X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0625201608000

Well Details

Well ID: 0625201608000
Loading map...
Location: 00/08-16-062-20W5/0
Location Alias: 00/08-16-62-20 W5M
Location Alias 2: 00/08-16-062-20 W5/00
Country: Canada
Province: Alberta
Township: 062
Meridian: 5
Range: 20
Section: 16
County/Municipality: Municipal District of Greenview No. 16
Well Name: CHEVRON HZ KAYBOBS 8-16-62-20
Operator Name: Chevron Canada Limited
License Number: 0487755
License Date: 2018-01-22
License Status: Issued
Spud Date: 2018-08-08
Final Drill Date: 2018-10-28
Well Total Depth: 6726.00 m
Surface Hole Latitude: 54.362456
Surface Hole Longitude: -116.979666

For data sources see[1][2]

Well History

Date Event
2018-01-22 Obtained License
2018-08-08 Lost Circulation Occurred
2018-08-10 Surface Casing Operation Performed
2018-08-31 Direction Drilling Operation Performed - Deviate
2018-09-04 Intermediate Casing Operation Performed
2018-09-04 Lost Circulation Occurred
2018-09-05 Lost Circulation Occurred
2018-10-23 Direction Drilling Operation Performed - Horizontal
2018-10-28 Finished Drilling
2018-10-28 Well Log Performed
2018-10-28 Well Mode changed to Drilled and Cased
2018-10-29 Well Log Performed
2018-10-31 Production Casing Operation Performed
2018-10-31 Rig Released
2019-01-12 Perforation Treatment Performed - Jet Perforation
2019-01-18 Perforation Treatment Performed - Jet Perforation
2019-01-22 Perforation Treatment Performed - Jet Perforation
2019-01-22 Perforation Treatment Performed - Multi-Stage Fracture
2019-01-24 Perforation Treatment Performed - Multi-Stage Fracture
2019-01-25 Perforation Treatment Performed - Jet Perforation
2019-01-25 Perforation Treatment Performed - Multi-Stage Fracture
2019-01-26 Perforation Treatment Performed - Jet Perforation
2019-01-26 Perforation Treatment Performed - Multi-Stage Fracture
2019-01-27 Perforation Treatment Performed - Jet Perforation
2019-01-27 Perforation Treatment Performed - Multi-Stage Fracture
2019-01-29 Perforation Treatment Performed - Multi-Stage Fracture
2019-01-30 Perforation Treatment Performed - Jet Perforation
2019-01-30 Perforation Treatment Performed - Multi-Stage Fracture
2019-01-31 Perforation Treatment Performed - Jet Perforation
2019-01-31 Perforation Treatment Performed - Multi-Stage Fracture
2019-02-01 Perforation Treatment Performed - Jet Perforation
2019-02-02 Perforation Treatment Performed - Multi-Stage Fracture
2019-02-03 Perforation Treatment Performed - Jet Perforation
2019-02-04 Perforation Treatment Performed - Multi-Stage Fracture
2019-02-05 Perforation Treatment Performed - Jet Perforation
2019-02-05 Perforation Treatment Performed - Multi-Stage Fracture
2019-02-06 Perforation Treatment Performed - Jet Perforation
2019-02-06 Perforation Treatment Performed - Multi-Stage Fracture
2019-02-07 Perforation Treatment Performed - Jet Perforation
2019-02-08 Perforation Treatment Performed - Multi-Stage Fracture
2019-02-15 Perforation Treatment Performed - Jet Perforation
2019-02-15 Perforation Treatment Performed - Multi-Stage Fracture
2019-02-16 Perforation Treatment Performed - Jet Perforation
2019-02-16 Perforation Treatment Performed - Multi-Stage Fracture
2019-02-17 Perforation Treatment Performed - Jet Perforation
2019-02-17 Perforation Treatment Performed - Multi-Stage Fracture
2019-02-18 Perforation Treatment Performed - Jet Perforation
2019-02-18 Perforation Treatment Performed - Multi-Stage Fracture
2019-02-19 Perforation Treatment Performed - Jet Perforation
2019-02-19 Perforation Treatment Performed - Multi-Stage Fracture
2019-02-20 Perforation Treatment Performed - Jet Perforation
2019-02-20 Perforation Treatment Performed - Multi-Stage Fracture
2019-02-21 Perforation Treatment Performed - Jet Perforation
2019-02-21 Perforation Treatment Performed - Multi-Stage Fracture
2019-02-22 Perforation Treatment Performed - Jet Perforation
2019-02-23 Perforation Treatment Performed - Multi-Stage Fracture
2019-02-24 Perforation Treatment Performed - Jet Perforation
2019-02-24 Perforation Treatment Performed - Multi-Stage Fracture
2019-02-25 Perforation Treatment Performed - Jet Perforation
2019-02-25 Perforation Treatment Performed - Multi-Stage Fracture
2019-02-26 Perforation Treatment Performed - Jet Perforation
2019-02-26 Perforation Treatment Performed - Multi-Stage Fracture
2019-02-27 Perforation Treatment Performed - Jet Perforation
2019-02-27 Perforation Treatment Performed - Multi-Stage Fracture
2019-02-28 Perforation Treatment Performed - Jet Perforation
2019-02-28 Perforation Treatment Performed - Multi-Stage Fracture
2019-03-01 Perforation Treatment Performed - Jet Perforation
2019-03-02 Perforation Treatment Performed - Multi-Stage Fracture
2019-03-03 Perforation Treatment Performed - Jet Perforation
2019-03-04 Perforation Treatment Performed - Jet Perforation
2019-03-04 Perforation Treatment Performed - Multi-Stage Fracture
2019-03-05 Perforation Treatment Performed - Jet Perforation
2019-03-05 Perforation Treatment Performed - Multi-Stage Fracture
2019-03-06 Perforation Treatment Performed - Multi-Stage Fracture
2019-03-07 Perforation Treatment Performed - Jet Perforation
2019-03-07 Perforation Treatment Performed - Multi-Stage Fracture
2019-03-08 Perforation Treatment Performed - Jet Perforation
2019-03-08 Perforation Treatment Performed - Multi-Stage Fracture
2019-03-09 Perforation Treatment Performed - Jet Perforation
2019-03-09 Perforation Treatment Performed - Multi-Stage Fracture
2019-03-10 Perforation Treatment Performed - Jet Perforation
2019-03-10 Perforation Treatment Performed - Multi-Stage Fracture
2019-03-11 Perforation Treatment Performed - Jet Perforation
2019-03-11 Perforation Treatment Performed - Multi-Stage Fracture
2019-03-12 Perforation Treatment Performed - Jet Perforation
2019-03-12 Perforation Treatment Performed - Multi-Stage Fracture
2019-05-18 Well Began Production
2019-05-18 Well Fluid changed to Shale Gas Only
2019-05-18 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2018-08-08 Ensign Drilling Inc. 144 N/A Set Surface
2018-08-09 Ensign Drilling Inc. 144 N/A Resumption
2018-08-10 Ensign Drilling Inc. 144 N/A Resumption
2018-10-22 Ensign Drilling Inc. 144 N/A Drill To LD
2018-08-31 Ensign Drilling Inc. 144 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2018-08-31 1396.20 Deviate (5 - 79 degrees)
2018-10-23 3299.30 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2019-01-12 Perforation 6658.00 6660.00 1
2019-01-22 Perforation 6538.40 6538.90 12
2019-02-16 Perforation 5387.30 5387.80 12
2019-02-16 Perforation 5372.30 5372.80 12
2019-02-16 Perforation 5357.40 5357.90 10
2019-02-16 Perforation 5342.40 5342.90 8
2019-02-16 Perforation 5327.50 5328.00 8
2019-02-16 Multi-Stage Fracture 5327.50 5402.70 0
2019-02-16 Perforation 5312.50 5313.00 16
2019-02-16 Perforation 5297.60 5298.10 12
2019-02-16 Perforation 5282.60 5283.10 12
2019-02-16 Perforation 5267.70 5268.20 10
2019-01-22 Perforation 6523.50 6524.00 10
2019-02-16 Perforation 5252.70 5253.20 8
2019-02-16 Perforation 5237.80 5238.30 8
2019-02-17 Multi-Stage Fracture 5237.80 5313.00 0
2019-02-17 Perforation 5222.80 5223.30 16
2019-02-17 Perforation 5207.90 5208.40 12
2019-02-17 Perforation 5192.90 5193.40 12
2019-02-17 Perforation 5178.00 5178.50 10
2019-02-17 Perforation 5163.00 5163.50 8
2019-02-17 Perforation 5148.10 5148.60 8
2019-02-17 Multi-Stage Fracture 5148.10 5223.30 0
2019-01-22 Perforation 6508.50 6509.00 8
2019-02-18 Perforation 5133.10 5133.60 16
2019-02-18 Perforation 5118.20 5118.70 12
2019-02-18 Perforation 5103.20 5103.70 12
2019-02-18 Perforation 5088.30 5088.80 10
2019-02-18 Perforation 5073.30 5073.80 8
2019-02-18 Perforation 5058.40 5058.90 8
2019-02-18 Multi-Stage Fracture 5058.40 5133.60 0
2019-02-19 Perforation 5043.40 5043.90 16
2019-02-19 Perforation 5028.50 5029.00 12
2019-02-19 Perforation 5013.50 5014.00 12
2019-01-22 Perforation 6493.60 6494.10 8
2019-02-19 Perforation 4998.60 4999.10 10
2019-02-19 Perforation 4983.60 4984.10 8
2019-02-19 Perforation 4968.70 4969.20 8
2019-02-19 Multi-Stage Fracture 4968.70 5043.90 0
2019-02-20 Perforation 4953.70 4954.20 16
2019-02-20 Perforation 4938.80 4939.30 12
2019-02-20 Perforation 4923.80 4924.30 12
2019-02-20 Perforation 4908.90 4909.40 10
2019-02-20 Perforation 4893.90 4894.40 8
2019-02-20 Perforation 4879.00 4879.50 8
2019-01-24 Multi-Stage Fracture 6493.60 6568.80 0
2019-02-20 Multi-Stage Fracture 4879.00 4954.20 0
2019-02-21 Perforation 4864.00 4864.50 16
2019-02-21 Perforation 4849.10 4849.60 12
2019-02-21 Perforation 4834.10 4834.60 12
2019-02-21 Perforation 4819.20 4819.70 10
2019-02-21 Perforation 4804.20 4804.70 8
2019-02-21 Perforation 4789.30 4789.80 8
2019-02-21 Multi-Stage Fracture 4789.30 4864.50 0
2019-02-22 Perforation 4774.30 4774.80 16
2019-02-22 Perforation 4759.40 4759.90 12
2019-01-25 Perforation 6478.60 6479.10 16
2019-02-22 Perforation 4744.40 4744.90 12
2019-02-22 Perforation 4729.50 4730.00 10
2019-02-22 Perforation 4714.50 4715.00 8
2019-02-22 Perforation 4699.60 4700.10 8
2019-02-23 Multi-Stage Fracture 4699.60 4774.80 0
2019-02-24 Perforation 4684.60 4685.10 16
2019-02-24 Perforation 4669.70 4670.20 12
2019-02-24 Perforation 4654.70 4655.20 12
2019-02-24 Perforation 4639.80 4640.30 10
2019-02-24 Perforation 4624.80 4625.30 8
2019-01-25 Perforation 6463.70 6464.20 12
2019-02-24 Perforation 4609.90 4610.40 8
2019-02-24 Multi-Stage Fracture 4609.90 4685.10 0
2019-02-25 Perforation 4594.90 4595.40 16
2019-02-25 Perforation 4580.00 4580.50 12
2019-02-25 Perforation 4565.00 4565.50 12
2019-02-25 Perforation 4550.10 4550.60 10
2019-02-25 Perforation 4535.10 4535.60 8
2019-02-25 Perforation 4520.20 4520.70 8
2019-02-25 Multi-Stage Fracture 4520.20 4595.40 0
2019-02-26 Perforation 4505.20 4505.70 16
2019-01-25 Perforation 6448.70 6449.20 12
2019-02-26 Perforation 4490.30 4490.80 12
2019-02-26 Perforation 4475.30 4475.80 12
2019-02-26 Perforation 4460.40 4460.90 10
2019-02-26 Perforation 4445.40 4445.90 8
2019-02-26 Perforation 4430.50 4431.00 8
2019-02-26 Multi-Stage Fracture 4430.50 4505.70 0
2019-02-27 Perforation 4415.50 4416.00 16
2019-02-27 Perforation 4400.60 4401.10 12
2019-02-27 Perforation 4385.60 4386.10 12
2019-02-27 Perforation 4370.70 4371.20 10
2019-01-25 Perforation 6433.80 6434.30 10
2019-02-27 Perforation 4355.70 4356.20 8
2019-02-27 Perforation 4340.80 4341.30 8
2019-02-27 Multi-Stage Fracture 4340.80 4416.00 0
2019-02-28 Perforation 4325.80 4326.30 16
2019-02-28 Perforation 4310.90 4311.40 12
2019-02-28 Perforation 4295.90 4296.40 12
2019-02-28 Perforation 4281.00 4281.50 10
2019-02-28 Perforation 4266.00 4266.50 8
2019-02-28 Perforation 4251.10 4251.60 8
2019-02-28 Multi-Stage Fracture 4251.10 4326.30 0
2019-01-25 Perforation 6418.80 6419.30 8
2019-03-01 Perforation 4236.10 4236.60 16
2019-03-01 Perforation 4221.20 4221.70 12
2019-03-01 Perforation 4206.20 4206.70 12
2019-03-01 Perforation 4191.30 4191.80 10
2019-03-01 Perforation 4176.30 4176.80 8
2019-03-01 Perforation 4161.40 4161.90 8
2019-03-02 Multi-Stage Fracture 4161.40 4236.60 0
2019-03-03 Perforation 4146.40 4146.90 16
2019-03-03 Perforation 4131.50 4132.00 12
2019-03-03 Perforation 4116.50 4117.00 12
2019-01-18 Perforation 6643.10 6643.60 12
2019-01-25 Perforation 6403.90 6404.40 8
2019-03-03 Perforation 4101.60 4102.10 10
2019-03-03 Perforation 4086.60 4087.10 8
2019-03-03 Perforation 4071.70 4072.20 8
2019-03-04 Multi-Stage Fracture 4071.70 4146.90 0
2019-03-04 Perforation 4056.70 4057.20 16
2019-03-04 Perforation 4041.80 4042.30 12
2019-03-04 Perforation 4026.80 4027.30 12
2019-03-04 Perforation 4011.90 4012.40 10
2019-03-04 Perforation 3996.90 3997.40 8
2019-03-04 Perforation 3982.00 3982.50 8
2019-01-25 Multi-Stage Fracture 6403.90 6479.10 0
2019-03-05 Multi-Stage Fracture 3982.00 4057.20 0
2019-03-05 Perforation 3967.00 3967.50 16
2019-03-05 Perforation 3952.10 3952.60 12
2019-03-05 Perforation 3937.10 3937.60 12
2019-03-05 Perforation 3922.20 3922.70 10
2019-03-05 Perforation 3907.20 3907.70 8
2019-03-05 Perforation 3892.30 3892.80 8
2019-03-06 Multi-Stage Fracture 3892.30 3967.50 0
2019-03-07 Perforation 3877.30 3877.80 16
2019-03-07 Perforation 3862.40 3862.90 12
2019-01-26 Perforation 6388.90 6389.40 16
2019-03-07 Perforation 3847.40 3847.90 12
2019-03-07 Perforation 3832.50 3833.00 10
2019-03-07 Perforation 3817.50 3818.00 8
2019-03-07 Perforation 3802.60 3803.10 8
2019-03-07 Multi-Stage Fracture 3802.60 3877.80 0
2019-03-08 Perforation 3787.60 3788.10 16
2019-03-08 Perforation 3772.70 3773.20 12
2019-03-08 Perforation 3757.70 3758.20 12
2019-03-08 Perforation 3742.80 3743.30 10
2019-03-08 Perforation 3727.80 3728.30 8
2019-01-26 Perforation 6374.00 6374.50 12
2019-03-08 Perforation 3712.90 3713.40 8
2019-03-08 Multi-Stage Fracture 3712.90 3788.10 0
2019-03-09 Perforation 3697.90 3698.40 16
2019-03-09 Perforation 3683.00 3683.50 12
2019-03-09 Perforation 3668.00 3668.50 12
2019-03-09 Perforation 3653.10 3653.60 10
2019-03-09 Perforation 3638.10 3638.60 8
2019-03-09 Perforation 3623.20 3623.70 8
2019-03-09 Multi-Stage Fracture 3623.20 3697.90 0
2019-03-10 Perforation 3608.20 3608.70 16
2019-01-26 Perforation 6359.00 6359.50 12
2019-03-10 Perforation 3593.30 3593.80 12
2019-03-10 Perforation 3578.30 3578.80 12
2019-03-10 Perforation 3563.40 3563.90 10
2019-03-10 Perforation 3548.40 3548.90 8
2019-03-10 Perforation 3533.50 3534.00 8
2019-03-10 Multi-Stage Fracture 3533.50 3608.70 0
2019-03-11 Perforation 3518.50 3519.00 16
2019-03-11 Perforation 3503.60 3504.10 12
2019-03-11 Perforation 3488.60 3489.10 12
2019-03-11 Perforation 3473.70 3474.20 10
2019-01-26 Perforation 6344.10 6344.60 10
2019-03-11 Perforation 3458.70 3459.20 8
2019-03-11 Perforation 3443.80 3444.30 8
2019-03-11 Multi-Stage Fracture 3443.80 3519.00 0
2019-03-12 Perforation 3428.80 3429.30 16
2019-03-12 Perforation 3413.90 3414.40 12
2019-03-12 Perforation 3398.90 3399.40 12
2019-03-12 Perforation 3384.00 3384.50 10
2019-03-12 Perforation 3369.00 3369.50 8
2019-03-12 Perforation 3354.10 3354.60 8
2019-03-12 Multi-Stage Fracture 3354.10 3429.30 0
2019-01-26 Perforation 6329.10 6329.60 8
2019-03-12 Perforation 3339.10 3339.60 16
2019-03-12 Perforation 3324.20 3324.70 12
2019-03-12 Perforation 3309.20 3309.70 12
2019-03-12 Perforation 3294.30 3294.80 10
2019-03-12 Perforation 3279.30 3279.80 8
2019-03-12 Perforation 3264.40 3264.90 8
2019-03-12 Multi-Stage Fracture 3264.40 3339.60 0
2019-01-26 Perforation 6314.20 6314.70 8
2019-01-26 Multi-Stage Fracture 6314.20 6389.40 0
2019-01-27 Perforation 6299.20 6299.70 16
2019-01-18 Perforation 6628.10 6628.60 12
2019-01-27 Perforation 6284.30 6284.80 12
2019-01-27 Perforation 6269.30 6269.80 12
2019-01-27 Perforation 6254.40 6254.90 10
2019-01-27 Perforation 6239.40 6239.90 8
2019-01-27 Perforation 6224.50 6225.00 8
2019-01-27 Multi-Stage Fracture 6224.50 6299.70 0
2019-01-27 Perforation 6209.50 6210.00 16
2019-01-27 Perforation 6194.60 6195.10 12
2019-01-27 Perforation 6179.60 6180.10 12
2019-01-27 Perforation 6164.70 6165.20 10
2019-01-18 Perforation 6613.20 6613.70 12
2019-01-27 Perforation 6149.70 6150.20 8
2019-01-27 Perforation 6134.80 6135.30 8
2019-01-29 Multi-Stage Fracture 6134.80 6210.00 0
2019-01-30 Perforation 6119.80 6120.30 16
2019-01-30 Perforation 6104.90 6105.40 12
2019-01-30 Perforation 6089.90 6090.40 12
2019-01-30 Perforation 6075.00 6075.50 10
2019-01-30 Perforation 6060.00 6060.50 8
2019-01-30 Perforation 6045.10 6045.60 8
2019-01-30 Multi-Stage Fracture 6045.10 6120.30 0
2019-01-18 Perforation 6598.20 6598.70 12
2019-01-31 Perforation 6030.10 6030.60 16
2019-01-31 Perforation 6015.20 6015.70 12
2019-01-31 Perforation 6000.20 6000.70 12
2019-01-31 Perforation 5985.30 5985.80 10
2019-01-31 Perforation 5970.30 5970.80 8
2019-01-31 Perforation 5955.40 5955.90 8
2019-01-31 Multi-Stage Fracture 5955.40 6030.60 0
2019-02-01 Perforation 5940.40 5940.90 16
2019-02-01 Perforation 5925.50 5926.00 12
2019-02-01 Perforation 5910.50 5911.00 12
2019-01-18 Perforation 6583.30 6583.80 12
2019-02-01 Perforation 5895.60 5896.10 10
2019-02-01 Perforation 5880.60 5881.10 8
2019-02-01 Perforation 5865.70 5866.20 8
2019-02-02 Multi-Stage Fracture 5865.70 5940.90 0
2019-02-03 Perforation 5850.70 5851.20 16
2019-02-03 Perforation 5835.80 5836.30 12
2019-02-03 Perforation 5820.80 5821.30 12
2019-02-03 Perforation 5805.90 5806.40 10
2019-02-03 Perforation 5790.90 5791.40 8
2019-02-03 Perforation 5776.00 5776.50 8
2019-01-22 Multi-Stage Fracture 6583.30 6660.00 0
2019-02-04 Multi-Stage Fracture 5776.00 5851.20 0
2019-02-05 Perforation 5761.00 5761.50 16
2019-02-05 Perforation 5746.10 5746.60 12
2019-02-05 Perforation 5731.10 5731.60 12
2019-02-05 Perforation 5716.20 5716.70 10
2019-02-05 Perforation 5701.20 5701.70 8
2019-02-05 Perforation 5686.30 5686.80 8
2019-02-05 Multi-Stage Fracture 5686.30 5761.50 0
2019-02-06 Perforation 5671.30 5671.80 16
2019-02-06 Perforation 5656.40 5656.90 12
2019-01-22 Perforation 6568.30 6568.80 16
2019-02-06 Perforation 5641.40 5641.90 12
2019-02-06 Perforation 5626.50 5627.00 10
2019-02-06 Perforation 5611.50 5612.00 8
2019-02-06 Perforation 5596.60 5597.10 8
2019-02-06 Multi-Stage Fracture 5596.60 5671.80 0
2019-02-07 Perforation 5581.60 5582.10 16
2019-02-07 Perforation 5566.70 5567.20 12
2019-02-07 Perforation 5551.70 5552.20 12
2019-02-07 Perforation 5536.80 5537.30 10
2019-02-07 Perforation 5521.80 5522.30 8
2019-01-22 Perforation 6553.40 6553.90 12
2019-02-07 Perforation 5506.90 5507.40 8
2019-02-08 Multi-Stage Fracture 5506.90 5582.10 0
2019-02-15 Perforation 5491.90 5492.40 16
2019-02-15 Perforation 5477.00 5477.50 12
2019-02-15 Perforation 5462.00 5462.50 12
2019-02-15 Perforation 5447.10 5447.60 10
2019-02-15 Perforation 5432.10 5432.60 8
2019-02-15 Perforation 5417.20 5417.70 8
2019-02-15 Multi-Stage Fracture 5417.20 5492.40 0
2019-02-16 Perforation 5402.20 5402.70 16

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2019-01-22 2019-03-12 3,203 104,735 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water 7732-18-5 100 89.4135 N/A
FRAC SAND. 40/70 WHITE BJ Services Crystalline Silica (Quartz) 14808-60-7 100 8.4906 N/A
FRAC SAND. 50/140 CANADIAN BJ Services Crystalline Silica (Quartz) 14808-60-7 100 1.7736 N/A
Hydrochloric Acid 28% BJ Services Acid Hydrochloric acid 7647-01-0 100 0.0891 N/A
Water 7732-18-5 100 0.0891 N/A
AQUCAR DB 20 BJ Services Bactericide/Biocide 2.2-Dibromo-3-nitrilopropionamide 10222-01-2 100 0.008 N/A
Dibromoacetonitrile 3252-43-5 100 0.008 N/A
Polyethylene Glycol 25322-68-3 100 0.008 N/A
Sodium Bromide 7647-15-6 100 0.008 N/A
Water 7732-18-5 100 0.008 N/A
GBW-41LW BJ Services Breaker Hydrogen Peroxide 7722-84-1 100 0.0312 N/A
Methanol 67-56-1 100 0.0312 N/A
Non-hazardous Not Available 100 0.0312 N/A
MatrixCare CI-01 BJ Services Corrosion Inhibitor 1.2-ethanediol 107-21-1 100 0.001 N/A
1-decanol 112-30-1 100 0.001 N/A
1-octanol 111-87-5 100 0.001 N/A
2-butoxy ethanol 111-76-2 100 0.001 N/A
2-propanol 67-63-0 100 0.001 N/A
2-propenal. 3-phenyl- 104-55-2 100 0.001 N/A
alcohols. C14-15. ethoxylated 68951-67-7 100 0.001 N/A
azabenzene derivatives. quaternized. chloride salt 15619-48-4 100 0.001 N/A
formamide. N.N-dimethyl- 68-12-2 100 0.001 N/A
phosphoric acid. triethyl ester 78-40-0 100 0.001 N/A
Water 7732-18-5 100 0.001 N/A
FP-12L BJ Services Defoamer Methylcellulose 9004-67-5 100 0 N/A
Non-hazardous Not Available 100 0 N/A
Octamethylcyclotetrasiloxane 556-67-2 100 0.0001 N/A
Polydimethylsiloxane 63148-62-9 100 0 N/A
Water 7732-18-5 100 0 N/A
D-3 BJ Services Demulsifier Ethoxylated alcohol. branched 78330-19-5 100 0.0007 N/A
Isopropanol 67-63-0 100 0.0007 N/A
Methanol 67-56-1 100 0.0007 N/A
ThinFrac HV FRHV-01 BJ Services Friction Reducer 1.2 Propanediol carbonate 108-32-7 100 0.1429 N/A
Distillates (petroleum) hydrotreated light paraffinic 64742-55-8 100 0.1429 N/A
Lecitihins. soya 8030-76-0 100 0.1429 N/A
polymer Trade Secret 100 0.1429 N/A
Water 7732-18-5 100 0.1429 N/A
ResCare IC 800 BJ Services Iron Control Trisodium nitrilotriacetate monohydrate 18662-53-8 100 0.0015 N/A
FraCare SI 14 BJ Services Scale Inhibitor Phosphinocarboxylic acid copolymer 110224-99-2 100 0.0224 N/A
Water 7732-18-5 100 0.0224 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2019-01-21 2019-03-13 Groundwater - Non-saline less than or equal to 150m deep 3119
2019-01-21 2019-03-13 Groundwater - Non-saline less than or equal to 150m deep 1028
2019-01-18 2019-03-13 Groundwater - Non-saline less than or equal to 150m deep 7170
2019-01-21 2019-03-13 Groundwater - Non-saline less than or equal to 150m deep 1881
2019-01-21 2019-03-13 Groundwater - Non-saline less than or equal to 150m deep 8735
2019-01-21 2019-03-13 Groundwater - Non-saline less than or equal to 150m deep 9361
2019-02-20 2019-03-02 Groundwater - Non-saline less than or equal to 150m deep 1931
2019-02-07 2019-03-02 Groundwater - Non-saline less than or equal to 150m deep 1487
2019-01-21 2019-03-10 Groundwater - Non-saline less than or equal to 150m deep 2369
2019-01-21 2019-03-13 Groundwater - Non-saline less than or equal to 150m deep 6107
2019-02-07 2019-03-01 Groundwater - Non-saline less than or equal to 150m deep 1261
2019-02-10 2019-03-06 Groundwater - Non-saline less than or equal to 150m deep 3438
2019-02-07 2019-03-01 Groundwater - Non-saline less than or equal to 150m deep 3276
2019-01-20 2019-03-13 Surface Water - River 25390
2019-01-20 2019-03-13 Groundwater - Non-saline less than or equal to 150m deep 1008
2019-01-20 2019-03-13 Groundwater - Non-saline less than or equal to 150m deep 14294

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2019 190 0.0 0.0 0.0
2020 2089 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-08-08 Lost Circulation 48.00 120.00
2018-09-04 Lost Circulation 2898.00 2898.00
2018-09-04 Lost Circulation 2898.00 2898.00
2018-09-05 Lost Circulation 2898.00 2898.00
2019-03-13 No Incident Encountered 0.00 0.00
2019-03-31 No Incident Encountered 0.00 0.00

For data sources see[10]

References