X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0625201609020

Well Details

Well ID: 0625201609020
Loading map...
Location: 02/09-16-062-20W5/0
Location Alias: 02/09-16-62-20 W5M
Location Alias 2: 02/09-16-062-20 W5/00
Country: Canada
Province: Alberta
Township: 062
Meridian: 5
Range: 20
Section: 16
County/Municipality: Municipal District of Greenview No. 16
Well Name: CHEVRON 102 HZ KAYBOBS 9-16-62-20
Operator Name: Chevron Canada Limited
License Number: 0487754
License Date: 2018-01-22
License Status: Issued
Spud Date: 2018-08-07
Final Drill Date: 2018-10-17
Well Total Depth: 6954.00 m
Surface Hole Latitude: 54.362513
Surface Hole Longitude: -116.979609

For data sources see[1][2]

Well History

Date Event
2018-01-22 Obtained License
2018-08-07 Lost Circulation Occurred
2018-08-08 Lost Circulation Occurred
2018-08-09 Lost Circulation Occurred
2018-08-09 Surface Casing Operation Performed
2018-08-10 Lost Circulation Occurred
2018-08-25 Direction Drilling Operation Performed - Deviate
2018-08-30 Intermediate Casing Operation Performed
2018-08-30 Lost Circulation Occurred
2018-10-13 Direction Drilling Operation Performed - Horizontal
2018-10-17 Finished Drilling
2018-10-17 Well Log Performed
2018-10-17 Well Mode changed to Drilled and Cased
2018-10-18 Well Log Performed
2018-10-20 Production Casing Operation Performed
2018-10-21 Rig Released
2019-01-13 Perforation Treatment Performed - Jet Perforation
2019-01-17 Perforation Treatment Performed - Jet Perforation
2019-01-22 Perforation Treatment Performed - Multi-Stage Fracture
2019-01-24 Perforation Treatment Performed - Jet Perforation
2019-01-25 Perforation Treatment Performed - Jet Perforation
2019-01-25 Perforation Treatment Performed - Multi-Stage Fracture
2019-01-26 Perforation Treatment Performed - Jet Perforation
2019-01-26 Perforation Treatment Performed - Multi-Stage Fracture
2019-01-27 Perforation Treatment Performed - Jet Perforation
2019-01-27 Perforation Treatment Performed - Multi-Stage Fracture
2019-01-28 Perforation Treatment Performed - Jet Perforation
2019-01-29 Perforation Treatment Performed - Multi-Stage Fracture
2019-01-30 Perforation Treatment Performed - Jet Perforation
2019-01-30 Perforation Treatment Performed - Multi-Stage Fracture
2019-01-31 Perforation Treatment Performed - Jet Perforation
2019-01-31 Perforation Treatment Performed - Multi-Stage Fracture
2019-02-01 Perforation Treatment Performed - Jet Perforation
2019-02-02 Perforation Treatment Performed - Multi-Stage Fracture
2019-02-03 Perforation Treatment Performed - Jet Perforation
2019-02-04 Perforation Treatment Performed - Multi-Stage Fracture
2019-02-05 Perforation Treatment Performed - Jet Perforation
2019-02-05 Perforation Treatment Performed - Multi-Stage Fracture
2019-02-06 Perforation Treatment Performed - Jet Perforation
2019-02-06 Perforation Treatment Performed - Multi-Stage Fracture
2019-02-07 Perforation Treatment Performed - Jet Perforation
2019-02-07 Perforation Treatment Performed - Multi-Stage Fracture
2019-02-14 Perforation Treatment Performed - Jet Perforation
2019-02-14 Perforation Treatment Performed - Multi-Stage Fracture
2019-02-15 Perforation Treatment Performed - Jet Perforation
2019-02-15 Perforation Treatment Performed - Multi-Stage Fracture
2019-02-16 Perforation Treatment Performed - Jet Perforation
2019-02-16 Perforation Treatment Performed - Multi-Stage Fracture
2019-02-17 Perforation Treatment Performed - Jet Perforation
2019-02-17 Perforation Treatment Performed - Multi-Stage Fracture
2019-02-18 Perforation Treatment Performed - Jet Perforation
2019-02-18 Perforation Treatment Performed - Multi-Stage Fracture
2019-02-19 Perforation Treatment Performed - Jet Perforation
2019-02-19 Perforation Treatment Performed - Multi-Stage Fracture
2019-02-21 Perforation Treatment Performed - Jet Perforation
2019-02-21 Perforation Treatment Performed - Multi-Stage Fracture
2019-02-22 Perforation Treatment Performed - Jet Perforation
2019-02-22 Perforation Treatment Performed - Multi-Stage Fracture
2019-02-23 Perforation Treatment Performed - Jet Perforation
2019-02-24 Perforation Treatment Performed - Jet Perforation
2019-02-24 Perforation Treatment Performed - Multi-Stage Fracture
2019-02-25 Perforation Treatment Performed - Multi-Stage Fracture
2019-02-26 Perforation Treatment Performed - Jet Perforation
2019-02-26 Perforation Treatment Performed - Multi-Stage Fracture
2019-02-27 Perforation Treatment Performed - Jet Perforation
2019-02-27 Perforation Treatment Performed - Multi-Stage Fracture
2019-02-28 Perforation Treatment Performed - Jet Perforation
2019-02-28 Perforation Treatment Performed - Multi-Stage Fracture
2019-03-01 Perforation Treatment Performed - Jet Perforation
2019-03-01 Perforation Treatment Performed - Multi-Stage Fracture
2019-03-03 Perforation Treatment Performed - Jet Perforation
2019-03-03 Perforation Treatment Performed - Multi-Stage Fracture
2019-03-04 Perforation Treatment Performed - Jet Perforation
2019-03-04 Perforation Treatment Performed - Multi-Stage Fracture
2019-03-05 Perforation Treatment Performed - Jet Perforation
2019-03-05 Perforation Treatment Performed - Multi-Stage Fracture
2019-03-06 Perforation Treatment Performed - Jet Perforation
2019-03-06 Perforation Treatment Performed - Multi-Stage Fracture
2019-03-07 Perforation Treatment Performed - Jet Perforation
2019-03-08 Perforation Treatment Performed - Multi-Stage Fracture
2019-03-10 Perforation Treatment Performed - Jet Perforation
2019-03-11 Perforation Treatment Performed - Jet Perforation
2019-03-11 Perforation Treatment Performed - Multi-Stage Fracture
2019-03-12 Perforation Treatment Performed - Jet Perforation
2019-03-12 Perforation Treatment Performed - Multi-Stage Fracture
2019-05-13 Well Began Production
2019-05-13 Well Fluid changed to Shale Gas Only
2019-05-13 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2018-08-07 Ensign Drilling Inc. 144 N/A Set Surface
2018-08-08 Ensign Drilling Inc. 144 N/A Resumption
2018-08-09 Ensign Drilling Inc. 144 N/A Resumption

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2018-08-25 474.70 Deviate (5 - 79 degrees)
2018-10-13 3412.70 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2019-01-13 Perforation 6876.00 6878.00 1
2019-01-24 Perforation 6754.00 6754.50 12
2019-02-15 Perforation 5599.00 5599.50 12
2019-02-15 Perforation 5584.00 5584.50 12
2019-02-15 Perforation 5569.00 5569.50 10
2019-02-15 Perforation 5554.00 5554.50 8
2019-02-15 Perforation 5539.00 5539.50 8
2019-02-15 Multi-Stage Fracture 5539.00 5614.50 0
2019-02-16 Perforation 5524.00 5524.50 16
2019-02-16 Perforation 5509.00 5509.50 12
2019-02-16 Perforation 5494.00 5494.50 12
2019-02-16 Perforation 5479.00 5479.50 10
2019-01-24 Perforation 6739.00 6739.50 10
2019-02-16 Perforation 5464.00 5464.50 8
2019-02-16 Perforation 5449.00 5449.50 8
2019-02-16 Multi-Stage Fracture 5449.00 5524.50 0
2019-02-17 Perforation 5434.00 5434.50 16
2019-02-17 Perforation 5419.00 5419.50 12
2019-02-17 Perforation 5404.00 5404.50 12
2019-02-17 Perforation 5389.00 5389.50 10
2019-02-17 Perforation 5374.00 5374.50 8
2019-02-17 Perforation 5359.00 5359.50 8
2019-02-17 Multi-Stage Fracture 5359.00 5434.50 0
2019-01-24 Perforation 6724.00 6724.50 8
2019-02-17 Perforation 5344.00 5344.50 16
2019-02-17 Perforation 5329.00 5329.50 12
2019-02-17 Perforation 5314.00 5314.50 12
2019-02-17 Perforation 5299.00 5299.50 10
2019-02-17 Perforation 5284.00 5284.50 8
2019-02-17 Perforation 5269.00 5269.50 8
2019-02-18 Perforation 5254.00 5254.50 16
2019-02-18 Perforation 5239.00 5239.50 12
2019-02-18 Perforation 5224.00 5224.50 12
2019-02-18 Perforation 5209.00 5209.50 10
2019-01-24 Perforation 6709.00 6709.50 8
2019-02-18 Perforation 5194.00 5194.50 8
2019-02-18 Perforation 5179.00 5179.50 8
2019-02-18 Multi-Stage Fracture 5269.00 5344.50 0
2019-02-19 Perforation 5164.00 5164.50 16
2019-02-19 Perforation 5149.00 5149.50 12
2019-02-19 Perforation 5134.00 5134.50 12
2019-02-19 Perforation 5119.00 5119.50 10
2019-02-19 Perforation 5104.00 5104.50 8
2019-02-19 Perforation 5089.00 5089.50 8
2019-02-19 Multi-Stage Fracture 5179.00 5254.50 0
2019-01-25 Multi-Stage Fracture 6709.00 6784.50 0
2019-02-21 Perforation 5074.00 5074.50 16
2019-02-21 Multi-Stage Fracture 5089.00 5164.50 0
2019-02-21 Perforation 5059.00 5059.50 12
2019-02-21 Perforation 5044.00 5044.50 12
2019-02-21 Perforation 5029.00 5029.50 10
2019-02-21 Perforation 5014.00 5014.50 8
2019-02-21 Perforation 4999.00 4999.50 8
2019-02-21 Multi-Stage Fracture 4999.00 5074.50 0
2019-02-22 Perforation 4984.00 4984.50 16
2019-02-22 Perforation 4969.00 4969.50 12
2019-01-25 Perforation 6694.00 6694.50 16
2019-02-22 Perforation 4954.00 4954.50 12
2019-02-22 Perforation 4939.00 4939.50 10
2019-02-22 Perforation 4924.00 4924.50 8
2019-02-22 Perforation 4909.00 4909.50 8
2019-02-22 Multi-Stage Fracture 4909.00 4984.50 0
2019-02-23 Perforation 4894.00 4894.50 16
2019-02-23 Perforation 4879.00 4879.50 12
2019-02-23 Perforation 4864.00 4864.50 12
2019-02-23 Perforation 4849.00 4849.50 10
2019-02-23 Perforation 4834.00 4834.50 8
2019-01-25 Perforation 6679.00 6679.50 12
2019-02-23 Perforation 4819.00 4819.50 8
2019-02-24 Multi-Stage Fracture 4819.00 4894.50 0
2019-02-24 Perforation 4804.00 4804.50 16
2019-02-24 Perforation 4789.00 4789.50 12
2019-02-24 Perforation 4774.00 4774.50 12
2019-02-24 Perforation 4759.00 4759.50 10
2019-02-24 Perforation 4744.00 4744.50 8
2019-02-24 Perforation 4729.00 4729.50 8
2019-02-25 Multi-Stage Fracture 4729.00 4804.50 0
2019-02-26 Perforation 4714.00 4714.50 16
2019-01-25 Perforation 6664.00 6664.50 12
2019-02-26 Perforation 4699.00 4699.50 12
2019-02-26 Perforation 4684.00 4684.50 12
2019-02-26 Perforation 4669.00 4669.50 10
2019-02-26 Perforation 4654.00 4654.50 8
2019-02-26 Perforation 4639.00 4639.50 8
2019-02-26 Multi-Stage Fracture 4639.00 4714.50 0
2019-02-27 Perforation 4624.00 4624.50 16
2019-02-27 Perforation 4609.00 4609.50 12
2019-02-27 Perforation 4594.00 4594.50 12
2019-02-27 Perforation 4579.00 4579.50 10
2019-01-25 Perforation 6649.00 6649.50 10
2019-02-27 Perforation 4564.00 4564.50 8
2019-02-27 Perforation 4549.00 4549.50 8
2019-02-27 Multi-Stage Fracture 4549.00 4624.50 0
2019-02-28 Perforation 4534.00 4534.50 16
2019-02-28 Perforation 4519.00 4519.50 12
2019-02-28 Perforation 4504.00 4504.50 12
2019-02-28 Perforation 4489.00 4489.50 10
2019-02-28 Perforation 4474.00 4474.50 8
2019-02-28 Perforation 4459.00 4459.50 8
2019-02-28 Multi-Stage Fracture 4459.00 4534.50 0
2019-01-25 Perforation 6634.00 6634.50 8
2019-03-01 Perforation 4444.00 4444.50 16
2019-03-01 Perforation 4429.00 4429.50 12
2019-03-01 Perforation 4414.00 4414.50 12
2019-03-01 Perforation 4399.00 4399.50 10
2019-03-01 Perforation 4384.00 4384.50 8
2019-03-01 Perforation 4369.00 4369.50 8
2019-03-01 Multi-Stage Fracture 4369.00 4444.50 0
2019-03-03 Perforation 4354.00 4354.50 16
2019-03-03 Perforation 4339.00 4339.50 12
2019-03-03 Perforation 4324.00 4324.50 12
2019-01-17 Perforation 6859.00 6859.50 12
2019-01-25 Perforation 6619.00 6619.50 8
2019-03-03 Perforation 4309.00 4309.50 10
2019-03-03 Perforation 4294.00 4294.50 8
2019-03-03 Perforation 4279.00 4279.50 8
2019-03-03 Multi-Stage Fracture 4279.00 4354.50 0
2019-03-04 Perforation 4264.00 4264.50 16
2019-03-04 Perforation 4249.00 4249.50 12
2019-03-04 Perforation 4234.00 4234.50 12
2019-03-04 Perforation 4219.00 4219.50 10
2019-03-04 Perforation 4204.00 4204.50 8
2019-03-04 Perforation 4189.00 4189.50 8
2019-01-25 Multi-Stage Fracture 6619.00 6694.50 0
2019-03-04 Multi-Stage Fracture 4189.00 4264.50 0
2019-03-05 Perforation 4174.00 4174.50 16
2019-03-05 Perforation 4159.00 4159.50 12
2019-03-05 Perforation 4144.00 4144.50 12
2019-03-05 Perforation 4129.00 4129.50 10
2019-03-05 Perforation 4114.00 4114.50 8
2019-03-05 Perforation 4099.00 4099.50 8
2019-03-05 Multi-Stage Fracture 4099.00 4174.50 0
2019-03-06 Perforation 3994.00 3994.50 16
2019-03-06 Perforation 3979.00 3979.50 12
2019-01-26 Perforation 6604.00 6604.50 16
2019-03-06 Perforation 3964.00 3964.50 12
2019-03-06 Perforation 3949.00 3949.50 10
2019-03-06 Perforation 3934.00 3934.50 8
2019-03-06 Perforation 3919.00 3919.50 8
2019-03-06 Perforation 4084.00 4084.50 16
2019-03-06 Perforation 4069.00 4069.50 12
2019-03-06 Perforation 4054.00 4054.50 12
2019-03-06 Perforation 4039.00 4039.50 10
2019-03-06 Perforation 4024.00 4024.50 8
2019-03-06 Perforation 4009.00 4009.50 8
2019-01-26 Perforation 6589.00 6589.50 12
2019-03-06 Multi-Stage Fracture 4009.00 4084.50 0
2019-03-07 Perforation 3904.00 3904.50 16
2019-03-07 Perforation 3889.00 3889.50 12
2019-03-07 Perforation 3874.00 3874.50 12
2019-03-07 Perforation 3859.00 3859.50 10
2019-03-07 Perforation 3844.00 3844.50 8
2019-03-07 Perforation 3829.00 3829.50 8
2019-03-08 Multi-Stage Fracture 3919.00 3994.50 0
2019-03-10 Perforation 3814.00 3814.50 16
2019-03-10 Perforation 3799.00 3799.50 12
2019-01-26 Perforation 6574.00 6574.50 12
2019-03-10 Perforation 3784.00 3784.50 12
2019-03-10 Perforation 3769.00 3769.50 10
2019-03-10 Perforation 3754.00 3754.50 8
2019-03-10 Perforation 3739.00 3739.50 8
2019-03-11 Multi-Stage Fracture 3829.00 3904.50 0
2019-03-11 Perforation 3724.00 3724.50 16
2019-03-11 Perforation 3709.00 3709.50 12
2019-03-11 Perforation 3694.00 3694.50 12
2019-03-11 Perforation 3679.00 3679.50 10
2019-03-11 Perforation 3664.00 3664.50 8
2019-01-26 Perforation 6559.00 6559.50 10
2019-03-11 Perforation 3649.00 3649.50 8
2019-03-11 Multi-Stage Fracture 3739.00 3814.50 0
2019-03-11 Perforation 3634.00 3634.50 16
2019-03-11 Multi-Stage Fracture 3649.00 3724.50 0
2019-03-11 Perforation 3619.00 3619.50 12
2019-03-11 Perforation 3604.00 3604.50 12
2019-03-11 Perforation 3589.00 3589.50 10
2019-03-11 Perforation 3574.00 3574.50 8
2019-03-11 Perforation 3559.00 3559.50 8
2019-03-12 Multi-Stage Fracture 3559.00 3634.50 0
2019-01-26 Perforation 6544.00 6544.50 8
2019-03-12 Perforation 3544.00 3544.50 16
2019-03-12 Perforation 3529.00 3529.50 12
2019-03-12 Perforation 3514.00 3514.50 12
2019-03-12 Perforation 3499.00 3499.50 10
2019-03-12 Perforation 3484.00 3484.50 8
2019-03-12 Perforation 3469.00 3469.50 8
2019-03-12 Multi-Stage Fracture 3469.00 3544.50 0
2019-01-26 Perforation 6529.00 6529.50 8
2019-01-26 Multi-Stage Fracture 6529.00 6604.50 0
2019-01-27 Perforation 6514.00 6514.50 16
2019-01-17 Perforation 6844.00 6844.50 12
2019-01-27 Perforation 6499.00 6499.50 12
2019-01-27 Perforation 6484.00 6484.50 12
2019-01-27 Perforation 6469.00 6469.50 10
2019-01-27 Perforation 6454.00 6454.50 8
2019-01-27 Perforation 6439.00 6439.50 8
2019-01-27 Multi-Stage Fracture 6439.00 6514.50 0
2019-01-28 Perforation 6424.00 6424.50 16
2019-01-28 Perforation 6409.00 6409.50 12
2019-01-28 Perforation 6394.00 6394.50 12
2019-01-28 Perforation 6379.00 6379.50 10
2019-01-17 Perforation 6829.00 6829.50 12
2019-01-28 Perforation 6364.00 6364.50 8
2019-01-28 Perforation 6349.00 6349.50 8
2019-01-29 Multi-Stage Fracture 6349.00 6424.50 0
2019-01-30 Perforation 6334.00 6334.50 16
2019-01-30 Perforation 6319.00 6319.50 12
2019-01-30 Perforation 6304.00 6304.50 12
2019-01-30 Perforation 6289.00 6289.50 10
2019-01-30 Perforation 6274.00 6274.50 8
2019-01-30 Perforation 6259.00 6259.50 8
2019-01-30 Multi-Stage Fracture 6259.00 6334.50 0
2019-01-17 Perforation 6814.00 6814.50 12
2019-01-31 Perforation 6244.00 6244.50 16
2019-01-31 Perforation 6229.00 6229.50 12
2019-01-31 Perforation 6214.00 6214.50 12
2019-01-31 Perforation 6199.00 6199.50 10
2019-01-31 Perforation 6184.00 6184.50 8
2019-01-31 Perforation 6169.00 6169.50 8
2019-01-31 Multi-Stage Fracture 6169.00 6244.50 0
2019-02-01 Perforation 6154.00 6154.50 16
2019-02-01 Perforation 6139.00 6139.50 12
2019-02-01 Perforation 6124.00 6124.50 12
2019-01-17 Perforation 6799.00 6799.50 12
2019-02-01 Perforation 6109.00 6109.50 10
2019-02-01 Perforation 6094.00 6094.50 8
2019-02-01 Perforation 6079.00 6079.50 8
2019-02-02 Multi-Stage Fracture 6079.00 6154.50 0
2019-02-03 Perforation 6064.00 6064.50 16
2019-02-03 Perforation 6049.00 6049.50 12
2019-02-03 Perforation 6034.00 6034.50 12
2019-02-03 Perforation 6019.00 6019.50 10
2019-02-03 Perforation 6004.00 6004.50 8
2019-02-03 Perforation 5989.00 5989.50 8
2019-01-22 Multi-Stage Fracture 6799.00 6878.00 0
2019-02-04 Multi-Stage Fracture 5989.00 6064.50 0
2019-02-05 Perforation 5974.00 5974.50 16
2019-02-05 Perforation 5959.00 5959.50 12
2019-02-05 Perforation 5944.00 5944.50 12
2019-02-05 Perforation 5929.00 5929.50 10
2019-02-05 Perforation 5914.00 5914.50 8
2019-02-05 Perforation 5899.00 5899.50 8
2019-02-05 Multi-Stage Fracture 5899.00 5974.50 0
2019-02-06 Perforation 5884.00 5884.50 16
2019-02-06 Perforation 5869.00 5869.50 12
2019-01-24 Perforation 6784.00 6784.50 16
2019-02-06 Perforation 5854.00 5854.50 12
2019-02-06 Perforation 5839.00 5839.50 10
2019-02-06 Perforation 5824.00 5824.50 8
2019-02-06 Perforation 5809.00 5809.50 8
2019-02-06 Multi-Stage Fracture 5809.00 5884.50 0
2019-02-07 Perforation 5794.00 5794.50 16
2019-02-07 Perforation 5779.00 5779.50 12
2019-02-07 Perforation 5764.00 5764.50 12
2019-02-07 Perforation 5749.00 5749.50 10
2019-02-07 Perforation 5734.00 5734.50 8
2019-01-24 Perforation 6769.00 6769.50 12
2019-02-07 Perforation 5719.00 5719.50 8
2019-02-07 Multi-Stage Fracture 5719.00 5794.50 0
2019-02-14 Perforation 5704.00 5704.50 16
2019-02-14 Perforation 5689.00 5689.50 12
2019-02-14 Perforation 5674.00 5674.50 12
2019-02-14 Perforation 5659.00 5659.50 10
2019-02-14 Perforation 5644.00 5644.50 8
2019-02-14 Perforation 5629.00 5629.50 8
2019-02-14 Multi-Stage Fracture 5629.00 5704.50 0
2019-02-15 Perforation 5614.00 5614.50 16

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2019-01-22 2019-03-12 3,201 105,275 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water 7732-18-5 100 89.4818 N/A
FRAC SAND. 40/70 WHITE BJ Services Crystalline Silica (Quartz) 14808-60-7 100 8.4419 N/A
FRAC SAND. 50/140 CANADIAN BJ Services Crystalline Silica (Quartz) 14808-60-7 100 1.7532 N/A
Hydrochloric Acid 28% BJ Services Acid Hydrochloric acid 7647-01-0 100 0.0886 N/A
Water 7732-18-5 100 0.0886 N/A
AQUCAR DB 20 BJ Services Bactericide/Biocide 2.2-Dibromo-3-nitrilopropionamide 10222-01-2 100 0.008 N/A
Dibromoacetonitrile 3252-43-5 100 0.008 N/A
Polyethylene Glycol 25322-68-3 100 0.008 N/A
Sodium Bromide 7647-15-6 100 0.008 N/A
Water 7732-18-5 100 0.008 N/A
GBW-41LW BJ Services Breaker Hydrogen Peroxide 7722-84-1 100 0.0319 N/A
Methanol 67-56-1 100 0.0319 N/A
Non-hazardous Not Available 100 0.0319 N/A
MatrixCare CI-01 BJ Services Corrosion Inhibitor 1.2-ethanediol 107-21-1 100 0.001 N/A
1-decanol 112-30-1 100 0.001 N/A
1-octanol 111-87-5 100 0.001 N/A
2-butoxy ethanol 111-76-2 100 0.001 N/A
2-propanol 67-63-0 100 0.001 N/A
2-propenal. 3-phenyl- 104-55-2 100 0.001 N/A
alcohols. C14-15. ethoxylated 68951-67-7 100 0.001 N/A
azabenzene derivatives. quaternized. chloride salt 15619-48-4 100 0.001 N/A
formamide. N.N-dimethyl- 68-12-2 100 0.001 N/A
phosphoric acid. triethyl ester 78-40-0 100 0.001 N/A
Water 7732-18-5 100 0.001 N/A
FP-12L BJ Services Defoamer Methylcellulose 9004-67-5 100 0 N/A
Non-hazardous Not Available 100 0 N/A
Octamethylcyclotetrasiloxane 556-67-2 100 0.0001 N/A
Polydimethylsiloxane 63148-62-9 100 0 N/A
Water 7732-18-5 100 0 N/A
D-3 BJ Services Demulsifier Ethoxylated alcohol. branched 78330-19-5 100 0.0007 N/A
Isopropanol 67-63-0 100 0.0007 N/A
Methanol 67-56-1 100 0.0007 N/A
ThinFrac HV FRHV-01 BJ Services Friction Reducer 1.2 Propanediol carbonate 108-32-7 100 0.1438 N/A
Distillates (petroleum) hydrotreated light paraffinic 64742-55-8 100 0.1438 N/A
Lecitihins. soya 8030-76-0 100 0.1438 N/A
polymer Trade Secret 100 0.1438 N/A
Water 7732-18-5 100 0.1438 N/A
ResCare IC 800 BJ Services Iron Control Trisodium nitrilotriacetate monohydrate 18662-53-8 100 0.0015 N/A
FraCare SI 14 BJ Services Scale Inhibitor Phosphinocarboxylic acid copolymer 110224-99-2 100 0.0221 N/A
Water 7732-18-5 100 0.0221 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2019-01-21 2019-03-13 Groundwater - Non-saline less than or equal to 150m deep 3119
2019-01-21 2019-03-13 Groundwater - Non-saline less than or equal to 150m deep 1028
2019-01-18 2019-03-13 Groundwater - Non-saline less than or equal to 150m deep 7170
2019-01-21 2019-03-13 Groundwater - Non-saline less than or equal to 150m deep 1881
2019-01-21 2019-03-13 Groundwater - Non-saline less than or equal to 150m deep 8735
2019-01-21 2019-03-13 Groundwater - Non-saline less than or equal to 150m deep 9361
2019-02-20 2019-03-02 Groundwater - Non-saline less than or equal to 150m deep 1931
2019-02-07 2019-03-02 Groundwater - Non-saline less than or equal to 150m deep 1487
2019-01-21 2019-03-10 Groundwater - Non-saline less than or equal to 150m deep 2369
2019-01-21 2019-03-13 Groundwater - Non-saline less than or equal to 150m deep 6107
2019-02-07 2019-03-01 Groundwater - Non-saline less than or equal to 150m deep 1261
2019-02-10 2019-03-06 Groundwater - Non-saline less than or equal to 150m deep 3438
2019-02-07 2019-03-01 Groundwater - Non-saline less than or equal to 150m deep 3276
2019-01-20 2019-03-13 Surface Water - River 25390
2019-01-20 2019-03-13 Groundwater - Non-saline less than or equal to 150m deep 1008
2019-01-20 2019-03-13 Groundwater - Non-saline less than or equal to 150m deep 14294

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2019 472 0.0 0.0 0.0
2020 2080 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-08-07 Lost Circulation 48.00 120.00
2018-08-08 Lost Circulation 55.00 120.00
2018-08-09 Lost Circulation 120.00 461.00
2018-08-10 Lost Circulation 461.00 461.00
2018-08-30 Lost Circulation 2927.00 2927.00
2019-03-13 No Incident Encountered 0.00 0.00
2019-03-30 No Incident Encountered 0.00 0.00

For data sources see[10]

References