.00 4167.00 15
2016-06-13 Perforation 4183.00 4184.00 15
2016-06-13 Fracture 4130.00 4184.00 0
2016-06-13 Fracture 4201.00 4255.00 0
2016-06-01 Perforation 5734.00 5735.00 20
2016-06-14 Perforation 3919.00 3920.00 15
2016-06-14 Perforation 3937.00 3938.00 15
2016-06-14 Perforation 3954.00 3955.00 15
2016-06-14 Perforation 3972.00 3973.00 15
2016-06-14 Perforation 3989.00 3990.00 15
2016-06-14 Perforation 4007.00 4008.00 15
2016-06-14 Perforation 4025.00 4026.00 15
2016-06-14 Perforation 4042.00 4043.00 15
2016-06-14 Fracture 3989.00 4043.00 0
2016-06-14 Fracture 4060.00 4114.00 0
2016-06-01 Fracture 5681.00 5735.00 0
2016-06-15 Fracture 3919.00 3973.00 0
2016-06-01 Fracture 5752.00 5806.00 0
2016-06-02 Perforation 5540.00 5541.00 20
2016-06-02 Perforation 5558.00 5559.00 20
2016-06-02 Perforation 5575.00 5576.00 20
2016-06-02 Perforation 5593.00 5594.00 20
2016-05-20 Perforation 5840.00 5841.00 20
2016-06-02 Perforation 5611.00 5612.00 20
2016-06-02 Perforation 5628.00 5629.00 20
2016-06-02 Perforation 5646.00 5647.00 20
2016-06-02 Perforation 5664.00 5665.00 20
2016-06-02 Fracture 5611.00 5665.00 0
2016-06-03 Perforation 5434.00 5435.00 20
2016-06-03 Perforation 5452.00 5453.00 20
2016-06-03 Perforation 5470.00 5471.00 20
2016-06-03 Perforation 5487.00 5488.00 20
2016-06-03 Perforation 5505.00 5506.00 20
2016-05-20 Perforation 5857.00 5858.00 20
2016-06-03 Perforation 5523.00 5524.00 20
2016-06-03 Fracture 5470.00 5524.00 0
2016-06-03 Fracture 5540.00 5594.00 0
2016-06-04 Perforation 5329.00 5330.00 20
2016-06-04 Perforation 5346.00 5347.00 20
2016-06-04 Perforation 5364.00 5365.00 20
2016-06-04 Perforation 5382.00 5383.00 20
2016-06-04 Perforation 5399.00 5400.00 20
2016-06-04 Perforation 5417.00 5418.00 20
2016-06-04 Fracture 5329.00 5383.00 0
2016-05-20 Perforation 5875.00 5876.00 20
2016-06-04 Fracture 5399.00 5453.00 0
2016-06-05 Perforation 5188.00 5189.00 20
2016-06-05 Perforation 5205.00 5206.00 20
2016-06-05 Perforation 5223.00 5224.00 20
2016-06-05 Perforation 5241.00 5242.00 20
2016-06-05 Perforation 5258.00 5259.00 20
2016-06-05 Perforation 5276.00 5277.00 20
2016-06-05 Perforation 5293.00 5294.00 20
2016-06-05 Perforation 5311.00 5312.00 20
2016-06-05 Fracture 5258.00 5312.00 0
2016-05-31 Perforation 5752.00 5753.00 20
2016-06-06 Perforation 5117.00 5118.00 20
2016-06-06 Perforation 5135.00 5136.00 20
2016-06-06 Perforation 5152.00 5153.00 20
2016-06-06 Perforation 5170.00 5171.00 20
2016-06-06 Fracture 5188.00 5242.00 0
2016-06-07 Perforation 4976.00 4977.00 20
2016-06-07 Perforation 4994.00 4995.00 20
2016-06-07 Perforation 5011.00 5012.00 20
2016-06-07 Perforation 5029.00 5030.00 20
2016-06-07 Perforation 5047.00 5048.00 20
2016-05-31 Perforation 5769.00 5770.00 20
2016-06-07 Perforation 5064.00 5065.00 20
2016-06-07 Perforation 5082.00 5083.00 20
2016-06-07 Perforation 5100.00 5101.00 20
2016-06-07 Fracture 5047.00 5101.00 0
2016-06-07 Fracture 5117.00 5171.00 0
2016-06-08 Perforation 4835.00 4836.00 20
2016-06-08 Perforation 4853.00 4854.00 20
2016-06-08 Perforation 4871.00 4872.00 20
2016-06-08 Perforation 4888.00 4889.00 20
2016-06-08 Perforation 4906.00 4907.00 20
2016-05-31 Perforation 5787.00 5788.00 20
2016-06-08 Perforation 4923.00 4924.00 20
2016-06-08 Perforation 4941.00 4942.00 20
2016-06-08 Perforation 4959.00 4960.00 20
2016-06-08 Fracture 4835.00 4889.00 0
2016-06-08 Fracture 4906.00 4960.00 0
2016-06-08 Fracture 4976.00 5030.00 0
2016-06-09 Perforation 4694.00 4695.00 20
2016-06-09 Perforation 4712.00 4713.00 20
2016-06-09 Perforation 4730.00 4731.00 20
2016-06-09 Perforation 4747.00 4748.00 20
2016-05-31 Perforation 5805.00 5806.00 20
2016-06-09 Perforation 4765.00 4766.00 20
2016-06-09 Perforation 4782.00 4783.00 20
2016-06-09 Perforation 4800.00 4801.00 20
2016-06-09 Perforation 4818.00 4819.00 20
2016-06-09 Fracture 4694.00 4748.00 0
2016-06-09 Fracture 4765.00 4819.00 0
2016-06-10 Perforation 4553.00 4554.00 20
2016-06-10 Perforation 4571.00 4572.00 20
2016-06-10 Perforation 4589.00 4590.00 20
2016-06-10 Perforation 4606.00 4607.00 20
2016-05-31 Multi-Stage Fracture 5822.00 5908.80 0
2016-06-10 Perforation 4624.00 4625.00 20
2016-06-10 Perforation 4641.00 4642.00 20
2016-06-10 Perforation 4659.00 4660.00 20
2016-06-10 Perforation 4677.00 4678.00 20
2016-06-10 Fracture 4553.00 4607.00 0
2016-06-10 Fracture 4624.00 4678.00 0
2016-06-11 Perforation 4342.00 4343.00 15
2016-06-11 Perforation 4359.00 4360.00 15
2016-06-11 Perforation 4377.00 4378.00 15
2016-06-11 Perforation 4395.00 4396.00 15

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2016-05-31 2016-06-15 3,752 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water (Including Mix Water Supplied by Client)* 7732-18-5 100 85.1958 N/A
Water. 15% HCL. Slick Water. YF120Flex Source Energy Services Quartz. Crystalline silica 14808-60-7 100 12.9288 N/A
Water. 15% HCL. Slick Water. YF120Flex LaPrairie Quartz. Crystalline silica 14808-60-7 100 1.5621 N/A
Water. 15% HCL. Slick Water. YF120Flex Schlumberger Energizing Fluid Alcohols. C14-15. ethoxylated (7EO) 68951-67-7 100 0.0001 N/A
Diammonium peroxodisulphate 7727-54-0 100 0.003 N/A
Ethylene Glycol 107-21-1 100 0.0028 N/A
Fatty acids. tall-oil 61790-12-3 100 0.0005 N/A
Formaldehyde 50-00-0 100 0 N/A
Formic acid 64-18-6 100 0.0019 N/A
Glycerol 56-81-5 100 0.0101 N/A
Glycine. n-[2-[bis(carboxymethyl)amino]ethyl]-n-(2-hydroxye
t
139-89-9 100 0.0013 N/A
Guar gum 9000-30-0 100 0.0872 N/A
Hexadec-1-ene 629-73-2 100 0 N/A
Hydrochloric acid 7647-01-0 100 0.0767 N/A
Magnesium silicate hydrate (talc) 14807-96-6 100 0 N/A
Methanol 67-56-1 100 0.0007 N/A
Non-crystalline silica (impurity) 7631-86-9 100 0.0002 N/A
Octadec-1-ene 112-88-9 100 0 N/A
poly(tetrafluoroethylene) 9002-84-0 100 0 N/A
Potassium borate 1332-77-0 100 0.031 N/A
Potassium hydroxide 1310-58-3 100 0.0114 N/A
Propargyl alcohol 107-19-7 100 0.0001 N/A
Sodium hydroxide 1310-73-2 100 0 N/A
Sodium salt of Polymaleic Acid Copolymer 111560-38-4 100 0.0012 N/A
Thiourea. polymer with formaldehyde and 1-phenylethanone 68527-49-1 100 0.0004 N/A
Trisodium nitrilotriacetate (impurity) 5064-31-3 100 0 N/A
Vinylidene chloride/methylacrylate copolymer 25038-72-6 100 0.0006 N/A
FE 73W EFOS Polymer LLC Friction Reducer Alocohols. C12-16. ethoxylated propoxylated 68213-24-1 100 0.0857 N/A
Distillates (pertoleum). hydrotreated light 64742-47-8 100 0.0857 N/A
Ethylene Glycol 107-21-1 100 0.0857 N/A
Non-Hazardous Not Available 100 0.0857 N/A
Polyoxyethylene alkyl ether phosphate 68585-36-4 100 0.0857 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2016-03-10 2016-06-22 Groundwater - Non-saline less than or equal to 150m deep 13246
2016-03-09 2016-03-09 Central Water Distribution Facility 16993
2016-03-09 2016-03-09 Central Water Distribution Facility 2250
2016-05-12 2016-06-09 Oilfield Produced Water 650
2016-06-01 2016-06-13 Oilfield Produced Water 294
2016-05-13 2016-05-13 Oilfield Produced Water 11

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2016 3500 0.0 0.0 0.0
2017 8643 0.0 0.0 0.0
2018 8658 0.0 0.0 0.0
2019 7803 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2016-03-09 No Incident Encountered 0.00 0.00
2016-06-21 No Incident Encountered 0.00 0.00

For data sources see[10]

References