If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0625212613030 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.370338,"lon":-117.00791,"icon":""}]} |
Location: 03/13-26-062-21W5/0 | |
Location Alias: 03/13-26-62-21 W5M | |
Location Alias 2: 03/13-26-062-21 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 062 | |
Meridian: 5 | |
Range: 21 | |
Section: 26 | |
County/Municipality: Municipal District of Greenview No. 16 | |
Well Name: CHEVRON 103 HZ KAYBOBS 13-26-62-21 | |
Operator Name: Chevron Canada Limited | |
License Number: 0485733 | |
License Date: 2017-10-10 | |
License Status: Amended | |
Spud Date: 2018-08-29 | |
Final Drill Date: 2018-12-17 | |
Well Total Depth: 7515.00 m | |
Surface Hole Latitude: 54.370338 | |
Surface Hole Longitude: -117.007910 |
Date | Event |
---|---|
2017-10-10 | Obtained License |
2018-08-29 | Surface Casing Operation Performed |
2018-09-18 | Direction Drilling Operation Performed - Deviate |
2018-09-21 | Intermediate Casing Operation Performed |
2018-12-09 | Direction Drilling Operation Performed - Horizontal |
2018-12-17 | Finished Drilling |
2018-12-17 | Well Log Performed |
2018-12-17 | Well Mode changed to Drilled and Cased |
2018-12-19 | Well Log Performed |
2018-12-21 | Production Casing Operation Performed |
2018-12-22 | Lost Circulation Occurred |
2018-12-22 | Rig Released |
2019-05-28 | Perforation Treatment Performed - Jet Perforation |
2019-05-29 | Perforation Treatment Performed - Jet Perforation |
2019-05-31 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-06-01 | Perforation Treatment Performed - Jet Perforation |
2019-06-01 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-06-02 | Perforation Treatment Performed - Jet Perforation |
2019-06-02 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-06-03 | Perforation Treatment Performed - Jet Perforation |
2019-06-03 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-06-04 | Perforation Treatment Performed - Jet Perforation |
2019-06-04 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-06-05 | Perforation Treatment Performed - Jet Perforation |
2019-06-05 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-06-06 | Perforation Treatment Performed - Jet Perforation |
2019-06-06 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-06-07 | Perforation Treatment Performed - Jet Perforation |
2019-06-07 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-06-08 | Perforation Treatment Performed - Jet Perforation |
2019-06-08 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-06-09 | Perforation Treatment Performed - Jet Perforation |
2019-06-09 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-06-10 | Perforation Treatment Performed - Jet Perforation |
2019-06-10 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-06-11 | Perforation Treatment Performed - Jet Perforation |
2019-06-11 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-06-12 | Perforation Treatment Performed - Jet Perforation |
2019-06-12 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-06-13 | Perforation Treatment Performed - Jet Perforation |
2019-06-13 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-06-14 | Perforation Treatment Performed - Jet Perforation |
2019-06-14 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-06-15 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-06-16 | Perforation Treatment Performed - Jet Perforation |
2019-06-16 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-06-17 | Perforation Treatment Performed - Jet Perforation |
2019-06-17 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-06-18 | Perforation Treatment Performed - Jet Perforation |
2019-06-18 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-06-19 | Perforation Treatment Performed - Jet Perforation |
2019-06-19 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-06-20 | Perforation Treatment Performed - Jet Perforation |
2019-06-20 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-06-21 | Perforation Treatment Performed - Jet Perforation |
2019-06-21 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-06-22 | Perforation Treatment Performed - Jet Perforation |
2019-06-22 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-06-23 | Perforation Treatment Performed - Jet Perforation |
2019-06-23 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-06-24 | Perforation Treatment Performed - Jet Perforation |
2019-06-24 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-06-25 | Perforation Treatment Performed - Jet Perforation |
2019-06-25 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-06-26 | Perforation Treatment Performed - Jet Perforation |
2019-06-26 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-06-27 | Perforation Treatment Performed - Jet Perforation |
2019-06-27 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-06-28 | Perforation Treatment Performed - Jet Perforation |
2019-06-28 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-06-29 | Perforation Treatment Performed - Jet Perforation |
2019-06-29 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-06-30 | Perforation Treatment Performed - Jet Perforation |
2019-06-30 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-07-01 | Perforation Treatment Performed - Jet Perforation |
2019-07-01 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-07-02 | Perforation Treatment Performed - Jet Perforation |
2019-07-02 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-09-18 | Well Began Production |
2019-09-18 | Well Fluid changed to Shale Gas Only |
2019-09-18 | Well Mode changed to Flowing |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2018-09-18 | 567.30 | Deviate (5 - 79 degrees) |
2018-12-09 | 3348.10 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2019-05-28 | Perforation | 7449.00 | 7449.50 | 20 |
2019-05-29 | Perforation | 7388.80 | 7389.30 | 20 |
2019-06-09 | Multi-Stage Fracture | 6306.40 | 6382.10 | 0 |
2019-06-09 | Perforation | 6291.40 | 6291.90 | 16 |
2019-06-09 | Perforation | 6276.40 | 6276.90 | 12 |
2019-06-09 | Perforation | 6261.30 | 6261.80 | 12 |
2019-06-09 | Perforation | 6246.30 | 6246.80 | 10 |
2019-06-09 | Perforation | 6231.30 | 6231.80 | 8 |
2019-06-09 | Perforation | 6216.20 | 6216.70 | 8 |
2019-06-09 | Multi-Stage Fracture | 6216.00 | 6292.00 | 0 |
2019-06-10 | Perforation | 6201.20 | 6201.70 | 16 |
2019-06-10 | Perforation | 6186.20 | 6186.70 | 12 |
2019-05-31 | Multi-Stage Fracture | 7388.60 | 7449.50 | 0 |
2019-06-10 | Perforation | 6171.10 | 6171.60 | 12 |
2019-06-10 | Perforation | 6156.10 | 6156.60 | 10 |
2019-06-10 | Perforation | 6141.10 | 6141.60 | 8 |
2019-06-10 | Perforation | 6126.00 | 6126.50 | 8 |
2019-06-10 | Multi-Stage Fracture | 6126.00 | 6202.00 | 0 |
2019-06-10 | Perforation | 6111.00 | 6111.50 | 16 |
2019-06-10 | Perforation | 6096.00 | 6096.50 | 12 |
2019-06-10 | Perforation | 6080.90 | 6081.40 | 12 |
2019-06-10 | Perforation | 6065.90 | 6066.40 | 10 |
2019-06-10 | Perforation | 6050.90 | 6051.40 | 8 |
2019-06-01 | Perforation | 7373.80 | 7374.30 | 16 |
2019-06-10 | Perforation | 6035.80 | 6036.30 | 8 |
2019-06-11 | Multi-Stage Fracture | 6035.30 | 6111.50 | 0 |
2019-06-11 | Perforation | 6020.80 | 6021.30 | 16 |
2019-06-11 | Perforation | 6005.80 | 6006.30 | 12 |
2019-06-11 | Perforation | 5990.70 | 5991.20 | 12 |
2019-06-11 | Perforation | 5975.70 | 5976.20 | 10 |
2019-06-11 | Perforation | 5960.70 | 5961.20 | 8 |
2019-06-11 | Perforation | 5945.60 | 5946.10 | 8 |
2019-06-12 | Multi-Stage Fracture | 5945.10 | 6021.30 | 0 |
2019-06-12 | Perforation | 5930.60 | 5931.10 | 16 |
2019-06-01 | Perforation | 7358.80 | 7359.30 | 14 |
2019-06-12 | Perforation | 5915.60 | 5916.10 | 14 |
2019-06-12 | Perforation | 5900.50 | 5901.00 | 14 |
2019-06-12 | Perforation | 5885.50 | 5886.00 | 12 |
2019-06-12 | Perforation | 5870.50 | 5871.00 | 10 |
2019-06-12 | Perforation | 5855.40 | 5855.90 | 10 |
2019-06-13 | Multi-Stage Fracture | 5855.40 | 5930.60 | 0 |
2019-06-13 | Perforation | 5840.40 | 5840.90 | 16 |
2019-06-13 | Perforation | 5825.40 | 5825.90 | 14 |
2019-06-13 | Perforation | 5810.30 | 5810.80 | 14 |
2019-06-13 | Perforation | 5795.30 | 5795.80 | 12 |
2019-06-01 | Perforation | 7343.70 | 7344.20 | 12 |
2019-06-13 | Perforation | 5780.30 | 5780.80 | 10 |
2019-06-13 | Perforation | 5765.20 | 5765.70 | 10 |
2019-06-13 | Multi-Stage Fracture | 5764.70 | 5840.90 | 0 |
2019-06-14 | Perforation | 5750.20 | 5750.70 | 16 |
2019-06-14 | Perforation | 5735.20 | 5735.70 | 14 |
2019-06-14 | Perforation | 5720.10 | 5720.60 | 14 |
2019-06-14 | Perforation | 5705.10 | 5705.60 | 12 |
2019-06-14 | Perforation | 5690.10 | 5690.60 | 10 |
2019-06-14 | Perforation | 5675.00 | 5675.50 | 10 |
2019-06-14 | Multi-Stage Fracture | 5674.50 | 5750.70 | 0 |
2019-06-01 | Perforation | 7328.70 | 7329.20 | 12 |
2019-06-14 | Perforation | 5660.00 | 5660.50 | 16 |
2019-06-14 | Perforation | 5645.00 | 5645.50 | 14 |
2019-06-14 | Perforation | 5629.90 | 5630.40 | 14 |
2019-06-14 | Perforation | 5614.90 | 5615.40 | 12 |
2019-06-14 | Perforation | 5599.90 | 5600.40 | 10 |
2019-06-14 | Perforation | 5584.80 | 5585.30 | 10 |
2019-06-15 | Multi-Stage Fracture | 5584.30 | 5660.50 | 0 |
2019-06-16 | Perforation | 5569.80 | 5570.30 | 16 |
2019-06-16 | Perforation | 5554.80 | 5555.30 | 14 |
2019-06-16 | Perforation | 5539.70 | 5540.20 | 14 |
2019-06-01 | Multi-Stage Fracture | 7328.80 | 7374.30 | 0 |
2019-06-16 | Perforation | 5524.70 | 5525.20 | 12 |
2019-06-16 | Perforation | 5509.70 | 5510.20 | 10 |
2019-06-16 | Perforation | 5594.60 | 5595.10 | 10 |
2019-06-16 | Multi-Stage Fracture | 5494.10 | 5570.30 | 0 |
2019-06-17 | Perforation | 5479.60 | 5480.10 | 16 |
2019-06-17 | Perforation | 5464.60 | 5465.10 | 14 |
2019-06-17 | Perforation | 5449.50 | 5450.00 | 14 |
2019-06-17 | Perforation | 5434.50 | 5435.00 | 12 |
2019-06-17 | Perforation | 5419.50 | 5420.00 | 10 |
2019-06-17 | Perforation | 5404.50 | 5405.00 | 10 |
2019-06-01 | Perforation | 7313.70 | 7314.20 | 16 |
2019-06-17 | Multi-Stage Fracture | 5404.00 | 5479.10 | 0 |
2019-06-17 | Perforation | 5389.40 | 5389.90 | 16 |
2019-06-17 | Perforation | 5374.30 | 5374.80 | 14 |
2019-06-17 | Perforation | 5359.40 | 5359.90 | 14 |
2019-06-17 | Perforation | 5344.30 | 5344.80 | 12 |
2019-06-17 | Perforation | 5329.30 | 5329.80 | 10 |
2019-06-17 | Perforation | 5314.30 | 5314.80 | 10 |
2019-06-18 | Multi-Stage Fracture | 5313.80 | 5389.90 | 0 |
2019-06-18 | Perforation | 5299.20 | 5299.70 | 16 |
2019-06-18 | Perforation | 5284.20 | 5284.70 | 14 |
2019-06-01 | Perforation | 7298.60 | 7299.10 | 14 |
2019-06-18 | Perforation | 5269.20 | 5269.70 | 14 |
2019-06-18 | Perforation | 5254.10 | 5254.60 | 12 |
2019-06-18 | Perforation | 5239.10 | 5239.60 | 10 |
2019-06-18 | Perforation | 5224.10 | 5224.60 | 10 |
2019-06-18 | Multi-Stage Fracture | 5224.10 | 5299.70 | 0 |
2019-06-18 | Perforation | 5209.00 | 5209.50 | 16 |
2019-06-18 | Perforation | 5194.00 | 5194.50 | 14 |
2019-06-18 | Perforation | 5179.00 | 5179.50 | 14 |
2019-06-18 | Perforation | 5163.90 | 5164.40 | 12 |
2019-06-18 | Perforation | 5148.90 | 5149.40 | 10 |
2019-06-01 | Perforation | 7283.60 | 7284.10 | 12 |
2019-06-18 | Perforation | 5133.90 | 5134.40 | 10 |
2019-06-19 | Multi-Stage Fracture | 5133.40 | 5209.50 | 0 |
2019-06-19 | Perforation | 5118.80 | 5119.30 | 16 |
2019-06-19 | Perforation | 5103.80 | 5104.30 | 14 |
2019-06-19 | Perforation | 5088.80 | 5089.30 | 14 |
2019-06-19 | Perforation | 5073.70 | 5074.20 | 12 |
2019-06-19 | Perforation | 5058.70 | 5059.20 | 10 |
2019-06-19 | Perforation | 5043.70 | 5044.20 | 10 |
2019-06-19 | Multi-Stage Fracture | 5043.20 | 5118.80 | 0 |
2019-06-20 | Perforation | 5028.60 | 5029.10 | 10 |
2019-05-28 | Perforation | 7433.90 | 7434.40 | 20 |
2019-06-01 | Perforation | 7268.60 | 7269.10 | 12 |
2019-06-20 | Perforation | 5013.60 | 5014.10 | 10 |
2019-06-20 | Perforation | 4998.60 | 4999.10 | 10 |
2019-06-20 | Perforation | 4983.50 | 4984.00 | 8 |
2019-06-20 | Perforation | 4968.50 | 4969.00 | 8 |
2019-06-20 | Perforation | 4953.50 | 4954.00 | 8 |
2019-06-20 | Multi-Stage Fracture | 4953.00 | 5028.70 | 0 |
2019-06-20 | Perforation | 4938.40 | 4938.90 | 10 |
2019-06-20 | Perforation | 4923.40 | 4923.90 | 10 |
2019-06-20 | Perforation | 4908.40 | 4908.90 | 10 |
2019-06-20 | Perforation | 4893.30 | 4893.80 | 8 |
2019-06-01 | Multi-Stage Fracture | 7268.60 | 7314.20 | 0 |
2019-06-20 | Perforation | 4878.30 | 4878.80 | 8 |
2019-06-20 | Perforation | 4863.30 | 4863.80 | 8 |
2019-06-21 | Multi-Stage Fracture | 4862.80 | 4938.90 | 0 |
2019-06-21 | Perforation | 4848.20 | 4848.70 | 10 |
2019-06-21 | Perforation | 4833.20 | 4833.70 | 10 |
2019-06-21 | Perforation | 4818.20 | 4818.70 | 10 |
2019-06-21 | Perforation | 4803.10 | 4803.60 | 8 |
2019-06-21 | Perforation | 4788.10 | 4788.60 | 8 |
2019-06-21 | Perforation | 4773.10 | 4773.60 | 8 |
2019-06-21 | Multi-Stage Fracture | 4772.60 | 4848.20 | 0 |
2019-06-01 | Perforation | 7253.50 | 7254.00 | 16 |
2019-06-22 | Perforation | 4758.00 | 4758.50 | 10 |
2019-06-22 | Perforation | 4743.00 | 4743.50 | 10 |
2019-06-22 | Perforation | 4728.00 | 4728.50 | 10 |
2019-06-22 | Perforation | 4712.90 | 4713.40 | 8 |
2019-06-22 | Perforation | 4697.90 | 4698.40 | 8 |
2019-06-22 | Perforation | 4682.90 | 4683.40 | 8 |
2019-06-22 | Multi-Stage Fracture | 4682.50 | 4758.20 | 0 |
2019-06-22 | Perforation | 4667.80 | 4668.30 | 10 |
2019-06-22 | Perforation | 4652.80 | 4653.30 | 10 |
2019-06-22 | Perforation | 4637.80 | 4638.30 | 10 |
2019-06-01 | Perforation | 7238.50 | 7239.00 | 14 |
2019-06-22 | Perforation | 4622.70 | 4623.20 | 8 |
2019-06-22 | Perforation | 4607.70 | 4608.20 | 8 |
2019-06-22 | Perforation | 4592.70 | 4593.20 | 8 |
2019-06-23 | Multi-Stage Fracture | 4592.20 | 4667.80 | 0 |
2019-06-23 | Perforation | 4577.60 | 4578.10 | 10 |
2019-06-23 | Perforation | 4562.60 | 4563.10 | 10 |
2019-06-23 | Perforation | 4547.60 | 4548.10 | 10 |
2019-06-23 | Perforation | 4532.50 | 4533.00 | 8 |
2019-06-23 | Perforation | 4517.50 | 4518.00 | 8 |
2019-06-23 | Perforation | 4502.50 | 4503.00 | 8 |
2019-06-01 | Perforation | 7223.50 | 7224.00 | 12 |
2019-06-23 | Multi-Stage Fracture | 4502.00 | 4577.60 | 0 |
2019-06-23 | Perforation | 4487.40 | 4487.90 | 10 |
2019-06-24 | Perforation | 4472.40 | 4472.90 | 10 |
2019-06-24 | Perforation | 4457.40 | 4457.90 | 10 |
2019-06-24 | Perforation | 4442.30 | 4442.80 | 8 |
2019-06-24 | Perforation | 4427.30 | 4427.80 | 8 |
2019-06-24 | Perforation | 4412.30 | 4412.80 | 8 |
2019-06-24 | Multi-Stage Fracture | 4412.00 | 4487.50 | 0 |
2019-06-24 | Perforation | 4397.20 | 4397.70 | 10 |
2019-06-24 | Perforation | 4382.20 | 4382.70 | 10 |
2019-06-01 | Perforation | 7208.40 | 7208.90 | 12 |
2019-06-24 | Perforation | 4367.20 | 4367.70 | 10 |
2019-06-24 | Perforation | 4352.10 | 4352.60 | 8 |
2019-06-24 | Perforation | 4337.10 | 4337.60 | 8 |
2019-06-24 | Perforation | 4322.10 | 4322.60 | 8 |
2019-06-25 | Multi-Stage Fracture | 4321.60 | 4397.20 | 0 |
2019-06-25 | Perforation | 4307.00 | 4307.50 | 10 |
2019-06-25 | Perforation | 4292.00 | 4292.50 | 10 |
2019-06-25 | Perforation | 4277.00 | 4277.50 | 10 |
2019-06-25 | Perforation | 4261.90 | 4262.40 | 8 |
2019-06-25 | Perforation | 4246.90 | 4247.40 | 8 |
2019-06-02 | Multi-Stage Fracture | 7208.00 | 7254.00 | 0 |
2019-06-25 | Perforation | 4231.90 | 4232.40 | 8 |
2019-06-25 | Multi-Stage Fracture | 4231.40 | 4307.00 | 0 |
2019-06-26 | Perforation | 4216.80 | 4217.30 | 10 |
2019-06-26 | Perforation | 4201.80 | 4202.30 | 10 |
2019-06-26 | Perforation | 4186.80 | 4187.30 | 10 |
2019-06-26 | Perforation | 4171.70 | 4172.20 | 8 |
2019-06-26 | Perforation | 4156.70 | 4157.20 | 8 |
2019-06-26 | Perforation | 4141.70 | 4142.20 | 8 |
2019-06-26 | Multi-Stage Fracture | 4141.20 | 4216.80 | 0 |
2019-06-26 | Perforation | 4126.60 | 4127.10 | 10 |
2019-06-02 | Perforation | 7193.40 | 7193.90 | 16 |
2019-06-26 | Perforation | 4111.60 | 4112.10 | 10 |
2019-06-26 | Perforation | 4096.60 | 4097.10 | 10 |
2019-06-26 | Perforation | 4081.50 | 4082.00 | 8 |
2019-06-26 | Perforation | 4066.50 | 4067.00 | 8 |
2019-06-26 | Perforation | 4051.50 | 4052.00 | 8 |
2019-06-27 | Multi-Stage Fracture | 4051.50 | 4134.10 | 0 |
2019-06-27 | Perforation | 4036.40 | 4036.90 | 10 |
2019-06-27 | Perforation | 4021.40 | 4021.90 | 10 |
2019-06-27 | Perforation | 4006.40 | 4006.90 | 10 |
2019-06-27 | Perforation | 3991.30 | 3991.80 | 8 |
2019-06-02 | Perforation | 7178.40 | 7178.90 | 14 |
2019-06-27 | Perforation | 3976.30 | 3976.80 | 8 |
2019-06-27 | Perforation | 3961.30 | 3961.80 | 8 |
2019-06-28 | Multi-Stage Fracture | 3961.00 | 4036.50 | 0 |
2019-06-28 | Perforation | 3946.20 | 3946.70 | 10 |
2019-06-28 | Perforation | 3931.20 | 3931.70 | 10 |
2019-06-28 | Perforation | 3916.20 | 3916.70 | 10 |
2019-06-28 | Perforation | 3901.10 | 3901.60 | 8 |
2019-06-28 | Perforation | 3886.10 | 3886.60 | 8 |
2019-06-28 | Perforation | 3871.10 | 3871.60 | 8 |
2019-06-29 | Multi-Stage Fracture | 3870.60 | 3946.20 | 0 |
2019-06-02 | Perforation | 7163.30 | 7163.80 | 12 |
2019-06-29 | Perforation | 3856.00 | 3856.50 | 10 |
2019-06-29 | Perforation | 3841.00 | 3841.50 | 10 |
2019-06-29 | Perforation | 3826.00 | 3826.50 | 10 |
2019-06-29 | Perforation | 3810.90 | 3811.40 | 8 |
2019-06-29 | Perforation | 3795.90 | 3796.40 | 8 |
2019-06-29 | Perforation | 3780.90 | 3781.40 | 8 |
2019-06-29 | Multi-Stage Fracture | 3780.40 | 3856.00 | 0 |
2019-06-30 | Perforation | 3765.80 | 3766.30 | 10 |
2019-06-30 | Perforation | 3750.80 | 3751.30 | 10 |
2019-06-30 | Perforation | 3735.80 | 3736.30 | 10 |
2019-05-28 | Perforation | 7418.90 | 7419.40 | 20 |
2019-06-02 | Perforation | 7148.30 | 7148.80 | 12 |
2019-06-30 | Perforation | 3720.70 | 3721.20 | 8 |
2019-06-30 | Perforation | 3705.70 | 3706.20 | 8 |
2019-06-30 | Perforation | 3690.70 | 3691.20 | 8 |
2019-06-30 | Multi-Stage Fracture | 3690.20 | 3765.80 | 0 |
2019-07-01 | Perforation | 3675.60 | 3676.10 | 10 |
2019-07-01 | Perforation | 3660.60 | 3661.10 | 10 |
2019-07-01 | Perforation | 3645.60 | 3646.10 | 10 |
2019-07-01 | Perforation | 3630.50 | 3631.00 | 8 |
2019-07-01 | Perforation | 3615.50 | 3616.00 | 8 |
2019-07-01 | Perforation | 3600.50 | 3601.00 | 8 |
2019-06-02 | Multi-Stage Fracture | 7148.30 | 7193.90 | 0 |
2019-07-01 | Multi-Stage Fracture | 3510.20 | 3585.60 | 0 |
2019-07-01 | Perforation | 3585.40 | 3585.90 | 10 |
2019-07-01 | Perforation | 3570.40 | 3570.90 | 10 |
2019-07-01 | Perforation | 3555.40 | 3555.90 | 10 |
2019-07-01 | Perforation | 3540.30 | 3540.80 | 8 |
2019-07-01 | Perforation | 3525.30 | 3525.80 | 8 |
2019-07-01 | Perforation | 3510.30 | 3510.80 | 8 |
2019-07-02 | Perforation | 3495.20 | 3495.70 | 10 |
2019-07-02 | Perforation | 3480.20 | 3480.70 | 10 |
2019-07-02 | Perforation | 3465.20 | 3465.70 | 10 |
2019-06-02 | Perforation | 7133.30 | 7133.80 | 16 |
2019-07-02 | Perforation | 3450.10 | 3450.60 | 8 |
2019-07-02 | Perforation | 3425.10 | 3425.60 | 8 |
2019-07-02 | Perforation | 3420.10 | 3420.60 | 8 |
2019-07-02 | Multi-Stage Fracture | 3410.00 | 3495.50 | 0 |
2019-06-02 | Perforation | 7118.20 | 7118.70 | 14 |
2019-06-02 | Perforation | 7103.20 | 7103.70 | 12 |
2019-06-02 | Perforation | 7088.20 | 7088.70 | 12 |
2019-06-02 | Multi-Stage Fracture | 7088.20 | 7133.80 | 0 |
2019-06-03 | Perforation | 7073.10 | 7073.60 | 16 |
2019-06-03 | Perforation | 7058.10 | 7058.60 | 14 |
2019-06-03 | Perforation | 7043.10 | 7043.60 | 12 |
2019-05-28 | Perforation | 7403.90 | 7404.40 | 20 |
2019-06-03 | Perforation | 7028.00 | 7028.50 | 12 |
2019-06-03 | Multi-Stage Fracture | 7028.00 | 7073.60 | 0 |
2019-06-04 | Perforation | 7013.00 | 7013.50 | 16 |
2019-06-04 | Perforation | 6998.00 | 6998.50 | 14 |
2019-06-04 | Perforation | 6982.90 | 6983.40 | 12 |
2019-06-04 | Perforation | 6967.90 | 6968.40 | 12 |
2019-06-04 | Multi-Stage Fracture | 6968.00 | 7013.80 | 0 |
2019-06-04 | Perforation | 6952.90 | 6953.40 | 12 |
2019-06-04 | Perforation | 6937.80 | 6938.30 | 12 |
2019-06-04 | Perforation | 6922.80 | 6923.30 | 10 |
2019-05-28 | Perforation | 7388.80 | 7389.30 | 20 |
2019-06-04 | Perforation | 6907.80 | 6908.30 | 10 |
2019-06-04 | Multi-Stage Fracture | 6907.80 | 6953.40 | 0 |
2019-06-05 | Perforation | 6892.70 | 6893.20 | 12 |
2019-06-05 | Perforation | 6877.70 | 6878.20 | 12 |
2019-06-05 | Perforation | 6862.70 | 6863.20 | 10 |
2019-06-05 | Perforation | 6847.60 | 6848.10 | 10 |
2019-06-05 | Multi-Stage Fracture | 6847.20 | 6893.50 | 0 |
2019-06-06 | Perforation | 6832.60 | 6833.10 | 12 |
2019-06-06 | Perforation | 6817.60 | 6818.10 | 12 |
2019-06-06 | Perforation | 6802.50 | 6803.00 | 10 |
2019-05-29 | Perforation | 7419.40 | 7419.90 | 20 |
2019-06-06 | Perforation | 6787.50 | 6788.00 | 10 |
2019-06-06 | Multi-Stage Fracture | 6787.00 | 6833.50 | 0 |
2019-06-06 | Perforation | 6772.50 | 6773.00 | 12 |
2019-06-06 | Perforation | 6757.40 | 6757.90 | 12 |
2019-06-06 | Perforation | 6742.40 | 6742.90 | 10 |
2019-06-06 | Perforation | 6727.40 | 6727.90 | 10 |
2019-06-06 | Multi-Stage Fracture | 6726.90 | 6773.00 | 0 |
2019-06-06 | Perforation | 6712.30 | 6712.80 | 12 |
2019-06-06 | Perforation | 6697.30 | 6697.80 | 12 |
2019-06-06 | Perforation | 6682.30 | 6682.80 | 10 |
2019-05-29 | Perforation | 7411.70 | 7412.20 | 20 |
2019-06-06 | Perforation | 6667.20 | 6667.70 | 10 |
2019-06-07 | Multi-Stage Fracture | 6667.20 | 6712.80 | 0 |
2019-06-07 | Perforation | 6652.20 | 6652.70 | 12 |
2019-06-07 | Perforation | 6637.20 | 6637.70 | 12 |
2019-06-07 | Perforation | 6622.10 | 6622.60 | 10 |
2019-06-07 | Perforation | 6607.10 | 6607.60 | 10 |
2019-06-07 | Multi-Stage Fracture | 6606.60 | 6652.70 | 0 |
2019-06-07 | Perforation | 6592.10 | 6592.60 | 12 |
2019-06-07 | Perforation | 6577.00 | 6577.50 | 12 |
2019-06-07 | Perforation | 6562.00 | 6562.50 | 10 |
2019-05-29 | Perforation | 7404.10 | 7404.60 | 20 |
2019-06-07 | Perforation | 6547.00 | 6547.50 | 10 |
2019-06-07 | Multi-Stage Fracture | 6547.00 | 6592.60 | 0 |
2019-06-08 | Perforation | 6531.90 | 6532.40 | 12 |
2019-06-08 | Perforation | 6516.90 | 6517.40 | 12 |
2019-06-08 | Perforation | 6501.90 | 6502.40 | 10 |
2019-06-08 | Perforation | 6486.80 | 6487.30 | 10 |
2019-06-08 | Multi-Stage Fracture | 6486.30 | 6532.40 | 0 |
2019-06-08 | Perforation | 6471.80 | 6472.30 | 16 |
2019-06-08 | Perforation | 6456.80 | 6457.30 | 12 |
2019-06-08 | Perforation | 6441.70 | 6442.20 | 10 |
2019-05-29 | Perforation | 7396.40 | 7396.90 | 20 |
2019-06-08 | Perforation | 6426.70 | 6427.20 | 10 |
2019-06-08 | Perforation | 6411.70 | 6412.20 | 8 |
2019-06-08 | Perforation | 6396.60 | 6397.10 | 8 |
2019-06-08 | Multi-Stage Fracture | 6396.10 | 6472.30 | 0 |
2019-06-08 | Perforation | 6381.60 | 6382.10 | 16 |
2019-06-08 | Perforation | 6366.60 | 6367.10 | 12 |
2019-06-08 | Perforation | 6351.50 | 6352.00 | 12 |
2019-06-08 | Perforation | 6336.50 | 6337.00 | 10 |
2019-06-08 | Perforation | 6321.50 | 6322.00 | 8 |
2019-06-08 | Perforation | 6306.40 | 6306.90 | 8 |
For data sources see[5]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2019-05-31 | 2019-07-02 | 3,251 | 108,713 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | 7732-18-5 | 100 | 87.7592 | N/A | |||
FRAC SAND. 40/70 WHITE | BJ Services | Crystalline Silica (Quartz) | 14808-60-7 | 100 | 9.2157 | N/A | ||
FRAC SAND. 50/140 WHITE (OTTAWA TYPE) | BJ Services | Crystalline Silica (Quartz) | 14808-60-7 | 100 | 2.701 | N/A | ||
Hydrochloric Acid 28% | BJ Services | Acid | Hydrochloric acid | 7647-01-0 | 100 | 0.1088 | N/A | |
Water | 7732-18-5 | 100 | 0.1088 | N/A | ||||
AQUCAR DB 20 | BJ Services | Bactericide/Biocide | 2.2-Dibromo-3-nitrilopropionamide | 10222-01-2 | 100 | 0.0086 | N/A | |
Dibromoacetonitrile | 3252-43-5 | 100 | 0.0086 | N/A | ||||
Polyethylene Glycol | 25322-68-3 | 100 | 0.0086 | N/A | ||||
Sodium Bromide | 7647-15-6 | 100 | 0.0086 | N/A | ||||
Water | 7732-18-5 | 100 | 0.0086 | N/A | ||||
GBW-41LW | BJ Services | Breaker | Hydrogen Peroxide | 7722-84-1 | 100 | 0.0273 | N/A | |
Methanol | 67-56-1 | 100 | 0.0273 | N/A | ||||
Non-hazardous | Not Available | 100 | 0.0273 | N/A | ||||
MatrixCare CI-01 | BJ Services | Corrosion Inhibitor | 1.2-ethanediol | 107-21-1 | 100 | 0.0012 | N/A | |
1-decanol | 112-30-1 | 100 | 0.0012 | N/A | ||||
1-octanol | 111-87-5 | 100 | 0.0012 | N/A | ||||
2-butoxy ethanol | 111-76-2 | 100 | 0.0012 | N/A | ||||
2-propanol | 67-63-0 | 100 | 0.0012 | N/A | ||||
2-propenal. 3-phenyl- | 104-55-2 | 100 | 0.0012 | N/A | ||||
alcohols. C14-15. ethoxylated | 68951-67-7 | 100 | 0.0012 | N/A | ||||
azabenzene derivatives. quaternized. chloride salt | 15619-48-4 | 100 | 0.0012 | N/A | ||||
formamide. N.N-dimethyl- | 68-12-2 | 100 | 0.0012 | N/A | ||||
phosphoric acid. triethyl ester | 78-40-0 | 100 | 0.0012 | N/A | ||||
Water | 7732-18-5 | 100 | 0.0012 | N/A | ||||
FP-12L | BJ Services | Defoamer | Methylcellulose | 9004-67-5 | 100 | 0 | N/A | |
Non-hazardous | Not Available | 100 | 0 | N/A | ||||
Octamethylcyclotetrasiloxane | 556-67-2 | 100 | 0.0001 | N/A | ||||
Polydimethylsiloxane | 63148-62-9 | 100 | 0 | N/A | ||||
Water | 7732-18-5 | 100 | 0 | N/A | ||||
D-3 | BJ Services | Demulsifier | 2-Ethylhexanol | 104-76-7 | 100 | 0.0009 | N/A | |
Ethoxylated alcohol. branched | 78330-20-8 | 100 | 0.0009 | N/A | ||||
Ethoxylated alcohol. branched | 78330-19-5 | 100 | 0.0009 | N/A | ||||
Heavy Aromatic Naphtha | 64742-94-5 | 100 | 0.0009 | N/A | ||||
Isopropanol | 67-63-0 | 100 | 0.0009 | N/A | ||||
Methanol | 67-56-1 | 100 | 0.0009 | N/A | ||||
Naphthalene | 91-20-3 | 100 | 0.0009 | N/A | ||||
Organic Sulfonic Acid | 10638 | 100 | 0.0009 | N/A | ||||
Oxyalkylated Polymer | 10638 | 100 | 0.0009 | N/A | ||||
Polyalkylene glycol | 10638 | 100 | 0.0009 | N/A | ||||
ThinFrac HV FRHV-01 | BJ Services | Friction Reducer | 1.2 Propanediol carbonate | 108-32-7 | 100 | 0.1292 | N/A | |
Distillates (petroleum) hydrotreated light paraffinic | 64742-55-8 | 100 | 0.1292 | N/A | ||||
Lecitihins. soya | 8030-76-0 | 100 | 0.1292 | N/A | ||||
polymer | Trade Secret | 100 | 0.1292 | N/A | ||||
Water | 7732-18-5 | 100 | 0.1292 | N/A | ||||
ResCare IC 800 | BJ Services | Iron Control | Trisodium nitrilotriacetate monohydrate | 18662-53-8 | 100 | 0.0019 | N/A | |
FraCare SI 14 | BJ Services | Scale Inhibitor | Phosphinocarboxylic acid copolymer | 110224-99-2 | 100 | 0.0221 | N/A | |
Water | 7732-18-5 | 100 | 0.0221 | N/A |
For data sources see[6]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2019-05-29 | 2019-07-02 | Surface Water - River | 71645 |
2019-05-15 | 2019-07-02 | Groundwater - Non-saline less than or equal to 150m deep | 18754 |
2019-05-15 | 2019-07-02 | Groundwater - Non-saline less than or equal to 150m deep | 19841 |
For data sources see[7]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2019 | 1599 | 0.0 | 0.0 | 0.0 |
2020 | 1614 | 0.0 | 0.0 | 0.0 |
For data sources see[8]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2018-12-22 | Lost Circulation | 7496.00 | 7496.00 |
2019-07-02 | No Incident Encountered | 0.00 | 0.00 |
2019-07-30 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[9]