If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0625221301040 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.340472,"lon":-117.137777,"icon":""}]} |
Location: 04/01-13-062-22W5/0 | |
Location Alias: 04/01-13-62-22 W5M | |
Location Alias 2: 04/01-13-062-22 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 062 | |
Meridian: 5 | |
Range: 22 | |
Section: 13 | |
County/Municipality: Municipal District of Greenview No. 16 | |
Well Name: CHEVRON 104 HZ WAHIGAN 1-13-62-22 | |
Operator Name: Chevron Canada Limited | |
License Number: 0492652 | |
License Date: 2018-12-07 | |
License Status: Amended | |
Spud Date: 2019-07-01 | |
Final Drill Date: 2019-10-01 | |
Well Total Depth: 5688.00 m | |
Surface Hole Latitude: 54.340472 | |
Surface Hole Longitude: -117.137777 |
Date | Event |
---|---|
2018-12-07 | Obtained License |
2019-07-01 | Set Surface |
2019-07-02 | Direction Drilling Operation Performed - Deviate |
2019-07-02 | Surface Casing Operation Performed |
2019-07-18 | Drill To LD |
2019-07-22 | Well Log Performed |
2019-07-23 | Intermediate Casing Operation Performed |
2019-09-24 | Drill To LD |
2019-09-26 | Direction Drilling Operation Performed - Horizontal |
2019-10-01 | Finished Drilling |
2019-10-01 | Well Log Performed |
2019-10-01 | Well Mode changed to Drilled and Cased |
2019-10-03 | Well Log Performed |
2019-10-04 | Production Casing Operation Performed |
2019-10-04 | Rig Released |
2019-11-21 | Perforation Treatment Performed - Jet Perforation |
2019-12-04 | Perforation Treatment Performed - Jet Perforation |
2019-12-04 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-12-05 | Perforation Treatment Performed - Jet Perforation |
2019-12-05 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-12-06 | Perforation Treatment Performed - Jet Perforation |
2019-12-06 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-12-09 | Perforation Treatment Performed - Jet Perforation |
2019-12-09 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-12-10 | Perforation Treatment Performed - Jet Perforation |
2019-12-10 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-12-11 | Perforation Treatment Performed - Jet Perforation |
2019-12-11 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-12-12 | Perforation Treatment Performed - Jet Perforation |
2019-12-14 | Perforation Treatment Performed - Jet Perforation |
2019-12-14 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-12-15 | Perforation Treatment Performed - Jet Perforation |
2019-12-15 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-12-16 | Perforation Treatment Performed - Jet Perforation |
2019-12-16 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-12-18 | Perforation Treatment Performed - Jet Perforation |
2019-12-18 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-12-19 | Perforation Treatment Performed - Jet Perforation |
2019-12-19 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-12-20 | Perforation Treatment Performed - Jet Perforation |
2019-12-20 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-12-21 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-12-22 | Perforation Treatment Performed - Jet Perforation |
2019-12-22 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-12-23 | Perforation Treatment Performed - Jet Perforation |
2019-12-23 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-12-24 | Perforation Treatment Performed - Jet Perforation |
2019-12-24 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-12-25 | Perforation Treatment Performed - Multi-Stage Fracture |
2020-03-25 | Well Began Production |
2020-03-25 | Well Fluid changed to Shale Gas Only |
2020-03-25 | Well Mode changed to Flowing |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2019-07-01 | Ensign Drilling Inc. | 785 | Set Surface | |
2019-07-18 | Ensign Drilling Inc. | 785 | Drill To LD | |
2019-09-24 | Ensign Drilling Inc. | 785 | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2019-07-02 | 167.20 | Deviate (5 - 79 degrees) |
2019-09-26 | 3540.80 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2019-11-21 | Perforation | 5599.20 | 5599.70 | 12 |
2019-12-04 | Perforation | 5481.20 | 5481.70 | 10 |
2019-12-16 | Perforation | 4345.00 | 4345.50 | 12 |
2019-12-16 | Perforation | 4330.30 | 4330.80 | 10 |
2019-12-16 | Perforation | 4315.50 | 4316.00 | 10 |
2019-12-16 | Perforation | 4300.80 | 4301.30 | 8 |
2019-12-18 | Multi-Stage Fracture | 4300.80 | 4374.80 | 0 |
2019-12-18 | Perforation | 4285.80 | 4286.30 | 14 |
2019-12-18 | Perforation | 4271.30 | 4271.80 | 12 |
2019-12-18 | Perforation | 4256.50 | 4257.00 | 12 |
2019-12-18 | Perforation | 4241.80 | 4242.30 | 10 |
2019-12-18 | Perforation | 4227.00 | 4227.50 | 10 |
2019-12-04 | Perforation | 5466.40 | 5466.90 | 10 |
2019-12-18 | Perforation | 4212.30 | 4212.80 | 8 |
2019-12-18 | Multi-Stage Fracture | 4212.30 | 4286.30 | 0 |
2019-12-18 | Perforation | 4197.30 | 4197.80 | 14 |
2019-12-18 | Perforation | 4182.70 | 4183.20 | 12 |
2019-12-18 | Perforation | 4168.00 | 4168.50 | 12 |
2019-12-18 | Perforation | 4153.20 | 4153.70 | 10 |
2019-12-18 | Perforation | 4138.50 | 4139.00 | 10 |
2019-12-18 | Perforation | 4123.70 | 4124.20 | 8 |
2019-12-19 | Multi-Stage Fracture | 4123.70 | 4197.80 | 0 |
2019-12-19 | Perforation | 4108.70 | 4109.20 | 14 |
2019-12-04 | Perforation | 5451.70 | 5452.20 | 8 |
2019-12-19 | Perforation | 4094.20 | 4094.70 | 12 |
2019-12-19 | Perforation | 4079.50 | 4080.00 | 12 |
2019-12-19 | Perforation | 4064.70 | 4065.20 | 10 |
2019-12-19 | Perforation | 4049.90 | 4050.40 | 10 |
2019-12-19 | Perforation | 4035.20 | 4035.70 | 8 |
2019-12-19 | Multi-Stage Fracture | 4035.20 | 4109.20 | 0 |
2019-12-20 | Perforation | 4020.20 | 4020.70 | 14 |
2019-12-20 | Perforation | 4005.70 | 4006.20 | 12 |
2019-12-20 | Perforation | 3990.90 | 3991.40 | 12 |
2019-12-20 | Perforation | 3976.20 | 3976.70 | 10 |
2019-12-05 | Multi-Stage Fracture | 5451.70 | 5525.70 | 0 |
2019-12-20 | Perforation | 3961.40 | 3961.90 | 10 |
2019-12-20 | Perforation | 3946.70 | 3947.20 | 8 |
2019-12-20 | Multi-Stage Fracture | 3946.70 | 4020.70 | 0 |
2019-12-20 | Perforation | 3931.70 | 3932.20 | 14 |
2019-12-20 | Perforation | 3917.10 | 3917.60 | 12 |
2019-12-20 | Perforation | 3902.40 | 3902.90 | 12 |
2019-12-20 | Perforation | 3887.60 | 3888.10 | 10 |
2019-12-20 | Perforation | 3872.90 | 3873.40 | 10 |
2019-12-20 | Perforation | 3858.10 | 3858.60 | 8 |
2019-12-21 | Multi-Stage Fracture | 3858.10 | 3932.20 | 0 |
2019-12-05 | Perforation | 5436.70 | 5437.20 | 14 |
2019-12-22 | Perforation | 3843.10 | 3843.60 | 14 |
2019-12-22 | Perforation | 3828.60 | 3829.10 | 12 |
2019-12-22 | Perforation | 3813.90 | 3814.40 | 12 |
2019-12-22 | Perforation | 3799.10 | 3799.60 | 10 |
2019-12-22 | Perforation | 3784.30 | 3784.80 | 10 |
2019-12-22 | Perforation | 3769.60 | 3770.10 | 8 |
2019-12-22 | Multi-Stage Fracture | 3769.60 | 3843.60 | 0 |
2019-12-23 | Perforation | 3754.60 | 3755.10 | 14 |
2019-12-23 | Perforation | 3740.10 | 3740.60 | 12 |
2019-12-23 | Perforation | 3725.30 | 3725.80 | 12 |
2019-12-05 | Perforation | 5422.20 | 5422.70 | 12 |
2019-12-23 | Perforation | 3710.60 | 3711.10 | 10 |
2019-12-23 | Perforation | 3695.80 | 3696.30 | 10 |
2019-12-23 | Perforation | 3681.10 | 3681.60 | 8 |
2019-12-23 | Multi-Stage Fracture | 3681.10 | 3755.10 | 0 |
2019-12-23 | Perforation | 3666.10 | 3666.60 | 14 |
2019-12-23 | Perforation | 3651.60 | 3652.10 | 12 |
2019-12-23 | Perforation | 3636.80 | 3637.30 | 12 |
2019-12-23 | Perforation | 3622.00 | 3622.50 | 10 |
2019-12-23 | Perforation | 3607.30 | 3607.80 | 10 |
2019-12-23 | Perforation | 3592.50 | 3593.00 | 8 |
2019-12-05 | Perforation | 5407.40 | 5407.90 | 12 |
2019-12-24 | Multi-Stage Fracture | 3592.50 | 3666.60 | 0 |
2019-12-24 | Perforation | 3577.50 | 3578.00 | 14 |
2019-12-24 | Perforation | 3563.00 | 3563.50 | 12 |
2019-12-24 | Perforation | 3548.30 | 3548.80 | 12 |
2019-12-24 | Perforation | 3533.50 | 3534.00 | 10 |
2019-12-24 | Perforation | 3518.80 | 3519.30 | 10 |
2019-12-24 | Perforation | 3504.00 | 3504.50 | 8 |
2019-12-25 | Multi-Stage Fracture | 3504.00 | 3578.00 | 0 |
2019-12-05 | Perforation | 5392.70 | 5393.20 | 10 |
2019-12-05 | Perforation | 5377.90 | 5378.40 | 10 |
2019-12-05 | Perforation | 5363.20 | 5363.70 | 8 |
2019-11-21 | Perforation | 5584.50 | 5585.00 | 12 |
2019-12-05 | Multi-Stage Fracture | 5363.20 | 5437.20 | 0 |
2019-12-06 | Perforation | 5348.20 | 5348.70 | 14 |
2019-12-06 | Perforation | 5333.70 | 5334.20 | 12 |
2019-12-06 | Perforation | 5318.90 | 5319.40 | 12 |
2019-12-06 | Perforation | 5304.10 | 5304.60 | 10 |
2019-12-06 | Perforation | 5289.40 | 5289.90 | 10 |
2019-12-06 | Perforation | 5274.60 | 5275.10 | 8 |
2019-12-06 | Multi-Stage Fracture | 5274.60 | 5348.70 | 0 |
2019-12-06 | Perforation | 5259.60 | 5260.10 | 14 |
2019-12-06 | Perforation | 5245.10 | 5245.60 | 12 |
2019-11-21 | Perforation | 5569.70 | 5570.20 | 12 |
2019-12-06 | Perforation | 5230.40 | 5230.90 | 12 |
2019-12-06 | Perforation | 5215.60 | 5216.10 | 10 |
2019-12-06 | Perforation | 5200.90 | 5201.40 | 10 |
2019-12-06 | Perforation | 5186.10 | 5186.60 | 8 |
2019-12-09 | Multi-Stage Fracture | 5186.10 | 5260.10 | 0 |
2019-12-09 | Perforation | 5171.10 | 5171.60 | 14 |
2019-12-09 | Perforation | 5156.60 | 5157.10 | 12 |
2019-12-09 | Perforation | 5141.80 | 5142.30 | 12 |
2019-12-09 | Perforation | 5127.10 | 5127.60 | 10 |
2019-12-09 | Perforation | 5112.30 | 5112.80 | 10 |
2019-11-21 | Perforation | 5555.00 | 5555.50 | 12 |
2019-12-09 | Perforation | 5097.60 | 5098.10 | 8 |
2019-12-10 | Multi-Stage Fracture | 5097.60 | 5171.60 | 0 |
2019-12-10 | Perforation | 5082.60 | 5083.10 | 14 |
2019-12-10 | Perforation | 5068.10 | 5068.60 | 12 |
2019-12-10 | Perforation | 5053.30 | 5053.80 | 12 |
2019-12-10 | Perforation | 5038.50 | 5039.00 | 10 |
2019-12-10 | Perforation | 5023.80 | 5024.30 | 10 |
2019-12-10 | Perforation | 5009.00 | 5009.50 | 8 |
2019-12-10 | Multi-Stage Fracture | 5009.00 | 5083.10 | 0 |
2019-12-10 | Perforation | 4994.00 | 4994.50 | 14 |
2019-11-21 | Perforation | 5540.20 | 5540.70 | 12 |
2019-12-10 | Perforation | 4979.50 | 4980.00 | 12 |
2019-12-10 | Perforation | 4964.80 | 4965.30 | 12 |
2019-12-10 | Perforation | 4950.00 | 4950.50 | 10 |
2019-12-10 | Perforation | 4935.30 | 4935.80 | 10 |
2019-12-10 | Perforation | 4920.50 | 4921.00 | 8 |
2019-12-11 | Multi-Stage Fracture | 4920.50 | 4994.50 | 0 |
2019-12-11 | Perforation | 4905.50 | 4906.00 | 14 |
2019-12-11 | Perforation | 4891.00 | 4891.50 | 12 |
2019-12-11 | Perforation | 4876.20 | 4876.70 | 12 |
2019-12-11 | Perforation | 4861.50 | 4862.00 | 10 |
2019-12-04 | Multi-Stage Fracture | 5540.20 | 5599.70 | 0 |
2019-12-11 | Perforation | 4846.70 | 4847.20 | 10 |
2019-12-11 | Perforation | 4832.00 | 4832.50 | 8 |
2019-12-11 | Multi-Stage Fracture | 4832.00 | 4906.00 | 0 |
2019-12-12 | Perforation | 4817.00 | 4817.50 | 14 |
2019-12-12 | Perforation | 4802.50 | 4803.00 | 12 |
2019-12-12 | Perforation | 4787.70 | 4788.20 | 12 |
2019-12-12 | Perforation | 4773.00 | 4773.50 | 10 |
2019-12-12 | Perforation | 4758.20 | 4758.70 | 10 |
2019-12-12 | Perforation | 4743.40 | 4743.90 | 8 |
2019-12-14 | Multi-Stage Fracture | 4743.40 | 4817.50 | 0 |
2019-12-04 | Perforation | 5525.20 | 5525.70 | 14 |
2019-12-14 | Perforation | 4728.40 | 4728.90 | 14 |
2019-12-14 | Perforation | 4713.90 | 4714.40 | 12 |
2019-12-14 | Perforation | 4699.20 | 4699.70 | 12 |
2019-12-14 | Perforation | 4684.40 | 4684.90 | 10 |
2019-12-14 | Perforation | 4669.70 | 4670.20 | 10 |
2019-12-14 | Perforation | 4654.90 | 4655.40 | 8 |
2019-12-14 | Multi-Stage Fracture | 4654.90 | 4728.90 | 0 |
2019-12-14 | Perforation | 4639.90 | 4640.40 | 14 |
2019-12-14 | Perforation | 4625.40 | 4625.90 | 12 |
2019-12-14 | Perforation | 4610.60 | 4611.10 | 12 |
2019-12-04 | Perforation | 5510.70 | 5511.20 | 12 |
2019-12-14 | Perforation | 4595.90 | 4596.40 | 10 |
2019-12-14 | Perforation | 4581.10 | 4581.60 | 10 |
2019-12-14 | Perforation | 4566.40 | 4566.90 | 8 |
2019-12-15 | Multi-Stage Fracture | 4566.40 | 4640.40 | 0 |
2019-12-15 | Perforation | 4551.40 | 4551.90 | 14 |
2019-12-15 | Perforation | 4536.90 | 4537.40 | 12 |
2019-12-15 | Perforation | 4522.10 | 4522.60 | 12 |
2019-12-15 | Perforation | 4507.40 | 4507.90 | 10 |
2019-12-15 | Perforation | 4492.60 | 4493.10 | 10 |
2019-12-15 | Perforation | 4477.80 | 4478.30 | 8 |
2019-12-04 | Perforation | 5496.00 | 5496.50 | 12 |
2019-12-15 | Multi-Stage Fracture | 4477.80 | 4551.90 | 0 |
2019-12-16 | Perforation | 4462.80 | 4463.30 | 14 |
2019-12-16 | Perforation | 4448.30 | 4448.80 | 12 |
2019-12-16 | Perforation | 4433.60 | 4434.10 | 12 |
2019-12-16 | Perforation | 4418.80 | 4419.30 | 10 |
2019-12-16 | Perforation | 4404.10 | 4404.60 | 10 |
2019-12-16 | Perforation | 4389.30 | 4389.80 | 8 |
2019-12-16 | Multi-Stage Fracture | 4389.30 | 4463.30 | 0 |
2019-12-16 | Perforation | 4374.30 | 4374.80 | 14 |
2019-12-16 | Perforation | 4359.80 | 4360.30 | 12 |
For data sources see[6]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2020 | 164 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2019-10-01 | No Incident Encountered | 0.00 | 0.00 |
2020-02-13 | No Incident Encountered | 0.00 | 0.00 |
2020-01-19 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]