X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0625201810000

Well Details

Well ID: 0625201810000
Loading map...
Location: 00/10-18-062-20W5/0
Location Alias: 00/10-18-62-20 W5M
Location Alias 2: 00/10-18-062-20 W5/00
Country: Canada
Province: Alberta
Township: 062
Meridian: 5
Range: 20
Section: 18
County/Municipality: Municipal District of Greenview No. 16
Well Name: ACL KAYBOBS 10-18-62-20
Operator Name: Paramount Resources Ltd.
License Number: 0024974
License Date: 1963-10-15
License Status: Issued
Spud Date: 1963-10-15
Final Drill Date: 1963-10-28
Well Total Depth: 2139.70 m
Surface Hole Latitude: 54.365010
Surface Hole Longitude: -116.985778

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1963-10-15 Obtained License
1963-10-28 Finished Drilling
1963-10-28 Well Mode changed to Drilled and Cased
1963-10-29 Production Casing Operation Performed
1963-10-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1963-10-30 Perforation Treatment Performed - Bullet Perforation
1963-11-06 Well Began Production
1963-11-06 Well Fluid changed to Crude Oil
1963-11-06 Well Mode changed to Flowing
1971-02-27 Well Fluid changed to Crude Oil
1971-02-27 Well Mode changed to Pumping
1996-12-01 Well Fluid changed to Crude Oil
1996-12-01 Well Mode changed to Pumping
1996-12-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-12-12 Plug Back Performed
1996-12-12 Well Fluid changed to Crude Oil
1996-12-12 Well Log Performed
1996-12-12 Well Mode changed to Abandoned Zone
1996-12-14 Perforation Treatment Performed - Jet Perforation
1996-12-14 Well Log Performed
1996-12-16 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1963-10-30 Bullet Perforation 2122.30 2127.50 7
1963-10-30 Acid Treatment 2122.30 2127.50 0
1996-12-12 Packing Device Capped w/Cement 2111.00 2119.00 0
1996-12-12 Packing Device Capped w/Cement 2111.00 2119.00 0
1996-12-14 Perforation 1723.50 1728.50 20
1996-12-14 Perforation 1723.50 1728.50 20
1996-12-16 Fracture 1723.50 1728.50 0
1996-12-16 Fracture 1723.50 1728.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 4329 0.0 0.0 0.0
1968 5292 0.0 0.0 0.0
1969 6366 0.0 0.0 0.0
1970 4418 0.0 0.0 0.0
1971 7278 0.0 0.0 0.0
1972 7909 0.0 0.0 0.0
1973 7858 0.0 0.0 0.0
1974 8128 0.0 0.0 0.0
1975 4312 0.0 0.0 0.0
1976 6304 0.0 0.0 0.0
1977 7185 0.0 0.0 0.0
1978 6765 0.0 0.0 0.0
1979 7979 0.0 0.0 0.0
1980 7487 0.0 0.0 0.0
1981 8108 0.0 0.0 0.0
1982 8566 0.0 0.0 0.0
1983 5279 0.0 0.0 0.0
1984 7607 0.0 0.0 0.0
1985 7697 0.0 0.0 0.0
1987 6179 0.0 0.0 0.0
1988 6532 0.0 0.0 0.0
1989 6168 0.0 0.0 0.0
1990 3701 0.0 0.0 0.0
1991 3231 0.0 0.0 0.0

For data sources see[5]

References