If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0625212605020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.370231,"lon":-117.00804,"icon":""}]} |
Location: 02/05-26-062-21W5/0 | |
Location Alias: 02/05-26-62-21 W5M | |
Location Alias 2: 02/05-26-062-21 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 062 | |
Meridian: 5 | |
Range: 21 | |
Section: 26 | |
County/Municipality: Municipal District of Greenview No. 16 | |
Well Name: CHEVRON 102 HZ KAYBOBS 5-26-62-21 | |
Operator Name: Chevron Canada Limited | |
License Number: 0485734 | |
License Date: 2017-10-10 | |
License Status: Amended | |
Spud Date: 2018-08-30 | |
Final Drill Date: 2018-11-14 | |
Well Total Depth: 7096.00 m | |
Surface Hole Latitude: 54.370231 | |
Surface Hole Longitude: -117.008040 |
Date | Event |
---|---|
2017-10-10 | Obtained License |
2018-08-30 | Surface Casing Operation Performed |
2018-09-08 | Direction Drilling Operation Performed - Deviate |
2018-09-12 | Intermediate Casing Operation Performed |
2018-09-12 | Lost Circulation Occurred |
2018-11-02 | Direction Drilling Operation Performed - Horizontal |
2018-11-04 | Lost Circulation Occurred |
2018-11-06 | Lost Circulation Occurred |
2018-11-12 | Lost Circulation Occurred |
2018-11-14 | Finished Drilling |
2018-11-14 | Well Mode changed to Drilled and Cased |
2018-11-15 | Well Log Performed |
2018-11-16 | Well Log Performed |
2018-11-17 | Production Casing Operation Performed |
2018-11-19 | Rig Released |
2019-05-18 | Perforation Treatment Performed - Jet Perforation |
2019-06-01 | Perforation Treatment Performed - Jet Perforation |
2019-06-01 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-06-02 | Perforation Treatment Performed - Jet Perforation |
2019-06-02 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-06-03 | Perforation Treatment Performed - Jet Perforation |
2019-06-04 | Perforation Treatment Performed - Jet Perforation |
2019-06-04 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-06-06 | Perforation Treatment Performed - Jet Perforation |
2019-06-06 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-06-07 | Perforation Treatment Performed - Jet Perforation |
2019-06-07 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-06-09 | Perforation Treatment Performed - Jet Perforation |
2019-06-09 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-06-10 | Perforation Treatment Performed - Jet Perforation |
2019-06-10 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-06-11 | Perforation Treatment Performed - Jet Perforation |
2019-06-11 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-06-12 | Perforation Treatment Performed - Jet Perforation |
2019-06-12 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-06-13 | Perforation Treatment Performed - Jet Perforation |
2019-06-13 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-06-14 | Perforation Treatment Performed - Jet Perforation |
2019-06-14 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-06-15 | Perforation Treatment Performed - Jet Perforation |
2019-06-15 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-06-16 | Perforation Treatment Performed - Jet Perforation |
2019-06-16 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-06-17 | Perforation Treatment Performed - Jet Perforation |
2019-06-17 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-06-18 | Perforation Treatment Performed - Jet Perforation |
2019-06-18 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-06-19 | Perforation Treatment Performed - Jet Perforation |
2019-06-19 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-06-20 | Perforation Treatment Performed - Jet Perforation |
2019-06-20 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-06-21 | Perforation Treatment Performed - Jet Perforation |
2019-06-21 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-06-22 | Perforation Treatment Performed - Jet Perforation |
2019-06-22 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-06-23 | Perforation Treatment Performed - Jet Perforation |
2019-06-23 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-06-24 | Perforation Treatment Performed - Jet Perforation |
2019-06-24 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-06-25 | Perforation Treatment Performed - Jet Perforation |
2019-06-25 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-06-26 | Perforation Treatment Performed - Jet Perforation |
2019-06-26 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-06-27 | Perforation Treatment Performed - Jet Perforation |
2019-06-27 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-06-28 | Perforation Treatment Performed - Jet Perforation |
2019-06-28 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-06-29 | Perforation Treatment Performed - Jet Perforation |
2019-06-29 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-06-30 | Perforation Treatment Performed - Jet Perforation |
2019-06-30 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-07-01 | Perforation Treatment Performed - Jet Perforation |
2019-07-01 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-07-02 | Perforation Treatment Performed - Jet Perforation |
2019-07-02 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-09-22 | Well Began Production |
2019-09-22 | Well Fluid changed to Shale Gas Only |
2019-09-22 | Well Mode changed to Flowing |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2018-11-01 | Ensign Drilling Inc. | 785 | N/A | Drill To LD |
2018-09-08 | Ensign Drilling Inc. | 785 | N/A | Drill To LD |
2018-08-30 | Ensign Drilling Inc. | 785 | N/A | Set Surface |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2018-09-08 | 553.30 | Deviate (5 - 79 degrees) |
2018-11-02 | 3405.70 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2019-05-18 | Perforation | 7016.00 | 7016.50 | 16 |
2019-06-01 | Perforation | 6902.70 | 6903.20 | 12 |
2019-06-13 | Perforation | 5837.70 | 5838.20 | 16 |
2019-06-13 | Perforation | 5822.90 | 5823.40 | 12 |
2019-06-13 | Perforation | 5808.10 | 5808.60 | 12 |
2019-06-13 | Perforation | 5793.30 | 5793.80 | 10 |
2019-06-13 | Perforation | 5778.50 | 5779.00 | 8 |
2019-06-13 | Perforation | 5763.70 | 5764.20 | 8 |
2019-06-14 | Multi-Stage Fracture | 5763.20 | 5838.20 | 0 |
2019-06-14 | Perforation | 5748.90 | 5749.40 | 16 |
2019-06-14 | Perforation | 5734.10 | 5734.60 | 14 |
2019-06-14 | Perforation | 5719.30 | 5719.80 | 14 |
2019-06-01 | Perforation | 6887.90 | 6888.40 | 12 |
2019-06-14 | Perforation | 5704.60 | 5705.10 | 12 |
2019-06-14 | Perforation | 5689.80 | 5690.30 | 10 |
2019-06-14 | Perforation | 5675.00 | 5675.50 | 10 |
2019-06-15 | Multi-Stage Fracture | 5676.50 | 5749.40 | 0 |
2019-06-15 | Perforation | 5660.20 | 5660.70 | 16 |
2019-06-15 | Perforation | 5645.40 | 5645.90 | 14 |
2019-06-15 | Perforation | 5630.60 | 5631.10 | 14 |
2019-06-15 | Perforation | 5615.80 | 5616.30 | 12 |
2019-06-15 | Perforation | 5601.00 | 5601.50 | 10 |
2019-06-15 | Perforation | 5586.20 | 5586.70 | 10 |
2019-06-01 | Multi-Stage Fracture | 6887.90 | 6932.80 | 0 |
2019-06-16 | Multi-Stage Fracture | 5585.70 | 5660.70 | 0 |
2019-06-16 | Perforation | 5556.60 | 5557.10 | 16 |
2019-06-16 | Perforation | 5541.90 | 5542.40 | 14 |
2019-06-16 | Perforation | 5527.10 | 5527.60 | 14 |
2019-06-16 | Perforation | 5512.30 | 5512.80 | 12 |
2019-06-16 | Perforation | 5497.50 | 5498.00 | 10 |
2019-06-17 | Multi-Stage Fracture | 5497.00 | 5570.90 | 0 |
2019-06-17 | Perforation | 5482.70 | 5483.20 | 16 |
2019-06-17 | Perforation | 5467.90 | 5468.40 | 14 |
2019-06-17 | Perforation | 5453.10 | 5453.60 | 14 |
2019-06-01 | Perforation | 6873.10 | 6873.60 | 16 |
2019-06-17 | Perforation | 5438.30 | 5438.80 | 12 |
2019-06-17 | Perforation | 5423.50 | 5424.00 | 10 |
2019-06-17 | Perforation | 5408.70 | 5409.20 | 10 |
2019-06-17 | Multi-Stage Fracture | 5408.20 | 5483.20 | 0 |
2019-06-18 | Perforation | 5393.90 | 5394.40 | 16 |
2019-06-18 | Perforation | 5379.10 | 5379.60 | 14 |
2019-06-18 | Perforation | 5364.40 | 5364.90 | 14 |
2019-06-18 | Perforation | 5349.60 | 5350.10 | 12 |
2019-06-18 | Perforation | 5334.80 | 5335.30 | 10 |
2019-06-18 | Perforation | 5320.00 | 5320.50 | 10 |
2019-06-01 | Perforation | 6858.30 | 6858.80 | 14 |
2019-06-18 | Multi-Stage Fracture | 5319.50 | 5394.40 | 0 |
2019-06-18 | Perforation | 5305.20 | 5305.70 | 16 |
2019-06-18 | Perforation | 5290.40 | 5290.90 | 14 |
2019-06-18 | Perforation | 5275.60 | 5276.10 | 14 |
2019-06-18 | Perforation | 5260.80 | 5261.30 | 12 |
2019-06-18 | Perforation | 5246.00 | 5246.50 | 10 |
2019-06-18 | Perforation | 5231.20 | 5231.70 | 10 |
2019-06-19 | Multi-Stage Fracture | 5230.70 | 5305.70 | 0 |
2019-06-19 | Perforation | 5216.40 | 5216.90 | 16 |
2019-06-19 | Perforation | 5201.60 | 5202.10 | 14 |
2019-06-01 | Perforation | 6843.50 | 6844.00 | 12 |
2019-06-19 | Perforation | 5186.90 | 5187.40 | 14 |
2019-06-19 | Perforation | 5172.10 | 5172.60 | 12 |
2019-06-19 | Perforation | 5157.30 | 5157.80 | 10 |
2019-06-19 | Perforation | 5142.50 | 5143.00 | 10 |
2019-06-19 | Multi-Stage Fracture | 5142.00 | 5216.40 | 0 |
2019-06-19 | Perforation | 5127.70 | 5128.20 | 16 |
2019-06-19 | Perforation | 5112.90 | 5113.40 | 14 |
2019-06-19 | Perforation | 5098.10 | 5098.60 | 14 |
2019-06-19 | Perforation | 5083.30 | 5083.80 | 12 |
2019-06-19 | Perforation | 5068.50 | 5069.00 | 10 |
2019-06-01 | Perforation | 6828.70 | 6829.20 | 12 |
2019-06-19 | Perforation | 5053.70 | 5054.20 | 10 |
2019-06-20 | Multi-Stage Fracture | 5053.60 | 5127.80 | 0 |
2019-06-20 | Perforation | 5038.90 | 5039.40 | 16 |
2019-06-20 | Perforation | 5024.10 | 5024.60 | 14 |
2019-06-20 | Perforation | 5009.40 | 5009.90 | 14 |
2019-06-20 | Perforation | 4994.60 | 4995.10 | 12 |
2019-06-20 | Perforation | 4979.80 | 4980.30 | 10 |
2019-06-20 | Perforation | 4965.00 | 4965.50 | 10 |
2019-06-21 | Multi-Stage Fracture | 4964.50 | 5038.90 | 0 |
2019-06-21 | Perforation | 4950.20 | 4950.70 | 16 |
2019-06-01 | Multi-Stage Fracture | 6828.00 | 6873.90 | 0 |
2019-06-21 | Perforation | 4935.40 | 4935.90 | 14 |
2019-06-21 | Perforation | 4920.60 | 4921.10 | 14 |
2019-06-21 | Perforation | 4905.80 | 4906.30 | 12 |
2019-06-21 | Perforation | 4891.00 | 4891.50 | 10 |
2019-06-21 | Perforation | 4876.20 | 4876.70 | 10 |
2019-06-21 | Multi-Stage Fracture | 4875.70 | 4950.20 | 0 |
2019-06-21 | Perforation | 4861.40 | 4861.90 | 16 |
2019-06-21 | Perforation | 4846.70 | 4847.20 | 14 |
2019-06-21 | Perforation | 4831.90 | 4832.40 | 14 |
2019-06-21 | Perforation | 4817.10 | 4817.60 | 12 |
2019-06-02 | Perforation | 6813.90 | 6814.40 | 16 |
2019-06-21 | Perforation | 4802.30 | 4802.80 | 10 |
2019-06-21 | Perforation | 4787.50 | 4788.00 | 10 |
2019-06-22 | Multi-Stage Fracture | 4787.00 | 4861.50 | 0 |
2019-06-22 | Perforation | 4772.70 | 4773.20 | 16 |
2019-06-22 | Perforation | 4757.90 | 4758.40 | 14 |
2019-06-22 | Perforation | 4743.10 | 4743.60 | 14 |
2019-06-22 | Perforation | 4728.30 | 4728.80 | 12 |
2019-06-22 | Perforation | 4713.50 | 4714.00 | 10 |
2019-06-22 | Perforation | 4698.70 | 4699.20 | 10 |
2019-06-22 | Multi-Stage Fracture | 4698.20 | 4772.70 | 0 |
2019-06-02 | Perforation | 6799.10 | 6799.60 | 14 |
2019-06-23 | Perforation | 4683.90 | 4684.40 | 10 |
2019-06-23 | Perforation | 4669.20 | 4669.70 | 10 |
2019-06-23 | Perforation | 4654.40 | 4654.90 | 10 |
2019-06-23 | Perforation | 4639.60 | 4640.10 | 8 |
2019-06-23 | Perforation | 4624.80 | 4625.30 | 8 |
2019-06-23 | Perforation | 4610.00 | 4610.50 | 8 |
2019-06-23 | Multi-Stage Fracture | 4609.50 | 4683.90 | 0 |
2019-06-23 | Perforation | 4595.20 | 4595.70 | 10 |
2019-06-23 | Perforation | 4580.40 | 4580.90 | 10 |
2019-06-23 | Perforation | 4565.60 | 4566.10 | 10 |
2019-05-18 | Perforation | 7002.20 | 7002.70 | 12 |
2019-06-02 | Perforation | 6784.30 | 6784.80 | 12 |
2019-06-23 | Perforation | 4550.80 | 4551.30 | 8 |
2019-06-23 | Perforation | 4536.00 | 4536.50 | 8 |
2019-06-23 | Perforation | 4521.20 | 4521.70 | 8 |
2019-06-24 | Multi-Stage Fracture | 4520.70 | 4595.20 | 0 |
2019-06-24 | Perforation | 4506.40 | 4506.90 | 10 |
2019-06-24 | Perforation | 4491.70 | 4492.20 | 10 |
2019-06-24 | Perforation | 4476.90 | 4477.40 | 10 |
2019-06-24 | Perforation | 4462.10 | 4462.60 | 8 |
2019-06-24 | Perforation | 4447.30 | 4447.80 | 8 |
2019-06-24 | Perforation | 4432.50 | 4433.00 | 8 |
2019-06-02 | Perforation | 6769.50 | 6770.00 | 12 |
2019-06-24 | Multi-Stage Fracture | 4432.00 | 4506.40 | 0 |
2019-06-25 | Perforation | 4417.70 | 4418.20 | 10 |
2019-06-25 | Perforation | 4402.90 | 4403.40 | 10 |
2019-06-25 | Perforation | 4388.10 | 4388.60 | 10 |
2019-06-25 | Perforation | 4373.30 | 4373.80 | 8 |
2019-06-25 | Perforation | 4358.50 | 4359.00 | 8 |
2019-06-25 | Perforation | 4343.70 | 4344.20 | 8 |
2019-06-25 | Multi-Stage Fracture | 4343.20 | 4417.70 | 0 |
2019-06-25 | Perforation | 4328.90 | 4329.40 | 10 |
2019-06-25 | Perforation | 4314.20 | 4314.70 | 10 |
2019-06-02 | Multi-Stage Fracture | 6769.50 | 6814.40 | 0 |
2019-06-25 | Perforation | 4299.40 | 4299.90 | 10 |
2019-06-25 | Perforation | 4284.60 | 4285.10 | 8 |
2019-06-25 | Perforation | 4269.40 | 4269.90 | 8 |
2019-06-25 | Perforation | 4255.00 | 4255.50 | 8 |
2019-06-26 | Multi-Stage Fracture | 4255.00 | 4329.00 | 0 |
2019-06-26 | Perforation | 4240.20 | 4240.70 | 10 |
2019-06-26 | Perforation | 4225.40 | 4225.90 | 10 |
2019-06-26 | Perforation | 4210.60 | 4211.10 | 10 |
2019-06-26 | Perforation | 4195.80 | 4196.30 | 8 |
2019-06-26 | Perforation | 4181.00 | 4181.50 | 8 |
2019-06-03 | Perforation | 6763.80 | 6764.30 | 16 |
2019-06-26 | Perforation | 4166.20 | 4166.70 | 8 |
2019-06-27 | Multi-Stage Fracture | 4166.00 | 4240.50 | 0 |
2019-06-27 | Perforation | 4151.50 | 4152.00 | 10 |
2019-06-27 | Perforation | 4136.70 | 4137.20 | 10 |
2019-06-27 | Perforation | 4121.90 | 4122.40 | 10 |
2019-06-27 | Perforation | 4107.10 | 4107.60 | 8 |
2019-06-27 | Perforation | 4092.30 | 4092.80 | 8 |
2019-06-27 | Perforation | 4077.50 | 4078.00 | 8 |
2019-06-28 | Multi-Stage Fracture | 4077.00 | 4151.50 | 0 |
2019-06-28 | Perforation | 4062.70 | 4063.20 | 10 |
2019-06-03 | Perforation | 6762.70 | 6763.20 | 12 |
2019-06-28 | Perforation | 4047.90 | 4048.40 | 10 |
2019-06-28 | Perforation | 4033.10 | 4033.60 | 10 |
2019-06-28 | Perforation | 4018.30 | 4018.80 | 8 |
2019-06-28 | Perforation | 4003.50 | 4004.00 | 8 |
2019-06-28 | Perforation | 3988.70 | 3989.20 | 8 |
2019-06-29 | Multi-Stage Fracture | 3988.20 | 4062.70 | 0 |
2019-06-29 | Perforation | 3974.00 | 3974.50 | 10 |
2019-06-29 | Perforation | 3959.20 | 3959.70 | 10 |
2019-06-29 | Perforation | 3944.40 | 3944.90 | 10 |
2019-06-29 | Perforation | 3929.60 | 3930.10 | 8 |
2019-06-03 | Perforation | 6762.10 | 6762.60 | 12 |
2019-06-29 | Perforation | 3914.80 | 3915.30 | 8 |
2019-06-29 | Perforation | 3900.00 | 3900.50 | 8 |
2019-06-29 | Multi-Stage Fracture | 3899.50 | 3974.00 | 0 |
2019-06-29 | Perforation | 3885.20 | 3885.70 | 10 |
2019-06-29 | Perforation | 3870.40 | 3870.90 | 10 |
2019-06-29 | Perforation | 3855.60 | 3856.10 | 10 |
2019-06-29 | Perforation | 3840.80 | 3841.30 | 8 |
2019-06-29 | Perforation | 3826.00 | 3826.50 | 8 |
2019-06-29 | Perforation | 3811.20 | 3811.70 | 8 |
2019-06-30 | Multi-Stage Fracture | 3811.00 | 3885.50 | 0 |
2019-06-03 | Perforation | 6761.50 | 6762.00 | 14 |
2019-06-30 | Perforation | 3796.50 | 3797.00 | 10 |
2019-06-30 | Perforation | 3781.70 | 3782.20 | 10 |
2019-06-30 | Perforation | 3766.90 | 3767.40 | 10 |
2019-06-30 | Perforation | 3752.10 | 3752.60 | 8 |
2019-06-30 | Perforation | 3737.30 | 3737.80 | 8 |
2019-06-30 | Perforation | 3722.50 | 3723.00 | 8 |
2019-07-01 | Multi-Stage Fracture | 3722.40 | 3796.80 | 0 |
2019-07-01 | Perforation | 3707.70 | 3708.20 | 10 |
2019-07-01 | Perforation | 3692.90 | 3693.40 | 10 |
2019-07-01 | Perforation | 3678.10 | 3678.60 | 10 |
2019-06-03 | Perforation | 6760.90 | 6761.40 | 16 |
2019-07-01 | Perforation | 3663.30 | 3663.80 | 8 |
2019-07-01 | Perforation | 3648.50 | 3649.00 | 8 |
2019-07-01 | Perforation | 3633.70 | 3634.20 | 8 |
2019-07-01 | Multi-Stage Fracture | 3633.20 | 3707.70 | 0 |
2019-07-02 | Perforation | 3619.00 | 3619.50 | 10 |
2019-07-02 | Perforation | 3604.20 | 3604.70 | 10 |
2019-07-02 | Perforation | 3589.40 | 3589.90 | 10 |
2019-07-02 | Perforation | 3574.60 | 3575.10 | 8 |
2019-07-02 | Perforation | 3559.80 | 3560.30 | 8 |
2019-07-02 | Perforation | 3545.00 | 3545.50 | 8 |
2019-06-03 | Perforation | 6738.50 | 6739.00 | 14 |
2019-07-02 | Multi-Stage Fracture | 3544.80 | 3619.50 | 0 |
2019-06-03 | Perforation | 6724.50 | 6725.00 | 12 |
2019-05-18 | Perforation | 6988.40 | 6988.90 | 12 |
2019-06-03 | Perforation | 6710.40 | 6710.90 | 12 |
2019-06-04 | Multi-Stage Fracture | 6710.00 | 6746.00 | 0 |
2019-06-04 | Perforation | 6695.60 | 6696.10 | 16 |
2019-06-04 | Perforation | 6680.80 | 6681.30 | 14 |
2019-06-04 | Perforation | 6666.00 | 6666.50 | 12 |
2019-06-04 | Perforation | 6651.20 | 6651.70 | 12 |
2019-06-04 | Multi-Stage Fracture | 6651.20 | 6696.10 | 0 |
2019-06-04 | Perforation | 6636.40 | 6636.90 | 16 |
2019-06-04 | Perforation | 6621.60 | 6622.10 | 12 |
2019-06-04 | Perforation | 6606.80 | 6607.30 | 12 |
2019-05-18 | Perforation | 6974.60 | 6975.10 | 10 |
2019-06-04 | Perforation | 6592.00 | 6592.50 | 10 |
2019-06-04 | Perforation | 6577.30 | 6577.80 | 8 |
2019-06-04 | Perforation | 6562.50 | 6563.00 | 8 |
2019-06-06 | Multi-Stage Fracture | 6562.00 | 6637.20 | 0 |
2019-06-06 | Perforation | 6547.70 | 6548.20 | 16 |
2019-06-06 | Perforation | 6532.90 | 6533.40 | 12 |
2019-06-06 | Perforation | 6518.10 | 6518.60 | 12 |
2019-06-06 | Perforation | 6503.30 | 6503.80 | 10 |
2019-06-06 | Perforation | 6488.50 | 6489.00 | 8 |
2019-06-06 | Perforation | 6473.70 | 6474.20 | 8 |
2019-05-18 | Perforation | 6960.80 | 6961.30 | 8 |
2019-06-06 | Multi-Stage Fracture | 6473.20 | 6548.20 | 0 |
2019-06-06 | Perforation | 6458.90 | 6459.40 | 16 |
2019-06-06 | Perforation | 6444.10 | 6444.60 | 12 |
2019-06-06 | Perforation | 6429.30 | 6429.80 | 12 |
2019-06-06 | Perforation | 6414.50 | 6415.00 | 10 |
2019-06-06 | Perforation | 6399.80 | 6400.30 | 8 |
2019-06-06 | Perforation | 6385.00 | 6385.50 | 8 |
2019-06-07 | Multi-Stage Fracture | 6385.00 | 6459.90 | 0 |
2019-06-07 | Perforation | 6370.20 | 6370.70 | 16 |
2019-06-07 | Perforation | 6355.40 | 6355.90 | 12 |
2019-05-18 | Perforation | 6947.00 | 6947.50 | 8 |
2019-06-07 | Perforation | 6340.60 | 6341.10 | 12 |
2019-06-07 | Perforation | 6325.80 | 6326.30 | 10 |
2019-06-07 | Perforation | 6311.00 | 6311.50 | 8 |
2019-06-07 | Perforation | 6296.20 | 6296.70 | 8 |
2019-06-09 | Multi-Stage Fracture | 6296.00 | 6370.90 | 0 |
2019-06-09 | Perforation | 6281.40 | 6281.90 | 16 |
2019-06-09 | Perforation | 6266.60 | 6267.10 | 12 |
2019-06-09 | Perforation | 6251.80 | 6252.30 | 12 |
2019-06-09 | Perforation | 6237.10 | 6237.60 | 10 |
2019-06-09 | Perforation | 6222.30 | 6222.80 | 8 |
2019-06-01 | Multi-Stage Fracture | 6947.00 | 7021.00 | 0 |
2019-06-09 | Perforation | 6207.50 | 6208.00 | 8 |
2019-06-10 | Multi-Stage Fracture | 6207.40 | 6282.00 | 0 |
2019-06-10 | Perforation | 6192.70 | 6193.20 | 16 |
2019-06-10 | Perforation | 6177.90 | 6178.40 | 12 |
2019-06-10 | Perforation | 6163.10 | 6163.60 | 12 |
2019-06-10 | Perforation | 6148.30 | 6148.80 | 10 |
2019-06-10 | Perforation | 6133.50 | 6134.00 | 8 |
2019-06-10 | Perforation | 6118.70 | 6119.20 | 8 |
2019-06-11 | Multi-Stage Fracture | 6118.20 | 6193.20 | 0 |
2019-06-11 | Perforation | 6103.90 | 6104.40 | 16 |
2019-06-01 | Perforation | 6932.30 | 6932.80 | 16 |
2019-06-11 | Perforation | 6089.10 | 6089.60 | 12 |
2019-06-11 | Perforation | 6074.30 | 6074.80 | 12 |
2019-06-11 | Perforation | 6059.60 | 6060.10 | 10 |
2019-06-11 | Perforation | 6044.80 | 6045.30 | 8 |
2019-06-11 | Perforation | 6030.00 | 6030.50 | 8 |
2019-06-12 | Multi-Stage Fracture | 6029.50 | 6104.90 | 0 |
2019-06-12 | Perforation | 6015.20 | 6015.70 | 16 |
2019-06-12 | Perforation | 6000.40 | 6000.90 | 12 |
2019-06-12 | Perforation | 5985.60 | 5986.10 | 12 |
2019-06-12 | Perforation | 5970.80 | 5971.30 | 10 |
2019-06-01 | Perforation | 6917.50 | 6918.00 | 14 |
2019-06-12 | Perforation | 5956.00 | 5956.50 | 8 |
2019-06-12 | Perforation | 5941.20 | 5941.70 | 8 |
2019-06-12 | Multi-Stage Fracture | 5941.20 | 6015.20 | 0 |
2019-06-13 | Perforation | 5926.40 | 5926.90 | 16 |
2019-06-13 | Perforation | 5911.60 | 5912.10 | 12 |
2019-06-13 | Perforation | 5896.80 | 5897.30 | 12 |
2019-06-13 | Perforation | 5882.10 | 5882.60 | 10 |
2019-06-13 | Perforation | 5867.30 | 5867.80 | 8 |
2019-06-13 | Perforation | 5852.50 | 5853.00 | 8 |
2019-06-13 | Multi-Stage Fracture | 5852.00 | 5925.90 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2019-06-01 | 2019-07-02 | 3,254 | 91,036 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | 7732-18-5 | 100 | 87.4336 | N/A | |||
FRAC SAND. 40/70 WHITE | BJ Services | Crystalline Silica (Quartz) | 14808-60-7 | 100 | 9.679 | N/A | ||
FRAC SAND. 50/140 WHITE (OTTAWA TYPE) | BJ Services | Crystalline Silica (Quartz) | 14808-60-7 | 100 | 2.589 | N/A | ||
Hydrochloric Acid 28% | BJ Services | Acid | Hydrochloric acid | 7647-01-0 | 100 | 0.1134 | N/A | |
Water | 7732-18-5 | 100 | 0.1134 | N/A | ||||
AQUCAR DB 20 | BJ Services | Bactericide/Biocide | 2.2-Dibromo-3-nitrilopropionamide | 10222-01-2 | 100 | 0.0085 | N/A | |
Dibromoacetonitrile | 3252-43-5 | 100 | 0.0085 | N/A | ||||
Polyethylene Glycol | 25322-68-3 | 100 | 0.0085 | N/A | ||||
Sodium Bromide | 7647-15-6 | 100 | 0.0085 | N/A | ||||
Water | 7732-18-5 | 100 | 0.0085 | N/A | ||||
MatrixCare CI-01 | BJ Services | Corrosion Inhibitor | 1.2-ethanediol | 107-21-1 | 100 | 0.0013 | N/A | |
1-decanol | 112-30-1 | 100 | 0.0013 | N/A | ||||
1-octanol | 111-87-5 | 100 | 0.0013 | N/A | ||||
2-butoxy ethanol | 111-76-2 | 100 | 0.0013 | N/A | ||||
2-propanol | 67-63-0 | 100 | 0.0013 | N/A | ||||
2-propenal. 3-phenyl- | 104-55-2 | 100 | 0.0013 | N/A | ||||
alcohols. C14-15. ethoxylated | 68951-67-7 | 100 | 0.0013 | N/A | ||||
azabenzene derivatives. quaternized. chloride salt | 15619-48-4 | 100 | 0.0013 | N/A | ||||
formamide. N.N-dimethyl- | 68-12-2 | 100 | 0.0013 | N/A | ||||
phosphoric acid. triethyl ester | 78-40-0 | 100 | 0.0013 | N/A | ||||
Water | 7732-18-5 | 100 | 0.0013 | N/A | ||||
FP-12L | BJ Services | Defoamer | Methylcellulose | 9004-67-5 | 100 | 0 | N/A | |
Non-hazardous | Not Available | 100 | 0 | N/A | ||||
Octamethylcyclotetrasiloxane | 556-67-2 | 100 | 0.0001 | N/A | ||||
Polydimethylsiloxane | 63148-62-9 | 100 | 0 | N/A | ||||
Water | 7732-18-5 | 100 | 0 | N/A | ||||
D-3 | BJ Services | Demulsifier | 2-Ethylhexanol | 104-76-7 | 100 | 0.0009 | N/A | |
Ethoxylated alcohol. branched | 78330-19-5 | 100 | 0.0009 | N/A | ||||
Ethoxylated alcohol. branched | 78330-20-8 | 100 | 0.0009 | N/A | ||||
Heavy Aromatic Naphtha | 64742-94-5 | 100 | 0.0009 | N/A | ||||
Isopropanol | 67-63-0 | 100 | 0.0009 | N/A | ||||
Methanol | 67-56-1 | 100 | 0.0009 | N/A | ||||
Naphthalene | 91-20-3 | 100 | 0.0009 | N/A | ||||
Organic Sulfonic Acid | 10638 | 100 | 0.0009 | N/A | ||||
Oxyalkylated Polymer | 10638 | 100 | 0.0009 | N/A | ||||
Polyalkylene glycol | 10638 | 100 | 0.0009 | N/A | ||||
ThinFrac HV FRHV-01 | BJ Services | Friction Reducer | 1.2 Propanediol carbonate | 108-32-7 | 100 | 0.1267 | N/A | |
Distillates (petroleum) hydrotreated light paraffinic | 64742-55-8 | 100 | 0.1267 | N/A | ||||
Lecitihins. soya | 8030-76-0 | 100 | 0.1267 | N/A | ||||
polymer | Trade Secret | 100 | 0.1267 | N/A | ||||
Water | 7732-18-5 | 100 | 0.1267 | N/A | ||||
ResCare IC 800 | BJ Services | Iron Control | Trisodium nitrilotriacetate monohydrate | 18662-53-8 | 100 | 0.0019 | N/A | |
FraCare SI 14 | BJ Services | Scale Inhibitor | Phosphinocarboxylic acid copolymer | 110224-99-2 | 100 | 0.0219 | N/A | |
Water | 7732-18-5 | 100 | 0.0219 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2019-05-29 | 2019-07-02 | Surface Water - River | 70379 |
2019-05-15 | 2019-07-02 | Groundwater - Non-saline less than or equal to 150m deep | 8350 |
2019-05-15 | 2019-07-02 | Groundwater - Non-saline less than or equal to 150m deep | 11629 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2019 | 1593 | 0.0 | 0.0 | 0.0 |
2020 | 2033 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2018-09-12 | Lost Circulation | 2562.00 | 2562.00 |
2018-11-04 | Lost Circulation | 4284.00 | 4284.00 |
2018-11-06 | Lost Circulation | 4286.00 | 4286.00 |
2018-11-12 | Lost Circulation | 5922.00 | 5922.00 |
2019-07-02 | No Incident Encountered | 0.00 | 0.00 |
2019-07-31 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]