If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0625201609020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.362513,"lon":-116.979609,"icon":""}]} |
Location: 02/09-16-062-20W5/0 | |
Location Alias: 02/09-16-62-20 W5M | |
Location Alias 2: 02/09-16-062-20 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 062 | |
Meridian: 5 | |
Range: 20 | |
Section: 16 | |
County/Municipality: Municipal District of Greenview No. 16 | |
Well Name: CHEVRON 102 HZ KAYBOBS 9-16-62-20 | |
Operator Name: Chevron Canada Limited | |
License Number: 0487754 | |
License Date: 2018-01-22 | |
License Status: Issued | |
Spud Date: 2018-08-07 | |
Final Drill Date: 2018-10-17 | |
Well Total Depth: 6954.00 m | |
Surface Hole Latitude: 54.362513 | |
Surface Hole Longitude: -116.979609 |
Date | Event |
---|---|
2018-01-22 | Obtained License |
2018-08-07 | Lost Circulation Occurred |
2018-08-08 | Lost Circulation Occurred |
2018-08-09 | Lost Circulation Occurred |
2018-08-09 | Surface Casing Operation Performed |
2018-08-10 | Lost Circulation Occurred |
2018-08-25 | Direction Drilling Operation Performed - Deviate |
2018-08-30 | Intermediate Casing Operation Performed |
2018-08-30 | Lost Circulation Occurred |
2018-10-13 | Direction Drilling Operation Performed - Horizontal |
2018-10-17 | Finished Drilling |
2018-10-17 | Well Log Performed |
2018-10-17 | Well Mode changed to Drilled and Cased |
2018-10-18 | Well Log Performed |
2018-10-20 | Production Casing Operation Performed |
2018-10-21 | Rig Released |
2019-01-13 | Perforation Treatment Performed - Jet Perforation |
2019-01-17 | Perforation Treatment Performed - Jet Perforation |
2019-01-22 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-01-24 | Perforation Treatment Performed - Jet Perforation |
2019-01-25 | Perforation Treatment Performed - Jet Perforation |
2019-01-25 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-01-26 | Perforation Treatment Performed - Jet Perforation |
2019-01-26 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-01-27 | Perforation Treatment Performed - Jet Perforation |
2019-01-27 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-01-28 | Perforation Treatment Performed - Jet Perforation |
2019-01-29 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-01-30 | Perforation Treatment Performed - Jet Perforation |
2019-01-30 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-01-31 | Perforation Treatment Performed - Jet Perforation |
2019-01-31 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-02-01 | Perforation Treatment Performed - Jet Perforation |
2019-02-02 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-02-03 | Perforation Treatment Performed - Jet Perforation |
2019-02-04 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-02-05 | Perforation Treatment Performed - Jet Perforation |
2019-02-05 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-02-06 | Perforation Treatment Performed - Jet Perforation |
2019-02-06 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-02-07 | Perforation Treatment Performed - Jet Perforation |
2019-02-07 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-02-14 | Perforation Treatment Performed - Jet Perforation |
2019-02-14 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-02-15 | Perforation Treatment Performed - Jet Perforation |
2019-02-15 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-02-16 | Perforation Treatment Performed - Jet Perforation |
2019-02-16 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-02-17 | Perforation Treatment Performed - Jet Perforation |
2019-02-17 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-02-18 | Perforation Treatment Performed - Jet Perforation |
2019-02-18 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-02-19 | Perforation Treatment Performed - Jet Perforation |
2019-02-19 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-02-21 | Perforation Treatment Performed - Jet Perforation |
2019-02-21 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-02-22 | Perforation Treatment Performed - Jet Perforation |
2019-02-22 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-02-23 | Perforation Treatment Performed - Jet Perforation |
2019-02-24 | Perforation Treatment Performed - Jet Perforation |
2019-02-24 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-02-25 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-02-26 | Perforation Treatment Performed - Jet Perforation |
2019-02-26 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-02-27 | Perforation Treatment Performed - Jet Perforation |
2019-02-27 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-02-28 | Perforation Treatment Performed - Jet Perforation |
2019-02-28 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-03-01 | Perforation Treatment Performed - Jet Perforation |
2019-03-01 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-03-03 | Perforation Treatment Performed - Jet Perforation |
2019-03-03 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-03-04 | Perforation Treatment Performed - Jet Perforation |
2019-03-04 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-03-05 | Perforation Treatment Performed - Jet Perforation |
2019-03-05 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-03-06 | Perforation Treatment Performed - Jet Perforation |
2019-03-06 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-03-07 | Perforation Treatment Performed - Jet Perforation |
2019-03-08 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-03-10 | Perforation Treatment Performed - Jet Perforation |
2019-03-11 | Perforation Treatment Performed - Jet Perforation |
2019-03-11 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-03-12 | Perforation Treatment Performed - Jet Perforation |
2019-03-12 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-05-13 | Well Began Production |
2019-05-13 | Well Fluid changed to Shale Gas Only |
2019-05-13 | Well Mode changed to Flowing |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2018-08-07 | Ensign Drilling Inc. | 144 | N/A | Set Surface |
2018-08-08 | Ensign Drilling Inc. | 144 | N/A | Resumption |
2018-08-09 | Ensign Drilling Inc. | 144 | N/A | Resumption |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2018-08-25 | 474.70 | Deviate (5 - 79 degrees) |
2018-10-13 | 3412.70 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2019-01-13 | Perforation | 6876.00 | 6878.00 | 1 |
2019-01-24 | Perforation | 6754.00 | 6754.50 | 12 |
2019-02-15 | Perforation | 5599.00 | 5599.50 | 12 |
2019-02-15 | Perforation | 5584.00 | 5584.50 | 12 |
2019-02-15 | Perforation | 5569.00 | 5569.50 | 10 |
2019-02-15 | Perforation | 5554.00 | 5554.50 | 8 |
2019-02-15 | Perforation | 5539.00 | 5539.50 | 8 |
2019-02-15 | Multi-Stage Fracture | 5539.00 | 5614.50 | 0 |
2019-02-16 | Perforation | 5524.00 | 5524.50 | 16 |
2019-02-16 | Perforation | 5509.00 | 5509.50 | 12 |
2019-02-16 | Perforation | 5494.00 | 5494.50 | 12 |
2019-02-16 | Perforation | 5479.00 | 5479.50 | 10 |
2019-01-24 | Perforation | 6739.00 | 6739.50 | 10 |
2019-02-16 | Perforation | 5464.00 | 5464.50 | 8 |
2019-02-16 | Perforation | 5449.00 | 5449.50 | 8 |
2019-02-16 | Multi-Stage Fracture | 5449.00 | 5524.50 | 0 |
2019-02-17 | Perforation | 5434.00 | 5434.50 | 16 |
2019-02-17 | Perforation | 5419.00 | 5419.50 | 12 |
2019-02-17 | Perforation | 5404.00 | 5404.50 | 12 |
2019-02-17 | Perforation | 5389.00 | 5389.50 | 10 |
2019-02-17 | Perforation | 5374.00 | 5374.50 | 8 |
2019-02-17 | Perforation | 5359.00 | 5359.50 | 8 |
2019-02-17 | Multi-Stage Fracture | 5359.00 | 5434.50 | 0 |
2019-01-24 | Perforation | 6724.00 | 6724.50 | 8 |
2019-02-17 | Perforation | 5344.00 | 5344.50 | 16 |
2019-02-17 | Perforation | 5329.00 | 5329.50 | 12 |
2019-02-17 | Perforation | 5314.00 | 5314.50 | 12 |
2019-02-17 | Perforation | 5299.00 | 5299.50 | 10 |
2019-02-17 | Perforation | 5284.00 | 5284.50 | 8 |
2019-02-17 | Perforation | 5269.00 | 5269.50 | 8 |
2019-02-18 | Perforation | 5254.00 | 5254.50 | 16 |
2019-02-18 | Perforation | 5239.00 | 5239.50 | 12 |
2019-02-18 | Perforation | 5224.00 | 5224.50 | 12 |
2019-02-18 | Perforation | 5209.00 | 5209.50 | 10 |
2019-01-24 | Perforation | 6709.00 | 6709.50 | 8 |
2019-02-18 | Perforation | 5194.00 | 5194.50 | 8 |
2019-02-18 | Perforation | 5179.00 | 5179.50 | 8 |
2019-02-18 | Multi-Stage Fracture | 5269.00 | 5344.50 | 0 |
2019-02-19 | Perforation | 5164.00 | 5164.50 | 16 |
2019-02-19 | Perforation | 5149.00 | 5149.50 | 12 |
2019-02-19 | Perforation | 5134.00 | 5134.50 | 12 |
2019-02-19 | Perforation | 5119.00 | 5119.50 | 10 |
2019-02-19 | Perforation | 5104.00 | 5104.50 | 8 |
2019-02-19 | Perforation | 5089.00 | 5089.50 | 8 |
2019-02-19 | Multi-Stage Fracture | 5179.00 | 5254.50 | 0 |
2019-01-25 | Multi-Stage Fracture | 6709.00 | 6784.50 | 0 |
2019-02-21 | Perforation | 5074.00 | 5074.50 | 16 |
2019-02-21 | Multi-Stage Fracture | 5089.00 | 5164.50 | 0 |
2019-02-21 | Perforation | 5059.00 | 5059.50 | 12 |
2019-02-21 | Perforation | 5044.00 | 5044.50 | 12 |
2019-02-21 | Perforation | 5029.00 | 5029.50 | 10 |
2019-02-21 | Perforation | 5014.00 | 5014.50 | 8 |
2019-02-21 | Perforation | 4999.00 | 4999.50 | 8 |
2019-02-21 | Multi-Stage Fracture | 4999.00 | 5074.50 | 0 |
2019-02-22 | Perforation | 4984.00 | 4984.50 | 16 |
2019-02-22 | Perforation | 4969.00 | 4969.50 | 12 |
2019-01-25 | Perforation | 6694.00 | 6694.50 | 16 |
2019-02-22 | Perforation | 4954.00 | 4954.50 | 12 |
2019-02-22 | Perforation | 4939.00 | 4939.50 | 10 |
2019-02-22 | Perforation | 4924.00 | 4924.50 | 8 |
2019-02-22 | Perforation | 4909.00 | 4909.50 | 8 |
2019-02-22 | Multi-Stage Fracture | 4909.00 | 4984.50 | 0 |
2019-02-23 | Perforation | 4894.00 | 4894.50 | 16 |
2019-02-23 | Perforation | 4879.00 | 4879.50 | 12 |
2019-02-23 | Perforation | 4864.00 | 4864.50 | 12 |
2019-02-23 | Perforation | 4849.00 | 4849.50 | 10 |
2019-02-23 | Perforation | 4834.00 | 4834.50 | 8 |
2019-01-25 | Perforation | 6679.00 | 6679.50 | 12 |
2019-02-23 | Perforation | 4819.00 | 4819.50 | 8 |
2019-02-24 | Multi-Stage Fracture | 4819.00 | 4894.50 | 0 |
2019-02-24 | Perforation | 4804.00 | 4804.50 | 16 |
2019-02-24 | Perforation | 4789.00 | 4789.50 | 12 |
2019-02-24 | Perforation | 4774.00 | 4774.50 | 12 |
2019-02-24 | Perforation | 4759.00 | 4759.50 | 10 |
2019-02-24 | Perforation | 4744.00 | 4744.50 | 8 |
2019-02-24 | Perforation | 4729.00 | 4729.50 | 8 |
2019-02-25 | Multi-Stage Fracture | 4729.00 | 4804.50 | 0 |
2019-02-26 | Perforation | 4714.00 | 4714.50 | 16 |
2019-01-25 | Perforation | 6664.00 | 6664.50 | 12 |
2019-02-26 | Perforation | 4699.00 | 4699.50 | 12 |
2019-02-26 | Perforation | 4684.00 | 4684.50 | 12 |
2019-02-26 | Perforation | 4669.00 | 4669.50 | 10 |
2019-02-26 | Perforation | 4654.00 | 4654.50 | 8 |
2019-02-26 | Perforation | 4639.00 | 4639.50 | 8 |
2019-02-26 | Multi-Stage Fracture | 4639.00 | 4714.50 | 0 |
2019-02-27 | Perforation | 4624.00 | 4624.50 | 16 |
2019-02-27 | Perforation | 4609.00 | 4609.50 | 12 |
2019-02-27 | Perforation | 4594.00 | 4594.50 | 12 |
2019-02-27 | Perforation | 4579.00 | 4579.50 | 10 |
2019-01-25 | Perforation | 6649.00 | 6649.50 | 10 |
2019-02-27 | Perforation | 4564.00 | 4564.50 | 8 |
2019-02-27 | Perforation | 4549.00 | 4549.50 | 8 |
2019-02-27 | Multi-Stage Fracture | 4549.00 | 4624.50 | 0 |
2019-02-28 | Perforation | 4534.00 | 4534.50 | 16 |
2019-02-28 | Perforation | 4519.00 | 4519.50 | 12 |
2019-02-28 | Perforation | 4504.00 | 4504.50 | 12 |
2019-02-28 | Perforation | 4489.00 | 4489.50 | 10 |
2019-02-28 | Perforation | 4474.00 | 4474.50 | 8 |
2019-02-28 | Perforation | 4459.00 | 4459.50 | 8 |
2019-02-28 | Multi-Stage Fracture | 4459.00 | 4534.50 | 0 |
2019-01-25 | Perforation | 6634.00 | 6634.50 | 8 |
2019-03-01 | Perforation | 4444.00 | 4444.50 | 16 |
2019-03-01 | Perforation | 4429.00 | 4429.50 | 12 |
2019-03-01 | Perforation | 4414.00 | 4414.50 | 12 |
2019-03-01 | Perforation | 4399.00 | 4399.50 | 10 |
2019-03-01 | Perforation | 4384.00 | 4384.50 | 8 |
2019-03-01 | Perforation | 4369.00 | 4369.50 | 8 |
2019-03-01 | Multi-Stage Fracture | 4369.00 | 4444.50 | 0 |
2019-03-03 | Perforation | 4354.00 | 4354.50 | 16 |
2019-03-03 | Perforation | 4339.00 | 4339.50 | 12 |
2019-03-03 | Perforation | 4324.00 | 4324.50 | 12 |
2019-01-17 | Perforation | 6859.00 | 6859.50 | 12 |
2019-01-25 | Perforation | 6619.00 | 6619.50 | 8 |
2019-03-03 | Perforation | 4309.00 | 4309.50 | 10 |
2019-03-03 | Perforation | 4294.00 | 4294.50 | 8 |
2019-03-03 | Perforation | 4279.00 | 4279.50 | 8 |
2019-03-03 | Multi-Stage Fracture | 4279.00 | 4354.50 | 0 |
2019-03-04 | Perforation | 4264.00 | 4264.50 | 16 |
2019-03-04 | Perforation | 4249.00 | 4249.50 | 12 |
2019-03-04 | Perforation | 4234.00 | 4234.50 | 12 |
2019-03-04 | Perforation | 4219.00 | 4219.50 | 10 |
2019-03-04 | Perforation | 4204.00 | 4204.50 | 8 |
2019-03-04 | Perforation | 4189.00 | 4189.50 | 8 |
2019-01-25 | Multi-Stage Fracture | 6619.00 | 6694.50 | 0 |
2019-03-04 | Multi-Stage Fracture | 4189.00 | 4264.50 | 0 |
2019-03-05 | Perforation | 4174.00 | 4174.50 | 16 |
2019-03-05 | Perforation | 4159.00 | 4159.50 | 12 |
2019-03-05 | Perforation | 4144.00 | 4144.50 | 12 |
2019-03-05 | Perforation | 4129.00 | 4129.50 | 10 |
2019-03-05 | Perforation | 4114.00 | 4114.50 | 8 |
2019-03-05 | Perforation | 4099.00 | 4099.50 | 8 |
2019-03-05 | Multi-Stage Fracture | 4099.00 | 4174.50 | 0 |
2019-03-06 | Perforation | 3994.00 | 3994.50 | 16 |
2019-03-06 | Perforation | 3979.00 | 3979.50 | 12 |
2019-01-26 | Perforation | 6604.00 | 6604.50 | 16 |
2019-03-06 | Perforation | 3964.00 | 3964.50 | 12 |
2019-03-06 | Perforation | 3949.00 | 3949.50 | 10 |
2019-03-06 | Perforation | 3934.00 | 3934.50 | 8 |
2019-03-06 | Perforation | 3919.00 | 3919.50 | 8 |
2019-03-06 | Perforation | 4084.00 | 4084.50 | 16 |
2019-03-06 | Perforation | 4069.00 | 4069.50 | 12 |
2019-03-06 | Perforation | 4054.00 | 4054.50 | 12 |
2019-03-06 | Perforation | 4039.00 | 4039.50 | 10 |
2019-03-06 | Perforation | 4024.00 | 4024.50 | 8 |
2019-03-06 | Perforation | 4009.00 | 4009.50 | 8 |
2019-01-26 | Perforation | 6589.00 | 6589.50 | 12 |
2019-03-06 | Multi-Stage Fracture | 4009.00 | 4084.50 | 0 |
2019-03-07 | Perforation | 3904.00 | 3904.50 | 16 |
2019-03-07 | Perforation | 3889.00 | 3889.50 | 12 |
2019-03-07 | Perforation | 3874.00 | 3874.50 | 12 |
2019-03-07 | Perforation | 3859.00 | 3859.50 | 10 |
2019-03-07 | Perforation | 3844.00 | 3844.50 | 8 |
2019-03-07 | Perforation | 3829.00 | 3829.50 | 8 |
2019-03-08 | Multi-Stage Fracture | 3919.00 | 3994.50 | 0 |
2019-03-10 | Perforation | 3814.00 | 3814.50 | 16 |
2019-03-10 | Perforation | 3799.00 | 3799.50 | 12 |
2019-01-26 | Perforation | 6574.00 | 6574.50 | 12 |
2019-03-10 | Perforation | 3784.00 | 3784.50 | 12 |
2019-03-10 | Perforation | 3769.00 | 3769.50 | 10 |
2019-03-10 | Perforation | 3754.00 | 3754.50 | 8 |
2019-03-10 | Perforation | 3739.00 | 3739.50 | 8 |
2019-03-11 | Multi-Stage Fracture | 3829.00 | 3904.50 | 0 |
2019-03-11 | Perforation | 3724.00 | 3724.50 | 16 |
2019-03-11 | Perforation | 3709.00 | 3709.50 | 12 |
2019-03-11 | Perforation | 3694.00 | 3694.50 | 12 |
2019-03-11 | Perforation | 3679.00 | 3679.50 | 10 |
2019-03-11 | Perforation | 3664.00 | 3664.50 | 8 |
2019-01-26 | Perforation | 6559.00 | 6559.50 | 10 |
2019-03-11 | Perforation | 3649.00 | 3649.50 | 8 |
2019-03-11 | Multi-Stage Fracture | 3739.00 | 3814.50 | 0 |
2019-03-11 | Perforation | 3634.00 | 3634.50 | 16 |
2019-03-11 | Multi-Stage Fracture | 3649.00 | 3724.50 | 0 |
2019-03-11 | Perforation | 3619.00 | 3619.50 | 12 |
2019-03-11 | Perforation | 3604.00 | 3604.50 | 12 |
2019-03-11 | Perforation | 3589.00 | 3589.50 | 10 |
2019-03-11 | Perforation | 3574.00 | 3574.50 | 8 |
2019-03-11 | Perforation | 3559.00 | 3559.50 | 8 |
2019-03-12 | Multi-Stage Fracture | 3559.00 | 3634.50 | 0 |
2019-01-26 | Perforation | 6544.00 | 6544.50 | 8 |
2019-03-12 | Perforation | 3544.00 | 3544.50 | 16 |
2019-03-12 | Perforation | 3529.00 | 3529.50 | 12 |
2019-03-12 | Perforation | 3514.00 | 3514.50 | 12 |
2019-03-12 | Perforation | 3499.00 | 3499.50 | 10 |
2019-03-12 | Perforation | 3484.00 | 3484.50 | 8 |
2019-03-12 | Perforation | 3469.00 | 3469.50 | 8 |
2019-03-12 | Multi-Stage Fracture | 3469.00 | 3544.50 | 0 |
2019-01-26 | Perforation | 6529.00 | 6529.50 | 8 |
2019-01-26 | Multi-Stage Fracture | 6529.00 | 6604.50 | 0 |
2019-01-27 | Perforation | 6514.00 | 6514.50 | 16 |
2019-01-17 | Perforation | 6844.00 | 6844.50 | 12 |
2019-01-27 | Perforation | 6499.00 | 6499.50 | 12 |
2019-01-27 | Perforation | 6484.00 | 6484.50 | 12 |
2019-01-27 | Perforation | 6469.00 | 6469.50 | 10 |
2019-01-27 | Perforation | 6454.00 | 6454.50 | 8 |
2019-01-27 | Perforation | 6439.00 | 6439.50 | 8 |
2019-01-27 | Multi-Stage Fracture | 6439.00 | 6514.50 | 0 |
2019-01-28 | Perforation | 6424.00 | 6424.50 | 16 |
2019-01-28 | Perforation | 6409.00 | 6409.50 | 12 |
2019-01-28 | Perforation | 6394.00 | 6394.50 | 12 |
2019-01-28 | Perforation | 6379.00 | 6379.50 | 10 |
2019-01-17 | Perforation | 6829.00 | 6829.50 | 12 |
2019-01-28 | Perforation | 6364.00 | 6364.50 | 8 |
2019-01-28 | Perforation | 6349.00 | 6349.50 | 8 |
2019-01-29 | Multi-Stage Fracture | 6349.00 | 6424.50 | 0 |
2019-01-30 | Perforation | 6334.00 | 6334.50 | 16 |
2019-01-30 | Perforation | 6319.00 | 6319.50 | 12 |
2019-01-30 | Perforation | 6304.00 | 6304.50 | 12 |
2019-01-30 | Perforation | 6289.00 | 6289.50 | 10 |
2019-01-30 | Perforation | 6274.00 | 6274.50 | 8 |
2019-01-30 | Perforation | 6259.00 | 6259.50 | 8 |
2019-01-30 | Multi-Stage Fracture | 6259.00 | 6334.50 | 0 |
2019-01-17 | Perforation | 6814.00 | 6814.50 | 12 |
2019-01-31 | Perforation | 6244.00 | 6244.50 | 16 |
2019-01-31 | Perforation | 6229.00 | 6229.50 | 12 |
2019-01-31 | Perforation | 6214.00 | 6214.50 | 12 |
2019-01-31 | Perforation | 6199.00 | 6199.50 | 10 |
2019-01-31 | Perforation | 6184.00 | 6184.50 | 8 |
2019-01-31 | Perforation | 6169.00 | 6169.50 | 8 |
2019-01-31 | Multi-Stage Fracture | 6169.00 | 6244.50 | 0 |
2019-02-01 | Perforation | 6154.00 | 6154.50 | 16 |
2019-02-01 | Perforation | 6139.00 | 6139.50 | 12 |
2019-02-01 | Perforation | 6124.00 | 6124.50 | 12 |
2019-01-17 | Perforation | 6799.00 | 6799.50 | 12 |
2019-02-01 | Perforation | 6109.00 | 6109.50 | 10 |
2019-02-01 | Perforation | 6094.00 | 6094.50 | 8 |
2019-02-01 | Perforation | 6079.00 | 6079.50 | 8 |
2019-02-02 | Multi-Stage Fracture | 6079.00 | 6154.50 | 0 |
2019-02-03 | Perforation | 6064.00 | 6064.50 | 16 |
2019-02-03 | Perforation | 6049.00 | 6049.50 | 12 |
2019-02-03 | Perforation | 6034.00 | 6034.50 | 12 |
2019-02-03 | Perforation | 6019.00 | 6019.50 | 10 |
2019-02-03 | Perforation | 6004.00 | 6004.50 | 8 |
2019-02-03 | Perforation | 5989.00 | 5989.50 | 8 |
2019-01-22 | Multi-Stage Fracture | 6799.00 | 6878.00 | 0 |
2019-02-04 | Multi-Stage Fracture | 5989.00 | 6064.50 | 0 |
2019-02-05 | Perforation | 5974.00 | 5974.50 | 16 |
2019-02-05 | Perforation | 5959.00 | 5959.50 | 12 |
2019-02-05 | Perforation | 5944.00 | 5944.50 | 12 |
2019-02-05 | Perforation | 5929.00 | 5929.50 | 10 |
2019-02-05 | Perforation | 5914.00 | 5914.50 | 8 |
2019-02-05 | Perforation | 5899.00 | 5899.50 | 8 |
2019-02-05 | Multi-Stage Fracture | 5899.00 | 5974.50 | 0 |
2019-02-06 | Perforation | 5884.00 | 5884.50 | 16 |
2019-02-06 | Perforation | 5869.00 | 5869.50 | 12 |
2019-01-24 | Perforation | 6784.00 | 6784.50 | 16 |
2019-02-06 | Perforation | 5854.00 | 5854.50 | 12 |
2019-02-06 | Perforation | 5839.00 | 5839.50 | 10 |
2019-02-06 | Perforation | 5824.00 | 5824.50 | 8 |
2019-02-06 | Perforation | 5809.00 | 5809.50 | 8 |
2019-02-06 | Multi-Stage Fracture | 5809.00 | 5884.50 | 0 |
2019-02-07 | Perforation | 5794.00 | 5794.50 | 16 |
2019-02-07 | Perforation | 5779.00 | 5779.50 | 12 |
2019-02-07 | Perforation | 5764.00 | 5764.50 | 12 |
2019-02-07 | Perforation | 5749.00 | 5749.50 | 10 |
2019-02-07 | Perforation | 5734.00 | 5734.50 | 8 |
2019-01-24 | Perforation | 6769.00 | 6769.50 | 12 |
2019-02-07 | Perforation | 5719.00 | 5719.50 | 8 |
2019-02-07 | Multi-Stage Fracture | 5719.00 | 5794.50 | 0 |
2019-02-14 | Perforation | 5704.00 | 5704.50 | 16 |
2019-02-14 | Perforation | 5689.00 | 5689.50 | 12 |
2019-02-14 | Perforation | 5674.00 | 5674.50 | 12 |
2019-02-14 | Perforation | 5659.00 | 5659.50 | 10 |
2019-02-14 | Perforation | 5644.00 | 5644.50 | 8 |
2019-02-14 | Perforation | 5629.00 | 5629.50 | 8 |
2019-02-14 | Multi-Stage Fracture | 5629.00 | 5704.50 | 0 |
2019-02-15 | Perforation | 5614.00 | 5614.50 | 16 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2019-01-22 | 2019-03-12 | 3,201 | 105,275 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | 7732-18-5 | 100 | 89.4818 | N/A | |||
FRAC SAND. 40/70 WHITE | BJ Services | Crystalline Silica (Quartz) | 14808-60-7 | 100 | 8.4419 | N/A | ||
FRAC SAND. 50/140 CANADIAN | BJ Services | Crystalline Silica (Quartz) | 14808-60-7 | 100 | 1.7532 | N/A | ||
Hydrochloric Acid 28% | BJ Services | Acid | Hydrochloric acid | 7647-01-0 | 100 | 0.0886 | N/A | |
Water | 7732-18-5 | 100 | 0.0886 | N/A | ||||
AQUCAR DB 20 | BJ Services | Bactericide/Biocide | 2.2-Dibromo-3-nitrilopropionamide | 10222-01-2 | 100 | 0.008 | N/A | |
Dibromoacetonitrile | 3252-43-5 | 100 | 0.008 | N/A | ||||
Polyethylene Glycol | 25322-68-3 | 100 | 0.008 | N/A | ||||
Sodium Bromide | 7647-15-6 | 100 | 0.008 | N/A | ||||
Water | 7732-18-5 | 100 | 0.008 | N/A | ||||
GBW-41LW | BJ Services | Breaker | Hydrogen Peroxide | 7722-84-1 | 100 | 0.0319 | N/A | |
Methanol | 67-56-1 | 100 | 0.0319 | N/A | ||||
Non-hazardous | Not Available | 100 | 0.0319 | N/A | ||||
MatrixCare CI-01 | BJ Services | Corrosion Inhibitor | 1.2-ethanediol | 107-21-1 | 100 | 0.001 | N/A | |
1-decanol | 112-30-1 | 100 | 0.001 | N/A | ||||
1-octanol | 111-87-5 | 100 | 0.001 | N/A | ||||
2-butoxy ethanol | 111-76-2 | 100 | 0.001 | N/A | ||||
2-propanol | 67-63-0 | 100 | 0.001 | N/A | ||||
2-propenal. 3-phenyl- | 104-55-2 | 100 | 0.001 | N/A | ||||
alcohols. C14-15. ethoxylated | 68951-67-7 | 100 | 0.001 | N/A | ||||
azabenzene derivatives. quaternized. chloride salt | 15619-48-4 | 100 | 0.001 | N/A | ||||
formamide. N.N-dimethyl- | 68-12-2 | 100 | 0.001 | N/A | ||||
phosphoric acid. triethyl ester | 78-40-0 | 100 | 0.001 | N/A | ||||
Water | 7732-18-5 | 100 | 0.001 | N/A | ||||
FP-12L | BJ Services | Defoamer | Methylcellulose | 9004-67-5 | 100 | 0 | N/A | |
Non-hazardous | Not Available | 100 | 0 | N/A | ||||
Octamethylcyclotetrasiloxane | 556-67-2 | 100 | 0.0001 | N/A | ||||
Polydimethylsiloxane | 63148-62-9 | 100 | 0 | N/A | ||||
Water | 7732-18-5 | 100 | 0 | N/A | ||||
D-3 | BJ Services | Demulsifier | Ethoxylated alcohol. branched | 78330-19-5 | 100 | 0.0007 | N/A | |
Isopropanol | 67-63-0 | 100 | 0.0007 | N/A | ||||
Methanol | 67-56-1 | 100 | 0.0007 | N/A | ||||
ThinFrac HV FRHV-01 | BJ Services | Friction Reducer | 1.2 Propanediol carbonate | 108-32-7 | 100 | 0.1438 | N/A | |
Distillates (petroleum) hydrotreated light paraffinic | 64742-55-8 | 100 | 0.1438 | N/A | ||||
Lecitihins. soya | 8030-76-0 | 100 | 0.1438 | N/A | ||||
polymer | Trade Secret | 100 | 0.1438 | N/A | ||||
Water | 7732-18-5 | 100 | 0.1438 | N/A | ||||
ResCare IC 800 | BJ Services | Iron Control | Trisodium nitrilotriacetate monohydrate | 18662-53-8 | 100 | 0.0015 | N/A | |
FraCare SI 14 | BJ Services | Scale Inhibitor | Phosphinocarboxylic acid copolymer | 110224-99-2 | 100 | 0.0221 | N/A | |
Water | 7732-18-5 | 100 | 0.0221 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2019-01-21 | 2019-03-13 | Groundwater - Non-saline less than or equal to 150m deep | 3119 |
2019-01-21 | 2019-03-13 | Groundwater - Non-saline less than or equal to 150m deep | 1028 |
2019-01-18 | 2019-03-13 | Groundwater - Non-saline less than or equal to 150m deep | 7170 |
2019-01-21 | 2019-03-13 | Groundwater - Non-saline less than or equal to 150m deep | 1881 |
2019-01-21 | 2019-03-13 | Groundwater - Non-saline less than or equal to 150m deep | 8735 |
2019-01-21 | 2019-03-13 | Groundwater - Non-saline less than or equal to 150m deep | 9361 |
2019-02-20 | 2019-03-02 | Groundwater - Non-saline less than or equal to 150m deep | 1931 |
2019-02-07 | 2019-03-02 | Groundwater - Non-saline less than or equal to 150m deep | 1487 |
2019-01-21 | 2019-03-10 | Groundwater - Non-saline less than or equal to 150m deep | 2369 |
2019-01-21 | 2019-03-13 | Groundwater - Non-saline less than or equal to 150m deep | 6107 |
2019-02-07 | 2019-03-01 | Groundwater - Non-saline less than or equal to 150m deep | 1261 |
2019-02-10 | 2019-03-06 | Groundwater - Non-saline less than or equal to 150m deep | 3438 |
2019-02-07 | 2019-03-01 | Groundwater - Non-saline less than or equal to 150m deep | 3276 |
2019-01-20 | 2019-03-13 | Surface Water - River | 25390 |
2019-01-20 | 2019-03-13 | Groundwater - Non-saline less than or equal to 150m deep | 1008 |
2019-01-20 | 2019-03-13 | Groundwater - Non-saline less than or equal to 150m deep | 14294 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2019 | 472 | 0.0 | 0.0 | 0.0 |
2020 | 2080 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2018-08-07 | Lost Circulation | 48.00 | 120.00 |
2018-08-08 | Lost Circulation | 55.00 | 120.00 |
2018-08-09 | Lost Circulation | 120.00 | 461.00 |
2018-08-10 | Lost Circulation | 461.00 | 461.00 |
2018-08-30 | Lost Circulation | 2927.00 | 2927.00 |
2019-03-13 | No Incident Encountered | 0.00 | 0.00 |
2019-03-30 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]