X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0625201102030

Well Details

Well ID: 0625201102030
Loading map...
Location: 03/02-11-062-20W5/0
Location Alias: 03/02-11-62-20 W5M
Location Alias 2: 03/02-11-062-20 W5/00
Country: Canada
Province: Alberta
Township: 062
Meridian: 5
Range: 20
Section: 11
County/Municipality: Municipal District of Greenview No. 16
Well Name: MURPHY 11-14C 103 KAYBOBS 2-11-62-20
Operator Name: Murphy Oil Company Ltd.
License Number: 0486013
License Date: 2017-10-25
License Status: Issued
Spud Date: 2017-12-09
Final Drill Date: 2018-02-07
Well Total Depth: 5748.00 m
Surface Hole Latitude: 54.364560
Surface Hole Longitude: -116.889538

For data sources see[1][2]

Well History

Date Event
2017-10-25 Obtained License
2017-12-10 Surface Casing Operation Performed
2017-12-28 Direction Drilling Operation Performed - Deviate
2017-12-30 Intermediate Casing Operation Performed
2018-02-04 Direction Drilling Operation Performed - Horizontal
2018-02-07 Finished Drilling
2018-02-07 Well Mode changed to Drilled and Cased
2018-02-08 Well Log Performed
2018-02-09 Production Casing Operation Performed
2018-02-10 Rig Released
2018-04-23 Perforation Treatment Performed - Jet Perforation
2018-04-23 Perforation Treatment Performed - Multi-Stage Fracture
2018-04-28 Perforation Treatment Performed - Jet Perforation
2018-04-28 Perforation Treatment Performed - Multi-Stage Fracture
2018-04-29 Perforation Treatment Performed - Jet Perforation
2018-04-29 Perforation Treatment Performed - Multi-Stage Fracture
2018-04-30 Perforation Treatment Performed - Jet Perforation
2018-04-30 Perforation Treatment Performed - Multi-Stage Fracture
2018-05-01 Perforation Treatment Performed - Jet Perforation
2018-05-01 Perforation Treatment Performed - Multi-Stage Fracture
2018-05-02 Perforation Treatment Performed - Jet Perforation
2018-05-02 Perforation Treatment Performed - Multi-Stage Fracture
2018-05-03 Perforation Treatment Performed - Jet Perforation
2018-05-03 Perforation Treatment Performed - Multi-Stage Fracture
2018-05-04 Perforation Treatment Performed - Jet Perforation
2018-05-04 Perforation Treatment Performed - Multi-Stage Fracture
2018-05-13 Perforation Treatment Performed - Jet Perforation
2018-05-13 Perforation Treatment Performed - Multi-Stage Fracture
2018-05-14 Perforation Treatment Performed - Jet Perforation
2018-05-14 Perforation Treatment Performed - Multi-Stage Fracture
2018-05-15 Perforation Treatment Performed - Jet Perforation
2018-05-15 Perforation Treatment Performed - Multi-Stage Fracture
2018-05-16 Perforation Treatment Performed - Jet Perforation
2018-05-16 Perforation Treatment Performed - Multi-Stage Fracture
2018-05-17 Perforation Treatment Performed - Jet Perforation
2018-05-17 Perforation Treatment Performed - Multi-Stage Fracture
2018-05-18 Perforation Treatment Performed - Jet Perforation
2018-05-18 Perforation Treatment Performed - Multi-Stage Fracture
2018-05-19 Perforation Treatment Performed - Jet Perforation
2018-05-19 Perforation Treatment Performed - Multi-Stage Fracture
2018-08-31 Well Began Production
2018-08-31 Well Fluid changed to Gas
2018-08-31 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2018-02-01 Precision Drilling Corporation 547 N/A Drill To LD
2017-12-09 Precision Drilling Corporation 547 N/A Set Surface
2017-12-27 Precision Drilling Corporation 547 N/A Resumption

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2017-12-28 1085.60 Deviate (5 - 79 degrees)
2018-02-04 3321.90 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2018-04-23 Perforation 5652.00 5652.50 5
2018-04-28 Perforation 5628.00 5628.50 5
2018-05-03 Perforation 4728.00 4728.50 5
2018-05-03 Perforation 4740.00 4740.50 5
2018-05-03 Multi-Stage Fracture 4692.00 4740.50 0
2018-05-03 Perforation 4632.00 4632.50 5
2018-05-03 Perforation 4644.00 4644.50 5
2018-05-03 Perforation 4656.00 4656.50 5
2018-05-03 Perforation 4668.00 4668.50 5
2018-05-03 Perforation 4680.00 4680.50 5
2018-05-03 Multi-Stage Fracture 4632.00 4680.50 0
2018-05-03 Perforation 4572.00 4572.50 5
2018-04-28 Perforation 5640.00 5640.50 5
2018-05-03 Perforation 4584.00 4584.50 5
2018-05-03 Perforation 4596.00 4596.50 5
2018-05-03 Perforation 4608.00 4608.50 5
2018-05-03 Perforation 4620.00 4620.50 5
2018-05-03 Multi-Stage Fracture 4572.00 4620.50 0
2018-05-03 Perforation 4512.00 4512.50 5
2018-05-03 Perforation 4524.00 4524.50 5
2018-05-03 Perforation 4536.00 4536.50 5
2018-05-03 Perforation 4548.00 4548.50 5
2018-05-03 Perforation 4560.00 4560.50 5
2018-04-28 Multi-Stage Fracture 5592.00 5640.50 0
2018-05-03 Multi-Stage Fracture 4512.00 4560.50 0
2018-05-04 Perforation 4452.00 4452.50 5
2018-05-04 Perforation 4464.00 4464.50 5
2018-05-04 Perforation 4476.00 4476.50 5
2018-05-04 Perforation 4488.00 4488.50 5
2018-05-04 Perforation 4500.00 4500.50 5
2018-05-04 Multi-Stage Fracture 4452.00 4500.50 0
2018-05-04 Perforation 4392.00 4392.50 5
2018-05-04 Perforation 4404.00 4404.50 5
2018-05-04 Perforation 4416.00 4416.50 5
2018-04-28 Perforation 5532.00 5532.50 5
2018-05-04 Perforation 4428.00 4428.50 5
2018-05-04 Perforation 4440.00 4440.50 5
2018-05-04 Multi-Stage Fracture 4392.00 4440.50 0
2018-05-13 Perforation 4332.00 4332.50 5
2018-05-13 Perforation 4334.00 4334.50 5
2018-05-13 Perforation 4356.00 4356.50 5
2018-05-13 Perforation 4368.00 4368.50 5
2018-05-13 Perforation 4380.00 4380.50 5
2018-05-13 Multi-Stage Fracture 4332.00 4380.50 0
2018-05-13 Perforation 4272.00 4272.50 5
2018-04-28 Perforation 5568.00 5568.50 5
2018-05-13 Perforation 4281.90 4282.40 5
2018-05-13 Perforation 4291.60 4392.10 5
2018-05-13 Perforation 4301.30 4301.80 5
2018-05-13 Perforation 4311.00 4311.50 5
2018-05-13 Multi-Stage Fracture 4272.00 4311.50 0
2018-05-14 Perforation 4212.00 4212.50 5
2018-05-14 Perforation 4224.00 4224.50 5
2018-05-14 Perforation 4236.00 4236.50 5
2018-05-14 Perforation 4248.00 4248.50 5
2018-05-14 Perforation 4260.00 4260.50 5
2018-04-28 Perforation 5556.00 5556.50 5
2018-05-14 Multi-Stage Fracture 4212.00 4260.50 0
2018-05-15 Perforation 4152.00 4152.50 5
2018-05-15 Perforation 4164.00 4164.50 5
2018-05-15 Perforation 4176.00 4176.50 5
2018-05-15 Perforation 4188.00 4188.50 5
2018-05-15 Perforation 4200.00 4200.50 5
2018-05-15 Multi-Stage Fracture 4152.00 4200.50 0
2018-05-15 Perforation 4092.00 4092.50 5
2018-05-15 Perforation 4104.00 4104.50 5
2018-05-15 Perforation 4116.00 4116.50 5
2018-04-28 Perforation 5544.00 5544.50 5
2018-05-15 Perforation 4128.00 4128.50 5
2018-05-15 Perforation 4140.00 4140.50 5
2018-05-15 Multi-Stage Fracture 4092.00 4140.50 0
2018-05-16 Perforation 4032.00 4032.50 4
2018-05-16 Perforation 4044.00 4044.50 4
2018-05-16 Perforation 4056.00 4056.50 4
2018-05-16 Perforation 4068.00 4068.50 4
2018-05-16 Perforation 4080.00 4080.50 4
2018-05-16 Multi-Stage Fracture 4032.00 4080.50 0
2018-05-17 Perforation 3972.00 3972.50 4
2018-04-28 Perforation 5580.00 5580.50 5
2018-05-17 Perforation 3984.00 3984.50 4
2018-05-17 Perforation 3996.00 3996.50 4
2018-05-17 Perforation 4008.00 4008.50 4
2018-05-17 Perforation 4020.00 4020.50 4
2018-05-17 Multi-Stage Fracture 3972.00 4020.50 0
2018-05-17 Perforation 3912.00 3912.50 4
2018-05-17 Perforation 3924.00 3924.50 4
2018-05-17 Perforation 3936.00 3936.50 4
2018-05-17 Perforation 3948.00 3948.50 4
2018-05-17 Perforation 3960.00 3960.50 4
2018-04-28 Multi-Stage Fracture 5532.00 5580.50 0
2018-05-17 Multi-Stage Fracture 3912.00 3960.50 0
2018-05-17 Perforation 3852.00 3852.50 4
2018-05-17 Perforation 3864.00 3864.50 4
2018-05-17 Perforation 3876.00 3876.50 4
2018-05-17 Perforation 3888.00 3888.50 4
2018-05-17 Perforation 3900.00 3900.50 4
2018-05-17 Multi-Stage Fracture 3852.00 3900.50 0
2018-05-17 Perforation 3792.00 3792.50 4
2018-05-17 Perforation 3804.00 3804.50 4
2018-05-17 Perforation 3816.00 3816.50 4
2018-04-29 Perforation 5472.00 5472.50 5
2018-05-17 Perforation 3828.00 3828.50 4
2018-05-17 Perforation 3840.00 3840.50 4
2018-05-17 Multi-Stage Fracture 3792.00 3840.50 0
2018-05-18 Perforation 3732.00 3732.50 4
2018-05-18 Perforation 3744.00 3744.50 4
2018-05-18 Perforation 3756.00 3756.50 4
2018-05-18 Perforation 3768.00 3768.50 4
2018-05-18 Perforation 3780.00 3780.50 4
2018-05-18 Multi-Stage Fracture 3732.00 3780.50 0
2018-05-18 Perforation 3672.00 3672.50 4
2018-04-23 Perforation 5664.00 5664.50 5
2018-04-29 Perforation 5484.00 5484.50 5
2018-05-18 Perforation 3684.00 3684.50 4
2018-05-18 Perforation 3696.00 3696.50 4
2018-05-18 Perforation 3708.00 3708.50 4
2018-05-18 Perforation 3720.00 3720.50 4
2018-05-18 Multi-Stage Fracture 3672.00 3720.50 0
2018-05-18 Perforation 3612.00 3612.50 4
2018-05-18 Perforation 3624.00 3624.50 4
2018-05-18 Perforation 3636.00 3636.50 4
2018-05-18 Perforation 3648.00 3648.50 4
2018-05-18 Perforation 3660.00 3660.50 4
2018-04-29 Perforation 5496.00 5496.50 5
2018-05-18 Multi-Stage Fracture 3612.00 3660.50 0
2018-05-18 Perforation 3552.00 3552.50 4
2018-05-18 Perforation 3564.00 3564.50 4
2018-05-18 Perforation 3576.00 3576.50 4
2018-05-18 Perforation 3588.00 3588.50 4
2018-05-18 Perforation 3600.00 3600.50 4
2018-05-18 Multi-Stage Fracture 3552.00 3600.50 0
2018-05-19 Perforation 3492.00 3492.50 4
2018-05-19 Perforation 3504.00 3504.50 4
2018-05-19 Perforation 3516.00 3516.50 4
2018-04-29 Perforation 5508.00 5508.50 5
2018-05-19 Perforation 3528.00 3528.50 4
2018-05-19 Perforation 3540.00 3540.50 4
2018-05-19 Multi-Stage Fracture 3492.00 3540.50 0
2018-05-19 Perforation 3432.00 3432.50 4
2018-05-19 Perforation 3444.00 3444.50 4
2018-05-19 Perforation 3456.00 3456.50 4
2018-05-19 Perforation 3468.00 3468.50 4
2018-05-19 Perforation 3480.00 3480.50 4
2018-05-19 Multi-Stage Fracture 3432.00 3480.50 0
2018-05-19 Perforation 3372.00 3372.50 4
2018-04-29 Perforation 5520.00 5520.50 5
2018-05-19 Perforation 3384.00 3384.50 4
2018-05-19 Perforation 3396.00 3396.50 4
2018-05-19 Perforation 3408.00 3408.50 4
2018-05-19 Perforation 3420.00 3420.50 4
2018-05-19 Multi-Stage Fracture 3372.00 3420.50 0
2018-04-29 Multi-Stage Fracture 5472.00 5520.50 0
2018-04-29 Perforation 5412.00 5412.50 5
2018-04-29 Perforation 5424.00 5424.50 5
2018-04-29 Perforation 5436.00 5436.50 5
2018-04-29 Perforation 5448.00 5448.50 5
2018-04-29 Perforation 5460.00 5460.50 5
2018-04-23 Perforation 5676.00 5676.50 5
2018-04-29 Multi-Stage Fracture 5412.00 5460.50 0
2018-04-29 Perforation 5352.00 5352.50 5
2018-04-29 Perforation 5364.00 5364.50 5
2018-04-29 Perforation 5376.00 5376.50 5
2018-04-29 Perforation 5388.00 5388.50 5
2018-04-29 Perforation 5400.00 5400.50 5
2018-04-29 Multi-Stage Fracture 5352.00 5400.50 0
2018-04-30 Perforation 5292.00 5292.50 5
2018-04-30 Perforation 5304.00 5404.50 5
2018-04-30 Perforation 5316.00 5316.50 5
2018-04-23 Perforation 5688.00 5688.50 5
2018-04-30 Perforation 5328.00 5328.50 5
2018-04-30 Perforation 5340.00 5340.50 5
2018-04-30 Multi-Stage Fracture 5292.00 5340.50 0
2018-04-30 Perforation 5232.00 5232.50 5
2018-04-30 Perforation 5244.00 5244.50 5
2018-04-30 Perforation 5256.00 5256.50 5
2018-04-30 Perforation 5268.00 5268.50 5
2018-04-30 Perforation 5280.00 5280.50 5
2018-04-30 Multi-Stage Fracture 5232.00 5280.50 0
2018-04-30 Perforation 5172.00 5172.50 5
2018-04-23 Perforation 5700.00 5704.00 5
2018-04-30 Perforation 5184.00 5184.50 5
2018-04-30 Perforation 5196.00 5196.50 5
2018-04-30 Perforation 5208.00 5208.50 5
2018-04-30 Perforation 5220.00 5220.50 5
2018-04-30 Multi-Stage Fracture 5172.00 5220.50 0
2018-05-01 Perforation 5112.00 5112.50 5
2018-05-01 Perforation 5124.00 5124.50 5
2018-05-01 Perforation 5136.00 5136.50 5
2018-05-01 Perforation 5148.00 5148.50 5
2018-05-01 Perforation 5160.00 5160.50 5
2018-04-23 Multi-Stage Fracture 5652.00 5704.00 0
2018-05-01 Multi-Stage Fracture 5112.00 5160.50 0
2018-05-01 Perforation 5052.00 5052.50 5
2018-05-01 Perforation 5064.00 5064.50 5
2018-05-01 Perforation 5076.00 5076.50 5
2018-05-01 Perforation 5088.00 5088.50 5
2018-05-01 Perforation 5100.00 5100.50 5
2018-05-01 Multi-Stage Fracture 5052.00 5100.50 0
2018-05-01 Perforation 4992.00 4992.50 5
2018-05-01 Perforation 5004.00 5004.50 5
2018-05-01 Perforation 5016.00 5016.50 5
2018-04-28 Perforation 5592.00 5592.50 5
2018-05-01 Perforation 5028.00 5028.50 5
2018-05-01 Perforation 5040.00 5040.50 5
2018-05-01 Multi-Stage Fracture 4992.00 5040.50 0
2018-05-01 Perforation 4932.00 4932.50 5
2018-05-01 Perforation 4944.00 4944.50 5
2018-05-01 Perforation 4956.00 4956.50 5
2018-05-01 Perforation 4968.00 4968.50 5
2018-05-01 Perforation 4980.00 4980.50 5
2018-05-01 Multi-Stage Fracture 4932.00 4980.50 0
2018-05-02 Perforation 4872.00 4872.50 5
2018-04-28 Perforation 5604.00 5604.50 5
2018-05-02 Perforation 4884.00 4884.50 5
2018-05-02 Perforation 4896.00 4896.50 5
2018-05-02 Perforation 4908.00 4908.50 5
2018-05-02 Perforation 4920.00 4920.50 5
2018-05-02 Multi-Stage Fracture 4872.00 4920.50 0
2018-05-02 Perforation 4812.00 4812.50 5
2018-05-02 Perforation 4824.00 4824.50 5
2018-05-02 Perforation 4836.00 4836.50 5
2018-05-02 Perforation 4848.00 4848.50 5
2018-05-02 Perforation 4860.00 4860.50 5
2018-04-28 Perforation 5616.00 5616.50 5
2018-05-02 Multi-Stage Fracture 4812.00 4860.50 0
2018-05-02 Perforation 4752.00 4752.50 5
2018-05-02 Perforation 4764.00 4764.50 5
2018-05-02 Perforation 4776.00 4776.50 5
2018-05-02 Perforation 4788.00 4788.50 5
2018-05-02 Perforation 4800.00 4800.50 5
2018-05-02 Multi-Stage Fracture 4752.00 4800.50 0
2018-05-03 Perforation 4692.00 4692.50 5
2018-05-03 Perforation 4704.00 4704.50 5
2018-05-03 Perforation 4716.00 4716.50 5

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-04-23 2018-05-19 3,187 46,895 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water 7732-18-5 100 92.069 N/A
FRAC SAND. 40/70 WHITE BJ Services Crystalline Silica (Quartz) 14808-60-7 100 3.4792 N/A
FRAC SAND.70/140 OR 50/140 CANADIAN BJ Services Crystalline Silica (Quartz) 14808-60-7 100 3.5577 N/A
Hydrochloric Acid 28% BJ Services Acid Hydrochloric acid 7647-01-0 100 0.4496 N/A
Water 7732-18-5 100 0.4496 N/A
Alpha 544 BJ Services Bactericide/Biocide 2.2-Dibromo-3-nitrilopropionamide 10222-01-2 100 0.0088 N/A
Dibromoacetonitrile 3252-43-5 100 0.0088 N/A
Polyethylene Glycol 25322-68-3 100 0.0088 N/A
Sodium Bromide 7647-15-6 100 0.0088 N/A
Water 7732-18-5 100 0.0088 N/A
Breaker HP BJ Services Breaker Ethylene glycol 107-21-1 100 0.0101 N/A
Non-hazardous Not Available 100 0.0101 N/A
tert-Butyl hydroperoxide 75-91-2 100 0.0101 N/A
Water 7732-18-5 100 0.0101 N/A
BF-9L BJ Services Buffer potassium carbonate 584-08-7 100 0.0259 N/A
Potassium hydroxide 1310-58-3 100 0.0259 N/A
Water 7732-18-5 100 0.0259 N/A
CC-2 BJ Services Clay Control Choline chloride 67-48-1 100 0.0998 N/A
Non-hazardous Not Available 100 0.0998 N/A
Water 7732-18-5 100 0.0998 N/A
CI-27 BJ Services Corrosion Inhibitor Fatty acids 61790-12-3 100 0.0035 N/A
Methanol 67-56-1 100 0.0035 N/A
Modified thiourea polymer 68527-49-1 100 0.0035 N/A
Olefin 64743-02-8 100 0.0035 N/A
Polyoxyalkylenes 68951-67-7 100 0.0035 N/A
Propargyl alcohol 107-19-7 100 0.0035 N/A
XLW-30SR BJ Services Crosslinker Acrylic Polymer 97953-25-8 100 0.0228 N/A
Ethylene glycol 107-21-1 100 0.0228 N/A
Inorganic Borates 1319-33-1 100 0.0228 N/A
Polysaccharide 11138-66-2 100 0.0228 N/A
Water 7732-18-5 100 0.0228 N/A
FP-12L BJ Services Defoamer Methylcellulose 9004-67-5 100 0 N/A
Non-hazardous Not Available 100 0 N/A
Octamethylcyclotetrasiloxane 556-67-2 100 0.0001 N/A
Polydimethylsiloxane 63148-62-9 100 0 N/A
Water 7732-18-5 100 0 N/A
D-3 BJ Services Demulsifier Ethoxylated alcohol. branched 78330-19-5 100 0.0009 N/A
Isopropanol 67-63-0 100 0.0009 N/A
Methanol 67-56-1 100 0.0009 N/A
MaxPerm-20A BJ Services Friction Reducer Non-hazardous 9014 100 0.106 N/A
Oxyalkylated alcohol 9014 100 0.106 N/A
Petroleum distillates 64742-47-8 100 0.106 N/A
Polyacrylate 9014 100 0.106 N/A
GW-3 BJ Services Gelling Agent Guar Gum 9000-30-0 100 0.0309 N/A
Ferrotrol 800 BJ Services Iron Control Trisodium nitrilotriacetate monohydrate 18662-53-8 100 0.0039 N/A
ScaleTrol 14 BJ Services Scale Inhibitor Phosphinocarboxylic acid copolymer 110224-99-2 100 0.0106 N/A
Water 7732-18-5 100 0.0106 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2018-04-27 2018-05-20 Surface Water - Lake 50845

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2018 3155 0.0 0.0 0.0
2019 7900 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-02-10 No Incident Encountered 0.00 0.00
2018-06-08 No Incident Encountered 0.00 0.00

For data sources see[10]

References