If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0625201601020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.362342,"lon":-116.979778,"icon":""}]} |
Location: 02/01-16-062-20W5/0 | |
Location Alias: 02/01-16-62-20 W5M | |
Location Alias 2: 02/01-16-062-20 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 062 | |
Meridian: 5 | |
Range: 20 | |
Section: 16 | |
County/Municipality: Municipal District of Greenview No. 16 | |
Well Name: CHEVRON 102 HZ KAYBOBS 1-16-62-20 | |
Operator Name: Chevron Canada Limited | |
License Number: 0487756 | |
License Date: 2018-01-22 | |
License Status: Amended | |
Spud Date: 2018-08-12 | |
Final Drill Date: 2018-11-14 | |
Well Total Depth: 6186.00 m | |
Surface Hole Latitude: 54.362342 | |
Surface Hole Longitude: -116.979778 |
Date | Event |
---|---|
2018-01-22 | Obtained License |
2018-08-12 | Direction Drilling Operation Performed - Deviate |
2018-08-12 | Lost Circulation Occurred |
2018-08-13 | Lost Circulation Occurred |
2018-08-13 | Surface Casing Operation Performed |
2018-08-15 | Well Log Performed |
2018-09-15 | Intermediate Casing Operation Performed |
2018-09-15 | Lost Circulation Occurred |
2018-09-20 | Well Log Performed |
2018-11-10 | Direction Drilling Operation Performed - Horizontal |
2018-11-14 | Finished Drilling |
2018-11-14 | Well Log Performed |
2018-11-14 | Well Mode changed to Drilled and Cased |
2018-11-16 | Well Log Performed |
2018-11-17 | Production Casing Operation Performed |
2018-11-18 | Rig Released |
2019-01-12 | Perforation Treatment Performed - Jet Perforation |
2019-01-18 | Perforation Treatment Performed - Jet Perforation |
2019-01-21 | Perforation Treatment Performed - Jet Perforation |
2019-01-21 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-01-23 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-01-24 | Perforation Treatment Performed - Jet Perforation |
2019-01-25 | Perforation Treatment Performed - Jet Perforation |
2019-01-25 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-01-26 | Perforation Treatment Performed - Jet Perforation |
2019-01-26 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-01-27 | Perforation Treatment Performed - Jet Perforation |
2019-01-27 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-01-28 | Perforation Treatment Performed - Jet Perforation |
2019-01-28 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-01-30 | Perforation Treatment Performed - Jet Perforation |
2019-01-30 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-01-31 | Perforation Treatment Performed - Jet Perforation |
2019-01-31 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-02-01 | Perforation Treatment Performed - Jet Perforation |
2019-02-01 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-02-09 | Perforation Treatment Performed - Jet Perforation |
2019-02-09 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-02-10 | Perforation Treatment Performed - Jet Perforation |
2019-02-10 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-02-11 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-02-12 | Perforation Treatment Performed - Jet Perforation |
2019-02-12 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-02-13 | Perforation Treatment Performed - Jet Perforation |
2019-02-13 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-02-14 | Perforation Treatment Performed - Jet Perforation |
2019-02-14 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-02-21 | Perforation Treatment Performed - Jet Perforation |
2019-02-21 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-02-22 | Perforation Treatment Performed - Jet Perforation |
2019-02-23 | Perforation Treatment Performed - Jet Perforation |
2019-02-23 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-02-24 | Perforation Treatment Performed - Jet Perforation |
2019-02-24 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-02-25 | Perforation Treatment Performed - Jet Perforation |
2019-02-25 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-02-27 | Perforation Treatment Performed - Jet Perforation |
2019-02-27 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-02-28 | Perforation Treatment Performed - Jet Perforation |
2019-02-28 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-03-01 | Perforation Treatment Performed - Jet Perforation |
2019-03-01 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-03-02 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-03-03 | Perforation Treatment Performed - Jet Perforation |
2019-03-04 | Perforation Treatment Performed - Jet Perforation |
2019-03-04 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-03-09 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-03-10 | Perforation Treatment Performed - Jet Perforation |
2019-03-11 | Perforation Treatment Performed - Jet Perforation |
2019-03-11 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-03-12 | Perforation Treatment Performed - Jet Perforation |
2019-03-12 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-03-13 | Perforation Treatment Performed - Jet Perforation |
2019-03-13 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-05-31 | Well Began Production |
2019-05-31 | Well Fluid changed to Shale Gas Only |
2019-05-31 | Well Mode changed to Flowing |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2018-11-10 | Ensign Drilling Inc. | 144 | N/A | Drill To LD |
2018-09-10 | Ensign Drilling Inc. | 144 | N/A | Resumption |
2018-08-12 | Ensign Drilling Inc. | 144 | N/A | Set Surface |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2018-08-12 | 249.90 | Deviate (5 - 79 degrees) |
2018-11-10 | 3400.00 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2019-01-12 | Perforation | 6117.00 | 6119.00 | 1 |
2019-01-21 | Perforation | 5994.40 | 5994.90 | 12 |
2019-02-13 | Perforation | 4824.00 | 4824.50 | 12 |
2019-02-13 | Perforation | 4808.80 | 4809.30 | 12 |
2019-02-13 | Perforation | 4793.60 | 4794.10 | 10 |
2019-02-13 | Perforation | 4778.40 | 4778.90 | 8 |
2019-02-13 | Perforation | 4763.20 | 4763.70 | 8 |
2019-02-14 | Multi-Stage Fracture | 4763.20 | 4839.90 | 0 |
2019-02-14 | Perforation | 4748.20 | 4748.70 | 16 |
2019-02-14 | Perforation | 4732.80 | 4733.30 | 12 |
2019-02-14 | Perforation | 4717.60 | 4718.10 | 12 |
2019-02-14 | Perforation | 4702.40 | 4702.90 | 10 |
2019-01-21 | Perforation | 5979.20 | 5979.70 | 10 |
2019-02-14 | Perforation | 4687.20 | 4687.70 | 8 |
2019-02-14 | Perforation | 4672.00 | 4672.50 | 8 |
2019-02-21 | Multi-Stage Fracture | 4672.00 | 4748.70 | 0 |
2019-02-21 | Perforation | 4657.00 | 4657.50 | 16 |
2019-02-21 | Perforation | 4641.60 | 4642.10 | 12 |
2019-02-21 | Perforation | 4626.40 | 4626.90 | 12 |
2019-02-21 | Perforation | 4611.20 | 4611.70 | 10 |
2019-02-21 | Perforation | 4596.00 | 4596.50 | 8 |
2019-02-21 | Perforation | 4580.80 | 4581.30 | 8 |
2019-02-21 | Multi-Stage Fracture | 4580.80 | 4657.50 | 0 |
2019-01-21 | Perforation | 5964.00 | 5964.50 | 8 |
2019-02-22 | Perforation | 4565.80 | 4566.30 | 16 |
2019-02-22 | Perforation | 4550.40 | 4550.90 | 12 |
2019-02-22 | Perforation | 4535.20 | 4535.70 | 12 |
2019-02-22 | Perforation | 4520.00 | 4520.50 | 10 |
2019-02-22 | Perforation | 4504.80 | 4505.30 | 8 |
2019-02-22 | Perforation | 4489.00 | 4489.50 | 8 |
2019-02-23 | Multi-Stage Fracture | 4489.00 | 4566.30 | 0 |
2019-02-23 | Perforation | 4474.60 | 4475.10 | 16 |
2019-02-23 | Perforation | 4459.20 | 4459.70 | 12 |
2019-02-23 | Perforation | 4444.00 | 4444.50 | 12 |
2019-01-21 | Perforation | 5948.80 | 5949.30 | 8 |
2019-02-23 | Perforation | 4428.80 | 4429.30 | 10 |
2019-02-23 | Perforation | 4413.60 | 4414.10 | 8 |
2019-02-23 | Perforation | 4398.40 | 4398.90 | 8 |
2019-02-24 | Multi-Stage Fracture | 4398.40 | 4475.10 | 0 |
2019-02-24 | Perforation | 4383.40 | 4383.90 | 16 |
2019-02-24 | Perforation | 4368.00 | 4368.50 | 12 |
2019-02-24 | Perforation | 4352.80 | 4353.30 | 12 |
2019-02-24 | Perforation | 4337.60 | 4338.10 | 10 |
2019-02-24 | Perforation | 4322.40 | 4322.90 | 8 |
2019-02-24 | Perforation | 4307.20 | 4307.70 | 8 |
2019-01-23 | Multi-Stage Fracture | 5948.80 | 6025.50 | 0 |
2019-02-25 | Multi-Stage Fracture | 4307.20 | 4383.90 | 0 |
2019-02-25 | Perforation | 4292.20 | 4292.70 | 16 |
2019-02-25 | Perforation | 4276.80 | 4277.30 | 12 |
2019-02-25 | Perforation | 4261.60 | 4262.10 | 12 |
2019-02-25 | Perforation | 4246.40 | 4246.90 | 10 |
2019-02-25 | Perforation | 4231.20 | 4231.70 | 8 |
2019-02-25 | Perforation | 4216.00 | 4216.50 | 8 |
2019-02-27 | Multi-Stage Fracture | 4216.00 | 4292.70 | 0 |
2019-02-27 | Perforation | 4201.00 | 4201.50 | 16 |
2019-02-27 | Perforation | 4185.60 | 4186.10 | 12 |
2019-01-24 | Perforation | 5933.80 | 5934.30 | 16 |
2019-02-27 | Perforation | 4170.40 | 4170.90 | 12 |
2019-02-27 | Perforation | 4155.20 | 4155.70 | 10 |
2019-02-27 | Perforation | 4140.00 | 4140.50 | 8 |
2019-02-27 | Perforation | 4124.80 | 4125.30 | 8 |
2019-02-28 | Multi-Stage Fracture | 4124.80 | 4201.50 | 0 |
2019-02-28 | Perforation | 4109.80 | 4110.30 | 16 |
2019-02-28 | Perforation | 4094.40 | 4094.90 | 12 |
2019-02-28 | Perforation | 4079.20 | 4079.70 | 12 |
2019-02-28 | Perforation | 4064.00 | 4064.50 | 10 |
2019-02-28 | Perforation | 4048.80 | 4049.30 | 8 |
2019-01-24 | Perforation | 5918.40 | 5918.90 | 12 |
2019-02-28 | Perforation | 4033.60 | 4034.10 | 8 |
2019-03-01 | Multi-Stage Fracture | 4033.60 | 4110.30 | 0 |
2019-03-01 | Perforation | 4018.60 | 4019.10 | 8 |
2019-03-01 | Perforation | 4003.20 | 4003.70 | 8 |
2019-03-01 | Perforation | 3988.00 | 3988.50 | 10 |
2019-03-01 | Perforation | 3972.80 | 3973.30 | 12 |
2019-03-01 | Perforation | 3957.60 | 3958.10 | 12 |
2019-03-01 | Perforation | 3942.40 | 3942.90 | 16 |
2019-03-02 | Multi-Stage Fracture | 3942.40 | 4019.10 | 0 |
2019-03-03 | Perforation | 3927.40 | 3927.90 | 16 |
2019-01-24 | Perforation | 5903.20 | 5903.70 | 12 |
2019-03-03 | Perforation | 3912.00 | 3912.50 | 12 |
2019-03-03 | Perforation | 3896.80 | 3897.30 | 12 |
2019-03-03 | Perforation | 3881.60 | 3882.10 | 10 |
2019-03-03 | Perforation | 3866.40 | 3866.90 | 8 |
2019-03-03 | Perforation | 3851.20 | 3851.70 | 8 |
2019-03-04 | Multi-Stage Fracture | 3851.20 | 3927.90 | 0 |
2019-03-04 | Perforation | 3836.20 | 3836.70 | 16 |
2019-03-04 | Perforation | 3820.80 | 3821.30 | 12 |
2019-03-04 | Perforation | 3805.60 | 3806.10 | 12 |
2019-03-04 | Perforation | 3790.40 | 3790.90 | 10 |
2019-01-24 | Perforation | 5888.00 | 5888.50 | 10 |
2019-03-04 | Perforation | 3775.20 | 3775.70 | 8 |
2019-03-04 | Perforation | 3760.00 | 3760.50 | 8 |
2019-03-09 | Multi-Stage Fracture | 3760.00 | 3843.60 | 0 |
2019-03-10 | Perforation | 3745.00 | 3745.50 | 16 |
2019-03-10 | Perforation | 3729.60 | 3730.10 | 12 |
2019-03-10 | Perforation | 3714.40 | 3714.90 | 12 |
2019-03-10 | Perforation | 3699.20 | 3699.70 | 10 |
2019-03-10 | Perforation | 3684.00 | 3684.50 | 8 |
2019-03-10 | Perforation | 3668.80 | 3669.30 | 8 |
2019-03-11 | Multi-Stage Fracture | 3668.80 | 3745.50 | 0 |
2019-01-24 | Perforation | 5872.80 | 5873.30 | 10 |
2019-03-11 | Perforation | 3653.80 | 3654.30 | 16 |
2019-03-11 | Perforation | 3638.40 | 3638.90 | 12 |
2019-03-11 | Perforation | 3623.20 | 3623.70 | 12 |
2019-03-11 | Perforation | 3608.00 | 3608.50 | 10 |
2019-03-11 | Perforation | 3592.80 | 3593.30 | 8 |
2019-03-11 | Perforation | 3577.60 | 3578.10 | 8 |
2019-03-11 | Multi-Stage Fracture | 3577.60 | 3654.30 | 0 |
2019-03-12 | Perforation | 3562.60 | 3563.10 | 16 |
2019-03-12 | Perforation | 3547.20 | 3547.70 | 12 |
2019-03-12 | Perforation | 3532.00 | 3532.50 | 12 |
2019-01-18 | Perforation | 6101.00 | 6101.50 | 12 |
2019-01-24 | Perforation | 5857.60 | 5858.10 | 8 |
2019-03-12 | Perforation | 3516.80 | 3517.30 | 10 |
2019-03-12 | Perforation | 3501.60 | 3502.10 | 8 |
2019-03-12 | Perforation | 3486.40 | 3486.90 | 8 |
2019-03-12 | Multi-Stage Fracture | 3486.40 | 3563.10 | 0 |
2019-03-13 | Perforation | 3471.40 | 3471.90 | 16 |
2019-03-13 | Perforation | 3456.00 | 3456.50 | 12 |
2019-03-13 | Perforation | 3440.80 | 3441.30 | 12 |
2019-03-13 | Perforation | 3425.60 | 3426.10 | 10 |
2019-03-13 | Perforation | 3410.40 | 3410.90 | 8 |
2019-03-13 | Perforation | 3395.20 | 3395.70 | 8 |
2019-01-25 | Multi-Stage Fracture | 5857.60 | 5934.30 | 0 |
2019-03-13 | Multi-Stage Fracture | 3395.20 | 3471.90 | 0 |
2019-01-25 | Perforation | 5842.60 | 5843.10 | 16 |
2019-01-25 | Perforation | 5827.20 | 5827.70 | 12 |
2019-01-25 | Perforation | 5812.00 | 5812.50 | 12 |
2019-01-25 | Perforation | 5796.80 | 5797.30 | 10 |
2019-01-25 | Perforation | 5781.60 | 5782.10 | 8 |
2019-01-25 | Perforation | 5766.40 | 5766.90 | 8 |
2019-01-26 | Multi-Stage Fracture | 5766.40 | 5843.10 | 0 |
2019-01-26 | Perforation | 5751.40 | 5751.90 | 16 |
2019-01-18 | Perforation | 6086.00 | 6086.50 | 12 |
2019-01-26 | Perforation | 5736.00 | 5736.50 | 12 |
2019-01-26 | Perforation | 5720.80 | 5721.30 | 12 |
2019-01-26 | Perforation | 5705.60 | 5706.10 | 10 |
2019-01-26 | Perforation | 5690.40 | 5690.90 | 8 |
2019-01-26 | Perforation | 5675.20 | 5675.70 | 8 |
2019-01-27 | Multi-Stage Fracture | 5675.20 | 5751.90 | 0 |
2019-01-27 | Perforation | 5660.20 | 5660.70 | 16 |
2019-01-27 | Perforation | 5644.80 | 5645.30 | 12 |
2019-01-27 | Perforation | 5629.60 | 5630.10 | 12 |
2019-01-27 | Perforation | 5614.40 | 5614.90 | 10 |
2019-01-18 | Perforation | 6070.00 | 6070.50 | 12 |
2019-01-27 | Perforation | 5599.20 | 5599.70 | 8 |
2019-01-27 | Perforation | 5584.00 | 5584.50 | 8 |
2019-01-28 | Multi-Stage Fracture | 5584.00 | 5660.70 | 0 |
2019-01-28 | Perforation | 5569.00 | 5569.50 | 16 |
2019-01-28 | Perforation | 5553.60 | 5554.10 | 12 |
2019-01-28 | Perforation | 5538.40 | 5538.90 | 12 |
2019-01-28 | Perforation | 5523.20 | 5523.70 | 10 |
2019-01-28 | Perforation | 5508.00 | 5508.50 | 8 |
2019-01-28 | Perforation | 5492.80 | 5493.30 | 8 |
2019-01-30 | Multi-Stage Fracture | 5492.80 | 5569.50 | 0 |
2019-01-18 | Perforation | 6055.00 | 6055.50 | 12 |
2019-01-30 | Perforation | 5477.80 | 5478.30 | 16 |
2019-01-30 | Perforation | 5462.40 | 5462.90 | 12 |
2019-01-30 | Perforation | 5447.20 | 5447.70 | 12 |
2019-01-30 | Perforation | 5432.00 | 5432.50 | 10 |
2019-01-30 | Perforation | 5416.80 | 5417.30 | 8 |
2019-01-30 | Perforation | 5401.60 | 5402.10 | 8 |
2019-01-31 | Multi-Stage Fracture | 5401.60 | 5478.30 | 0 |
2019-01-31 | Perforation | 5386.60 | 5387.10 | 16 |
2019-01-31 | Perforation | 5371.20 | 5371.70 | 12 |
2019-01-31 | Perforation | 5356.00 | 5356.50 | 12 |
2019-01-18 | Perforation | 6040.00 | 6040.50 | 12 |
2019-01-31 | Perforation | 5340.80 | 5341.30 | 10 |
2019-01-31 | Perforation | 5325.60 | 5326.10 | 8 |
2019-01-31 | Perforation | 5310.40 | 5310.90 | 8 |
2019-02-01 | Perforation | 5295.40 | 5295.90 | 16 |
2019-02-01 | Perforation | 5280.00 | 5280.50 | 12 |
2019-02-01 | Perforation | 5264.80 | 5265.30 | 12 |
2019-02-01 | Perforation | 5249.60 | 5250.10 | 10 |
2019-02-01 | Perforation | 5234.40 | 5234.90 | 8 |
2019-02-01 | Perforation | 5219.20 | 5219.70 | 8 |
2019-02-01 | Multi-Stage Fracture | 5310.40 | 5387.10 | 0 |
2019-01-21 | Multi-Stage Fracture | 6040.00 | 6119.00 | 0 |
2019-02-09 | Perforation | 5204.20 | 5204.70 | 16 |
2019-02-09 | Perforation | 5188.80 | 5189.30 | 12 |
2019-02-09 | Perforation | 5173.60 | 5174.10 | 12 |
2019-02-09 | Perforation | 5158.40 | 5158.90 | 10 |
2019-02-09 | Perforation | 5143.20 | 5143.70 | 8 |
2019-02-09 | Perforation | 5128.00 | 5128.50 | 8 |
2019-02-09 | Multi-Stage Fracture | 5219.20 | 5295.90 | 0 |
2019-02-10 | Perforation | 5113.00 | 5113.50 | 16 |
2019-02-10 | Multi-Stage Fracture | 5128.00 | 5211.60 | 0 |
2019-02-10 | Perforation | 5097.60 | 5098.10 | 12 |
2019-01-21 | Perforation | 6025.00 | 6025.50 | 16 |
2019-02-10 | Perforation | 5082.40 | 5082.90 | 12 |
2019-02-10 | Perforation | 5067.20 | 5067.70 | 10 |
2019-02-10 | Perforation | 5052.00 | 5052.50 | 8 |
2019-02-10 | Perforation | 5036.80 | 5037.30 | 8 |
2019-02-11 | Multi-Stage Fracture | 5036.80 | 5113.50 | 0 |
2019-02-12 | Perforation | 5021.80 | 5022.30 | 16 |
2019-02-12 | Perforation | 5006.40 | 5006.90 | 12 |
2019-02-12 | Perforation | 4991.20 | 4991.70 | 12 |
2019-02-12 | Perforation | 4975.50 | 4976.00 | 10 |
2019-02-12 | Perforation | 4960.80 | 4961.30 | 8 |
2019-01-21 | Perforation | 6009.60 | 6010.10 | 12 |
2019-02-12 | Perforation | 4945.60 | 4946.10 | 8 |
2019-02-12 | Multi-Stage Fracture | 4945.60 | 5022.30 | 0 |
2019-02-12 | Perforation | 4930.60 | 4931.10 | 16 |
2019-02-12 | Perforation | 4915.20 | 4915.70 | 12 |
2019-02-12 | Perforation | 4900.00 | 4900.50 | 12 |
2019-02-12 | Perforation | 4884.40 | 4884.90 | 10 |
2019-02-12 | Perforation | 4869.60 | 4870.10 | 8 |
2019-02-12 | Perforation | 4854.40 | 4854.90 | 8 |
2019-02-13 | Multi-Stage Fracture | 4854.40 | 4931.10 | 0 |
2019-02-13 | Perforation | 4839.40 | 4839.90 | 16 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2019-01-21 | 2019-03-13 | 3,193 | 82,803 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | 7732-18-5 | 100 | 89.4353 | N/A | |||
FRAC SAND. 40/70 WHITE | BJ Services | Crystalline Silica (Quartz) | 14808-60-7 | 100 | 8.489 | N/A | ||
FRAC SAND. 50/140 CANADIAN | BJ Services | Crystalline Silica (Quartz) | 14808-60-7 | 100 | 1.749 | N/A | ||
Hydrochloric Acid 28% | BJ Services | Acid | Hydrochloric acid | 7647-01-0 | 100 | 0.0937 | N/A | |
Water | 7732-18-5 | 100 | 0.0937 | N/A | ||||
AQUCAR DB 20 | BJ Services | Bactericide/Biocide | 2.2-Dibromo-3-nitrilopropionamide | 10222-01-2 | 100 | 0.0078 | N/A | |
Dibromoacetonitrile | 3252-43-5 | 100 | 0.0078 | N/A | ||||
Polyethylene Glycol | 25322-68-3 | 100 | 0.0078 | N/A | ||||
Sodium Bromide | 7647-15-6 | 100 | 0.0078 | N/A | ||||
Water | 7732-18-5 | 100 | 0.0078 | N/A | ||||
GBW-41LW | BJ Services | Breaker | Hydrogen Peroxide | 7722-84-1 | 100 | 0.0315 | N/A | |
Methanol | 67-56-1 | 100 | 0.0315 | N/A | ||||
Non-hazardous | Not Available | 100 | 0.0315 | N/A | ||||
MatrixCare CI-01 | BJ Services | Corrosion Inhibitor | 1.2-ethanediol | 107-21-1 | 100 | 0.001 | N/A | |
1-decanol | 112-30-1 | 100 | 0.001 | N/A | ||||
1-octanol | 111-87-5 | 100 | 0.001 | N/A | ||||
2-butoxy ethanol | 111-76-2 | 100 | 0.001 | N/A | ||||
2-propanol | 67-63-0 | 100 | 0.001 | N/A | ||||
2-propenal. 3-phenyl- | 104-55-2 | 100 | 0.001 | N/A | ||||
alcohols. C14-15. ethoxylated | 68951-67-7 | 100 | 0.001 | N/A | ||||
azabenzene derivatives. quaternized. chloride salt | 15619-48-4 | 100 | 0.001 | N/A | ||||
formamide. N.N-dimethyl- | 68-12-2 | 100 | 0.001 | N/A | ||||
phosphoric acid. triethyl ester | 78-40-0 | 100 | 0.001 | N/A | ||||
Water | 7732-18-5 | 100 | 0.001 | N/A | ||||
FP-12L | BJ Services | Defoamer | Methylcellulose | 9004-67-5 | 100 | 0 | N/A | |
Non-hazardous | Not Available | 100 | 0 | N/A | ||||
Octamethylcyclotetrasiloxane | 556-67-2 | 100 | 0.0001 | N/A | ||||
Polydimethylsiloxane | 63148-62-9 | 100 | 0 | N/A | ||||
Water | 7732-18-5 | 100 | 0 | N/A | ||||
D-3 | BJ Services | Demulsifier | Ethoxylated alcohol. branched | 78330-19-5 | 100 | 0.0008 | N/A | |
Isopropanol | 67-63-0 | 100 | 0.0008 | N/A | ||||
Methanol | 67-56-1 | 100 | 0.0008 | N/A | ||||
ThinFrac HV FRHV-01 | BJ Services | Friction Reducer | 1.2 Propanediol carbonate | 108-32-7 | 100 | 0.1428 | N/A | |
Distillates (petroleum) hydrotreated light paraffinic | 64742-55-8 | 100 | 0.1428 | N/A | ||||
Lecitihins. soya | 8030-76-0 | 100 | 0.1428 | N/A | ||||
polymer | Trade Secret | 100 | 0.1428 | N/A | ||||
Water | 7732-18-5 | 100 | 0.1428 | N/A | ||||
ResCare IC 800 | BJ Services | Iron Control | Trisodium nitrilotriacetate monohydrate | 18662-53-8 | 100 | 0.0016 | N/A | |
FraCare SI 14 | BJ Services | Scale Inhibitor | Phosphinocarboxylic acid copolymer | 110224-99-2 | 100 | 0.0221 | N/A | |
Water | 7732-18-5 | 100 | 0.0221 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2019-01-21 | 2019-03-13 | Groundwater - Non-saline less than or equal to 150m deep | 3119 |
2019-01-21 | 2019-03-13 | Groundwater - Non-saline less than or equal to 150m deep | 1028 |
2019-01-18 | 2019-03-13 | Groundwater - Non-saline less than or equal to 150m deep | 7170 |
2019-01-21 | 2019-03-13 | Groundwater - Non-saline less than or equal to 150m deep | 1881 |
2019-01-21 | 2019-03-13 | Groundwater - Non-saline less than or equal to 150m deep | 8735 |
2019-01-21 | 2019-03-13 | Groundwater - Non-saline less than or equal to 150m deep | 9361 |
2019-02-20 | 2019-03-02 | Groundwater - Non-saline less than or equal to 150m deep | 1931 |
2019-02-07 | 2019-03-02 | Groundwater - Non-saline less than or equal to 150m deep | 1487 |
2019-01-21 | 2019-03-10 | Groundwater - Non-saline less than or equal to 150m deep | 2369 |
2019-01-21 | 2019-03-13 | Groundwater - Non-saline less than or equal to 150m deep | 6107 |
2019-02-07 | 2019-03-01 | Groundwater - Non-saline less than or equal to 150m deep | 1261 |
2019-02-10 | 2019-03-06 | Groundwater - Non-saline less than or equal to 150m deep | 3438 |
2019-02-07 | 2019-03-01 | Groundwater - Non-saline less than or equal to 150m deep | 3276 |
2019-01-20 | 2019-03-13 | Surface Water - River | 25390 |
2019-01-20 | 2019-03-13 | Groundwater - Non-saline less than or equal to 150m deep | 1008 |
2019-01-20 | 2019-03-13 | Groundwater - Non-saline less than or equal to 150m deep | 4869 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2019 | 1584 | 0.0 | 0.0 | 0.0 |
2020 | 2075 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2018-08-12 | Lost Circulation | 60.00 | 120.00 |
2018-08-12 | Lost Circulation | 360.00 | 454.00 |
2018-08-13 | Lost Circulation | 454.00 | 454.00 |
2018-09-15 | Lost Circulation | 2967.00 | 2967.00 |
2019-03-31 | No Incident Encountered | 0.00 | 0.00 |
2019-04-01 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]