X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0625201902002

Well Details

Well ID: 0625201902002
Loading map...
Location: 00/02-19-062-20W5/2
Location Alias: 00/02-19-62-20 W5M
Location Alias 2: 00/02-19-062-20 W5/02
Country: Canada
Province: Alberta
Township: 062
Meridian: 5
Range: 20
Section: 19
County/Municipality: Municipal District of Greenview No. 16
Well Name: ACL KAYBOBS 2-19-62-20
Operator Name: Paramount Resources Ltd.
License Number: 0023985
License Date: 1963-03-15
License Status: Issued
Spud Date: 1963-03-19
Final Drill Date: 1963-04-05
Well Total Depth: 2158.00 m
Surface Hole Latitude: 54.372243
Surface Hole Longitude: -116.985809

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1963-03-15 Obtained License
1963-04-05 Finished Drilling
1963-04-05 Well Mode changed to Drilled and Cased
1963-04-06 Production Casing Operation Performed
1963-05-23 Perforation Treatment Performed - Acid Wash - No Pressure
1963-05-23 Perforation Treatment Performed - Jet Perforation
1963-05-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-04-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-06-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-06-24 Plug Back Performed
1998-06-28 Perforation Treatment Performed - Jet Perforation
1998-07-04 Perforation Treatment Performed - Fractured
1998-11-01 Well Began Production
1998-11-01 Well Fluid changed to Gas
1998-11-01 Well Mode changed to Flowing
2002-01-01 Well Fluid changed to Gas
2002-01-01 Well Mode changed to Pumping

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1963-05-23 Perforation 2133.30 2134.80 7
1963-05-23 Perforation 2135.40 2139.10 7
1963-05-23 Acid Wash 2133.30 2139.10 0
1963-05-24 Acid Treatment 2133.30 2139.10 0
1985-04-03 Acid Treatment 2133.30 2139.10 0
1998-06-24 Packing Device Capped w/Cement 2117.00 2125.00 0
1998-06-24 Packing Device Capped w/Cement 2117.00 2125.00 0
1998-06-28 Perforation 1736.00 1737.90 20
1998-07-04 Fracture 1736.00 1737.90 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1998 1248 0.0 0.0 0.0
1999 8620 0.0 0.0 0.0
2000 8759 0.0 0.0 0.0
2001 8759 0.0 0.0 0.0
2002 5085 0.0 0.0 0.0
2003 8135 0.0 0.0 0.0
2004 8714 0.0 0.0 0.0
2005 7967 0.0 0.0 0.0
2006 8735 0.0 0.0 0.0
2007 8759 0.0 0.0 0.0
2008 8735 0.0 0.0 0.0
2009 8207 0.0 0.0 0.0
2010 8663 0.0 0.0 0.0
2011 8328 0.0 0.0 0.0
2012 8746 0.0 0.0 0.0
2013 8231 0.0 0.0 0.0
2014 8469 0.0 0.0 0.0
2015 8159 0.0 0.0 0.0
2016 8710 0.0 0.0 0.0
2017 8304 0.0 0.0 0.0
2018 8077 0.0 0.0 0.0
2019 8374 0.0 0.0 0.0
2020 2131 0.0 0.0 0.0

For data sources see[5]

References