X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0625221301040

Well Details

Well ID: 0625221301040
Loading map...
Location: 04/01-13-062-22W5/0
Location Alias: 04/01-13-62-22 W5M
Location Alias 2: 04/01-13-062-22 W5/00
Country: Canada
Province: Alberta
Township: 062
Meridian: 5
Range: 22
Section: 13
County/Municipality: Municipal District of Greenview No. 16
Well Name: CHEVRON 104 HZ WAHIGAN 1-13-62-22
Operator Name: Chevron Canada Limited
License Number: 0492652
License Date: 2018-12-07
License Status: Amended
Spud Date: 2019-07-01
Final Drill Date: 2019-10-01
Well Total Depth: 5688.00 m
Surface Hole Latitude: 54.340472
Surface Hole Longitude: -117.137777

For data sources see[1][2]

Well History

Date Event
2018-12-07 Obtained License
2019-07-01 Set Surface
2019-07-02 Direction Drilling Operation Performed - Deviate
2019-07-02 Surface Casing Operation Performed
2019-07-18 Drill To LD
2019-07-22 Well Log Performed
2019-07-23 Intermediate Casing Operation Performed
2019-09-24 Drill To LD
2019-09-26 Direction Drilling Operation Performed - Horizontal
2019-10-01 Finished Drilling
2019-10-01 Well Log Performed
2019-10-01 Well Mode changed to Drilled and Cased
2019-10-03 Well Log Performed
2019-10-04 Production Casing Operation Performed
2019-10-04 Rig Released
2019-11-21 Perforation Treatment Performed - Jet Perforation
2019-12-04 Perforation Treatment Performed - Jet Perforation
2019-12-04 Perforation Treatment Performed - Multi-Stage Fracture
2019-12-05 Perforation Treatment Performed - Jet Perforation
2019-12-05 Perforation Treatment Performed - Multi-Stage Fracture
2019-12-06 Perforation Treatment Performed - Jet Perforation
2019-12-06 Perforation Treatment Performed - Multi-Stage Fracture
2019-12-09 Perforation Treatment Performed - Jet Perforation
2019-12-09 Perforation Treatment Performed - Multi-Stage Fracture
2019-12-10 Perforation Treatment Performed - Jet Perforation
2019-12-10 Perforation Treatment Performed - Multi-Stage Fracture
2019-12-11 Perforation Treatment Performed - Jet Perforation
2019-12-11 Perforation Treatment Performed - Multi-Stage Fracture
2019-12-12 Perforation Treatment Performed - Jet Perforation
2019-12-14 Perforation Treatment Performed - Jet Perforation
2019-12-14 Perforation Treatment Performed - Multi-Stage Fracture
2019-12-15 Perforation Treatment Performed - Jet Perforation
2019-12-15 Perforation Treatment Performed - Multi-Stage Fracture
2019-12-16 Perforation Treatment Performed - Jet Perforation
2019-12-16 Perforation Treatment Performed - Multi-Stage Fracture
2019-12-18 Perforation Treatment Performed - Jet Perforation
2019-12-18 Perforation Treatment Performed - Multi-Stage Fracture
2019-12-19 Perforation Treatment Performed - Jet Perforation
2019-12-19 Perforation Treatment Performed - Multi-Stage Fracture
2019-12-20 Perforation Treatment Performed - Jet Perforation
2019-12-20 Perforation Treatment Performed - Multi-Stage Fracture
2019-12-21 Perforation Treatment Performed - Multi-Stage Fracture
2019-12-22 Perforation Treatment Performed - Jet Perforation
2019-12-22 Perforation Treatment Performed - Multi-Stage Fracture
2019-12-23 Perforation Treatment Performed - Jet Perforation
2019-12-23 Perforation Treatment Performed - Multi-Stage Fracture
2019-12-24 Perforation Treatment Performed - Jet Perforation
2019-12-24 Perforation Treatment Performed - Multi-Stage Fracture
2019-12-25 Perforation Treatment Performed - Multi-Stage Fracture
2020-03-25 Well Began Production
2020-03-25 Well Fluid changed to Shale Gas Only
2020-03-25 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2019-07-01 Ensign Drilling Inc. 785 Set Surface
2019-07-18 Ensign Drilling Inc. 785 Drill To LD
2019-09-24 Ensign Drilling Inc. 785 Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2019-07-02 167.20 Deviate (5 - 79 degrees)
2019-09-26 3540.80 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2019-11-21 Perforation 5599.20 5599.70 12
2019-12-04 Perforation 5481.20 5481.70 10
2019-12-16 Perforation 4345.00 4345.50 12
2019-12-16 Perforation 4330.30 4330.80 10
2019-12-16 Perforation 4315.50 4316.00 10
2019-12-16 Perforation 4300.80 4301.30 8
2019-12-18 Multi-Stage Fracture 4300.80 4374.80 0
2019-12-18 Perforation 4285.80 4286.30 14
2019-12-18 Perforation 4271.30 4271.80 12
2019-12-18 Perforation 4256.50 4257.00 12
2019-12-18 Perforation 4241.80 4242.30 10
2019-12-18 Perforation 4227.00 4227.50 10
2019-12-04 Perforation 5466.40 5466.90 10
2019-12-18 Perforation 4212.30 4212.80 8
2019-12-18 Multi-Stage Fracture 4212.30 4286.30 0
2019-12-18 Perforation 4197.30 4197.80 14
2019-12-18 Perforation 4182.70 4183.20 12
2019-12-18 Perforation 4168.00 4168.50 12
2019-12-18 Perforation 4153.20 4153.70 10
2019-12-18 Perforation 4138.50 4139.00 10
2019-12-18 Perforation 4123.70 4124.20 8
2019-12-19 Multi-Stage Fracture 4123.70 4197.80 0
2019-12-19 Perforation 4108.70 4109.20 14
2019-12-04 Perforation 5451.70 5452.20 8
2019-12-19 Perforation 4094.20 4094.70 12
2019-12-19 Perforation 4079.50 4080.00 12
2019-12-19 Perforation 4064.70 4065.20 10
2019-12-19 Perforation 4049.90 4050.40 10
2019-12-19 Perforation 4035.20 4035.70 8
2019-12-19 Multi-Stage Fracture 4035.20 4109.20 0
2019-12-20 Perforation 4020.20 4020.70 14
2019-12-20 Perforation 4005.70 4006.20 12
2019-12-20 Perforation 3990.90 3991.40 12
2019-12-20 Perforation 3976.20 3976.70 10
2019-12-05 Multi-Stage Fracture 5451.70 5525.70 0
2019-12-20 Perforation 3961.40 3961.90 10
2019-12-20 Perforation 3946.70 3947.20 8
2019-12-20 Multi-Stage Fracture 3946.70 4020.70 0
2019-12-20 Perforation 3931.70 3932.20 14
2019-12-20 Perforation 3917.10 3917.60 12
2019-12-20 Perforation 3902.40 3902.90 12
2019-12-20 Perforation 3887.60 3888.10 10
2019-12-20 Perforation 3872.90 3873.40 10
2019-12-20 Perforation 3858.10 3858.60 8
2019-12-21 Multi-Stage Fracture 3858.10 3932.20 0
2019-12-05 Perforation 5436.70 5437.20 14
2019-12-22 Perforation 3843.10 3843.60 14
2019-12-22 Perforation 3828.60 3829.10 12
2019-12-22 Perforation 3813.90 3814.40 12
2019-12-22 Perforation 3799.10 3799.60 10
2019-12-22 Perforation 3784.30 3784.80 10
2019-12-22 Perforation 3769.60 3770.10 8
2019-12-22 Multi-Stage Fracture 3769.60 3843.60 0
2019-12-23 Perforation 3754.60 3755.10 14
2019-12-23 Perforation 3740.10 3740.60 12
2019-12-23 Perforation 3725.30 3725.80 12
2019-12-05 Perforation 5422.20 5422.70 12
2019-12-23 Perforation 3710.60 3711.10 10
2019-12-23 Perforation 3695.80 3696.30 10
2019-12-23 Perforation 3681.10 3681.60 8
2019-12-23 Multi-Stage Fracture 3681.10 3755.10 0
2019-12-23 Perforation 3666.10 3666.60 14
2019-12-23 Perforation 3651.60 3652.10 12
2019-12-23 Perforation 3636.80 3637.30 12
2019-12-23 Perforation 3622.00 3622.50 10
2019-12-23 Perforation 3607.30 3607.80 10
2019-12-23 Perforation 3592.50 3593.00 8
2019-12-05 Perforation 5407.40 5407.90 12
2019-12-24 Multi-Stage Fracture 3592.50 3666.60 0
2019-12-24 Perforation 3577.50 3578.00 14
2019-12-24 Perforation 3563.00 3563.50 12
2019-12-24 Perforation 3548.30 3548.80 12
2019-12-24 Perforation 3533.50 3534.00 10
2019-12-24 Perforation 3518.80 3519.30 10
2019-12-24 Perforation 3504.00 3504.50 8
2019-12-25 Multi-Stage Fracture 3504.00 3578.00 0
2019-12-05 Perforation 5392.70 5393.20 10
2019-12-05 Perforation 5377.90 5378.40 10
2019-12-05 Perforation 5363.20 5363.70 8
2019-11-21 Perforation 5584.50 5585.00 12
2019-12-05 Multi-Stage Fracture 5363.20 5437.20 0
2019-12-06 Perforation 5348.20 5348.70 14
2019-12-06 Perforation 5333.70 5334.20 12
2019-12-06 Perforation 5318.90 5319.40 12
2019-12-06 Perforation 5304.10 5304.60 10
2019-12-06 Perforation 5289.40 5289.90 10
2019-12-06 Perforation 5274.60 5275.10 8
2019-12-06 Multi-Stage Fracture 5274.60 5348.70 0
2019-12-06 Perforation 5259.60 5260.10 14
2019-12-06 Perforation 5245.10 5245.60 12
2019-11-21 Perforation 5569.70 5570.20 12
2019-12-06 Perforation 5230.40 5230.90 12
2019-12-06 Perforation 5215.60 5216.10 10
2019-12-06 Perforation 5200.90 5201.40 10
2019-12-06 Perforation 5186.10 5186.60 8
2019-12-09 Multi-Stage Fracture 5186.10 5260.10 0
2019-12-09 Perforation 5171.10 5171.60 14
2019-12-09 Perforation 5156.60 5157.10 12
2019-12-09 Perforation 5141.80 5142.30 12
2019-12-09 Perforation 5127.10 5127.60 10
2019-12-09 Perforation 5112.30 5112.80 10
2019-11-21 Perforation 5555.00 5555.50 12
2019-12-09 Perforation 5097.60 5098.10 8
2019-12-10 Multi-Stage Fracture 5097.60 5171.60 0
2019-12-10 Perforation 5082.60 5083.10 14
2019-12-10 Perforation 5068.10 5068.60 12
2019-12-10 Perforation 5053.30 5053.80 12
2019-12-10 Perforation 5038.50 5039.00 10
2019-12-10 Perforation 5023.80 5024.30 10
2019-12-10 Perforation 5009.00 5009.50 8
2019-12-10 Multi-Stage Fracture 5009.00 5083.10 0
2019-12-10 Perforation 4994.00 4994.50 14
2019-11-21 Perforation 5540.20 5540.70 12
2019-12-10 Perforation 4979.50 4980.00 12
2019-12-10 Perforation 4964.80 4965.30 12
2019-12-10 Perforation 4950.00 4950.50 10
2019-12-10 Perforation 4935.30 4935.80 10
2019-12-10 Perforation 4920.50 4921.00 8
2019-12-11 Multi-Stage Fracture 4920.50 4994.50 0
2019-12-11 Perforation 4905.50 4906.00 14
2019-12-11 Perforation 4891.00 4891.50 12
2019-12-11 Perforation 4876.20 4876.70 12
2019-12-11 Perforation 4861.50 4862.00 10
2019-12-04 Multi-Stage Fracture 5540.20 5599.70 0
2019-12-11 Perforation 4846.70 4847.20 10
2019-12-11 Perforation 4832.00 4832.50 8
2019-12-11 Multi-Stage Fracture 4832.00 4906.00 0
2019-12-12 Perforation 4817.00 4817.50 14
2019-12-12 Perforation 4802.50 4803.00 12
2019-12-12 Perforation 4787.70 4788.20 12
2019-12-12 Perforation 4773.00 4773.50 10
2019-12-12 Perforation 4758.20 4758.70 10
2019-12-12 Perforation 4743.40 4743.90 8
2019-12-14 Multi-Stage Fracture 4743.40 4817.50 0
2019-12-04 Perforation 5525.20 5525.70 14
2019-12-14 Perforation 4728.40 4728.90 14
2019-12-14 Perforation 4713.90 4714.40 12
2019-12-14 Perforation 4699.20 4699.70 12
2019-12-14 Perforation 4684.40 4684.90 10
2019-12-14 Perforation 4669.70 4670.20 10
2019-12-14 Perforation 4654.90 4655.40 8
2019-12-14 Multi-Stage Fracture 4654.90 4728.90 0
2019-12-14 Perforation 4639.90 4640.40 14
2019-12-14 Perforation 4625.40 4625.90 12
2019-12-14 Perforation 4610.60 4611.10 12
2019-12-04 Perforation 5510.70 5511.20 12
2019-12-14 Perforation 4595.90 4596.40 10
2019-12-14 Perforation 4581.10 4581.60 10
2019-12-14 Perforation 4566.40 4566.90 8
2019-12-15 Multi-Stage Fracture 4566.40 4640.40 0
2019-12-15 Perforation 4551.40 4551.90 14
2019-12-15 Perforation 4536.90 4537.40 12
2019-12-15 Perforation 4522.10 4522.60 12
2019-12-15 Perforation 4507.40 4507.90 10
2019-12-15 Perforation 4492.60 4493.10 10
2019-12-15 Perforation 4477.80 4478.30 8
2019-12-04 Perforation 5496.00 5496.50 12
2019-12-15 Multi-Stage Fracture 4477.80 4551.90 0
2019-12-16 Perforation 4462.80 4463.30 14
2019-12-16 Perforation 4448.30 4448.80 12
2019-12-16 Perforation 4433.60 4434.10 12
2019-12-16 Perforation 4418.80 4419.30 10
2019-12-16 Perforation 4404.10 4404.60 10
2019-12-16 Perforation 4389.30 4389.80 8
2019-12-16 Multi-Stage Fracture 4389.30 4463.30 0
2019-12-16 Perforation 4374.30 4374.80 14
2019-12-16 Perforation 4359.80 4360.30 12

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2020 164 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-10-01 No Incident Encountered 0.00 0.00
2020-02-13 No Incident Encountered 0.00 0.00
2020-01-19 No Incident Encountered 0.00 0.00

For data sources see[8]

References